IT Project Management Weeks 2 and 3. Topics of Discussion Introduction Identify the Business Case Scope the Project Plan the Project Delivery and Outcome.

Slides:



Advertisements
Similar presentations
Project Management.
Advertisements

Project management.
PROJECT RISK MANAGEMENT
Strategic Planning An Overview. General Definition The process of strategic planning involves deciding where you want to go, how you want to be positioned,
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Systems Analysis and Design 9th Edition
Project Management Workshop. Nick Cook  Citigroup Corporate and Investment Bank  European Technology Business Office Manager Edinburgh University April.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 Project management.
Modern Systems Analysis and Design Third Edition
What is a project? Project Management Institute definition
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project Management Session 7
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Project Management Basics
贾银山 Software Engineering, Chapter 5 Slide 1 Project management.
1 Software Engineering Muhammad Fahad Khan Software Engineering Muhammad Fahad Khan University Of Engineering.
©Ian Sommerville 2000Software Engineering, 7th edition. Chapter 5 Slide 1 Chapter 5 Project Management Modified by Randy K. Smith.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
Initiating and Planning Systems Development projects
Topic 2- 1ICT 327 Management of IT Projects Semester 1, 2005 Topic 2 Project Planning & Initiation Schwalbe: Chapter 3 Compiled by Diana Adorno and contributions.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Project management DeSiaMore 1.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management Skills & Tools Michelle Sced Research Development Coordinator Division Research Skills Day – 9 March 2007.
BUSINESS PLUG-IN B15 Project Management.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Lecture 4 Title: The Scope Management Plan
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Management & Development of Complex Projects Course Code MS Project Management Risk Management Framework Lecture # 22.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Lecture 3 Managing the Development Project SFDV Principles of Information Systems.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
GLOBAL SCHOOL OF PROJECT MANAGEMENT UNIVERSITY FOR INTERNATIONAL COOPERATION Ing. Osvaldo A. Martínez Gómez, MAP, MSc. Essential Topics - Project Management.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Business Plug-In B15 Project Management.
Dr Izzat M Alsmadi Edited from ©Ian Sommerville & others Software Engineering, Chapter 3 Slide 1 Project management (Chapter 5 from the textbook)
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
Managing programs that promote personal effectiveness.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management 1/30/2016ICS 413 – Software Engineering1.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Chapter 7 Project Management and Event Implementation
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
Project management Chapter 5. Objectives To explain the main tasks undertaken by project managers To introduce software project management and to describe.
Chapter 6: Database Project Management
Project Management.
Chapter 3 Managing the Information Systems Project
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
Presentation transcript:

IT Project Management Weeks 2 and 3

Topics of Discussion Introduction Identify the Business Case Scope the Project Plan the Project Delivery and Outcome Closing the Project

Overview This session will introduce participants to a systematic approach to managing IT projects, whether those projects are simple or complex. Learning Outcome At the end of this session participants should be able to apply project management skills through a 5 phase process to manage IT projects. Introduction

Project Management is a process that clearly articulates a required outcome by bringing together human and other resources necessary to successfully achieve that outcome. Project Characteristics: Goal Oriented Finite life span Unique once-off effort Cost Limit Project Management functionalities involve: Planning Directing Organising Controlling Definition

Project Client/Owner(s): Individuals instigating the project and who will sign-off on the project outcome, deliverables, and performance criteria. Roles and Responsibilities Project Sponsor: The person nominated by project client/owner(s) to ensure the project achieves intended outcomes and receives appropriate support.

Roles and Responsibilities Influencers: Those who have the potential to impact the success of the project but are not directly involved in the project. Team Members: Those directly assisting to plan and ensure activities are completed. Note: Not all these roles will be involved in every project

1. Identify Business case: Does the project contribute to priority business requirements? 5-Phases of Project Management 2. Scope the project: What needs to be achieved? 3. Plan the project: What needs to be done? Note: This approach is suitable for simple as well as complex projects. 4. Deliver the Outcome: How are the plans to be implemented? 5. Close the project How to finalize? What has been achieved?

Topics How business projects should originate? Impact of Resource Limitation. How to construct a project management framework best suited to an organisation? 1. Business Case

Business Planning The planning process should result in identification of initiatives that are required to achieve the strategic direction in which the business wants to move. These will generate a number of projects which are important to the future success of the business. The projects need to be prioritised. 1. Business Case - How business projects should originate?

Process improvement A performance review of business processes in work areas may indicate the need to improve. An assessment of resources required compared to the return on investment needs to be made. If the effort is thought to be worthwhile, projects will be generated. The use of available resources and priorities will determine which projects are to be undertaken.

1. Business Case - Resources Resource Limitation Key factor in the success of IT projects is the availability of sufficient resources. Most managers have a limited budget and limited human resources. Therefore the selection of projects which best support the strategic direction of the business is essential.

