MICE Collaboration Meeting March 29 - April 1, 2004 -- CERN MICE alignment, tolerances and supports Tuesday March 30 Room 17-1-007 Edgar Black/IIT March17-

Slides:



Advertisements
Similar presentations
Pneumatic Cylinders Chapter 3.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
CE En 112 Engineering Drawing with CAD Application
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
Vacuum Vessel Production Readiness Review
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
5/7/2003Edgar L. Black IIT MICE Meeting at Columbia University Hydrogen/Focus Module Components assembly Details concept June 13,2003.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Progress on the Coupling Coil & Focus Coil Interface Engineering
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
5/7/2003Edgar L. Black IIT MICE Integration Meeting Hydrogen/Focus Module Components Details development May 9, 1003.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Bridge Modules BKK and BKR
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Dimensioning and Tolerancing
LASER AND ADVANCES IN METROLOGY
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
1 SheetCourse: Engineering Graphics 1504Memorial University of Newfoundland Engi 1504 – Graphics Lecture 5: Sectioning and Dimensioning l Sectioning an.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
The integration of 420 m detectors into the LHC
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
BM&N STS ladders assembly in VLHEP
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
MICE Partial Return Yoke Mechanical Design
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Hall C Down Stream Beam Pipe And Dump Interface Design
Industrial Applications
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
I Alexander Nass for the JEDI collaboration
Additional Upstream Coil Shielding
Experimental equipment Edgar L. Black February 17, 2019
Challenges and Deadlines for Production
BGC Collaboration Meeting –
Presentation transcript:

MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March Room

Alignment considerations What are we aligning A thought on alignment reference Considerations for tolerances Features of integration, design requirements Proposed designs solutions Support structures & transport concepts

What are we aligning The MICE cooling channel: 3-AFC modules 2-RFCC modules all the up beam and down beam measuring devices 2- Spectrometer detector modules 2- of each cherenkov, TOF, calorimeter and shielding The vacuum vessels in the cooling channel and the detectors constitute the structural support for the above components and are the essential reference for the alignment A major engineering challenge on alignment are the super conducting magnets by their shrinkage during cooling and by their large magnetic forces

Magnets lattice with shrinking estimated values ( black color numbers are the initial dimensions for alignment at room temperature) additional alignments are preformed after shrinkage.

Assembled MICE experiment lattice

Reference for the alignment The beam to be processed is the reference to which the lattice shall be aligned to It is proposed that line representing the center of the beam be the initial reference for alignment Targets installed on the outside of the modules vacuum vessels are calibrated to the line representing the beam inside This targets will be referenced to surveyors fixed bench marks in the RAL facility.

Tolerances considerations It is established that the modules vacuum vessels are the structural supports for the magnets they are the fulcrum for the alignment of MICE which demand careful selection of tolerances for their construction Industry has advanced on the tooling and the methodology for the fabrication of this vessels as shown in the samples on next pages

Custom engineered chambers are designed and manufactured using state of the art metal machining equipment as well as conventional machining and welding tools. Chamber fabrication tolerances have been optimized for cost-effectiveness and reproducibility. Unless specified otherwise the typical dimensional tolerances applied to all chamber fabrications shall be as follows... Chambers 24 inches in length or shorter will carry a ±0.02 inch linear tolerance. Chambers longer than 24 inches but shorter than 72 inches will carry a ±0.06 inch linear tolerance. All chambers will carry a minimum ±0.50° angular tolerance. Deviations from these specifications must be discussed with the MDC technical sales engineers for feasibility and cost

A, B and C are focal points. The Base flange sealing surface rests on a Reference plane. The zero point (0,0,0) is selected for symmetry and simplicity Ports are aimed at various focal points within the chamber. Chamber Cross Section with zero point The central reference point, or zero point, is given XYZ coordinates of (0,0,0). All focal point dimensions are measured from the zero point. Port lengths and angles are measured from focal points.

Example: Select Port Number 14 Port 14 spherical coordinates The polar angle of a port is measured in a vertical cutting plane that includes the focal point of the port and the centerline of the port. The azimuthal angle of a port is measured as a projection of the port centerline onto a horizontal focal plane that includes the focal point of the port. Port 14 is aimed at focal point C The cutting plane is vertical and passes through C The cutting plane is rotated about a vertical line through C to include the centerline of Port 14 The polar angle of 25° is measured in the cutting plane The azimuthal angle of 55° is measured in the focal plane

Integration of modules Ones the modules vacuum vessels are fabricated to specs the assembly between modules shall have the following requirements: 1. Primarily maintain the required separation to permit the extraction or removal of the AFC modules 2.Rigidly lock the vessels against internal and external forces in all directions 3.Maintain the vacuum inside the vessels and 4.provide a quick mean for the assemble and disassemble of the module form the lattice Several concepts are in consideration as presented on the next page proposed solutions

Proposed solutions Flex plates at the ends of the vessels

Existing design with a Gap of 9.7mm only

Option 1 – bellow type retractable seal

Option 2 – concertina type retractable seal Variation of the previous to facilitate assembly

Belt clamp arrangement Few bolts to clamp

Support structures & transport concepts For access to the inside of the AFC or RFCC modules for tuning, maintenance or other reasons, requires to remove any one of the modules from the lattice for each case; however, it will be to own advantage no to remove the RFCC after it is being tuned and aligned. The performance of this operation requires a careful controlled guided movement so not to tilt or twist the module within the narrow < 2cm gaps at each side The center of gravity of each module shall be carefully evaluated for the location and design of their support Several concepts are to be evaluated against the following requirements: 1.The modules support structures shall have provisions to allow anchoring at the in and out of the lattice positions 2.Shall provide means for the alignment of the module within a given value TBD