Why do we need a framework? Organizations have different ways to do business. However when managing projects, it is very useful to consider the following questions: Selecting the project How will the project be selected? Identifying people involved Who should be involved? (Sponsor, project manager, team) 1. Business Case – Project Framework

Scoping the project What needs to be achieved? Who will sign-off? Agreeing the budget What resources are required? Who signs-off on budget? 1. Business Case – Project Framework

Agreeing Variations How can the project be varied? Who signs-off on variations? Signing-off Project Completion Who will sign-off? How will any transaction take place? 1. Business Case – Project Framework

Topics Project outcome statement Project deliverables and associated performance criteria Roles and responsibilities of people involved in projects Factors to be considered when selecting a project team Importance of project sign-off 2. Project Scope

The outcome statement concisely and clearly expresses the reason for the project. They normally specify what, where and when The statement should specify the intent of the project, therefore it should reflect the requirements of the project client. It normally commences with a verb to specify what needs to be done. Example: Implement an online bank loan management system for all employees of the loan department by 11/05/ Project Scope – Outcome Statement

Project Parameters Projects often have boundaries (parameters) placed on them. Example: The project involving the implementation of the on-line bank loan system can be limited to: Australian operations 2. Project Scope – Parameters and Constraints Project Constraints Time Cost Regulations – e.g tax compliance Compatibility with existing system

Project Assumptions When scoping the projects assumptions are made which can impact the ability to achieve the project outcome. Example: Availability of other parties Appropriate hardware 2. Project Scope – Assumptions and Risks Project Risks Key assumptions should be noted as they have associated with them a degree of risk.

Deliverables often : Identify major steps Provide reference points to track a project’s success. Some deliverables will be non-negotiable and specified as part of the project scope. Others will be identified when planning the project. 2. Project Scope – Deliverables

Performance criteria should be associated with the outcome statement and deliverables to allow the projects performance to be evaluated. Measures can be quantitative or qualitative Example:Implement an online bank loan system for all employees of the loan department by 11/05/2002. System to be piloted and operational by 11/05/2002 Loan sanction time reduced by 50% 2. Project Scope – Performance Measurement

When selecting a team: Cover the experience/expertise the project requires Choose people committed to the project outcome Consider stakeholders and influencers. 2. Project Scope – Team Selection

Sign-off, of the project scope, by the project client will ensure: The outcome statement reflects the project intention. Project parameters and constraints are appropriate. Project deliverables and criteria are acceptable. 2. Project Scope – Sign-off of project Scope

Topics Identify tasks using work breakdown structure Complete action plans Construct Gantt chart Determine project budget Write prevention and contingent scenarios for significant project risks 3. Planning the Project

Work Breakdown Structure (WBS) It is a logical structuring of project work. STEP1: Identify the key activities required to achieve the outcome. STEP2: The identified activities are broken down into tasks and if the project is complex enough, sub tasks and beyond. The key activities may often identify the DELIVERABLES for the project. 3. Planning the Project – Identifying Tasks

3. Planning the Project – WBS Task 2.2 Outcome Activity 1 Activity 2 Task 1.1 Task 1.2 Task 1.3 Task 2.1 Task 2.3

3. Planning the Project – Action Plan Activity No:__________________________ TasksWhoCostWhen Scheduling of tasks Estimating duration of each task Total Cost:

3. Planning the Project – Scheduling 1.Network Diagrams A network diagram shows the sequence and dependencies of tasks required to complete the project. a c b d f e ActivityDependency aNone ba ca da ed fb,c - event or nodes - activity/task - dummy activity/task Pert Method

3. Planning the Project – Scheduling 2. Gantt Chart The Gantt Chart is a simple representation of the activity/tasks against time. Often utilized when presenting project plan as they are more easily understood by an audience not involved in the intimate detail of the project.

3. Planning the Project – Budget TaskTime CostDollar Cost Total Cost The total cost of the project can be calculated once all the action plans have been completed.

3. Planning the Project – Risk Management SIGNIFICANT RISKS CONTINGENT PLANSPREVENTIVE PLANS Actions to reduce the likelihood of the risk Action planned in case the events occur

3. Planning the Project – Sign-off of Plan/Budget Sign-off of the project plan and budget by the project client/owner will ensure expectations are clear for: project timing resource consumption, and dollars

Topics Discuss the elements required for “start-up”. Discuss operating procedure. Determine information system requirements. 4. Delivering the Outcome

4. Delivering the Outcome – Project Start-up The project start-up requires the following elements: appointing and developing the project team acquiring equipment and materials obtaining the necessary space and facilities

4. Delivering the Outcome – Team Roles Team Skills Successful Team += Team Roles T ogether E veryone A chieves M ore

4. Delivering the Outcome – Information System This is a communication process through which a project manager, team, sponsor and other key players receive information regarding the project’s progress. Who we need to communicate with The mode we will use to communicate When/How often we will communicate

Topics Identify requirements to phase out the project Discuss the value of reviewing the the project management framework 5. Closing The Project

Managing disposition of people on the team, and no longer required materials and facilities obtaining final sign-off preparing a final report 5. Closing The Project – Phasing Out

If the project has been scoped correctly, the results should be clear from: the outcome statement, the deliverables, and the list of performance criteria, including acceptable outcomes from a test team. 5. Closing The Project – Reviewing Results

5. Closing The Project – Process Review The various processes involved in managing the project should be assessed. Team selection Communications Project Definition Scheduling Budgeting Testing Look at the strengths – repeat them Examine the weaknesses – eliminate them