Standard Rung 30mm 385mm 350mm 10mm 111mm 2mm47mm77mm107mm 147mm177mm207mm 236mm272mm302mm332mm355mm 378mm.

Slides:



Advertisements
Similar presentations
Twisted Pair Cable Dense assembly (OD 5-7 mm) with –Twisted pairs : total 21; 44-pin mm dual row Omnetics connector differential signals single-ended.
Advertisements

Using three IR sensors, SensingBot can sense the front obstacles so it can avoid them. Sensing.
Matti Iskanius Link system board size scenarios Scenario mm boards, crate on the front of the rack + no major changes in layout (minimum.
NA62 GTK Cables & Patch Panels. TCC8_GTK1 TCC8_GTK2_GTK3.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
M1M2M3M4M5M6 M10 M20 M30 M40 M50 M M1M2M3M4M5M6.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014.
ITOP LV power supply and cable scheme G. Visser Indiana University 3/17/2015.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
ZTF Interconnecting Scheme Stephen Kaye
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Oct 29, 2001 Ron Sidwell 1 Purple Card. Oct 29, 2001 Ron Sidwell 2 Purple Card Spec Two channels per printed circuit board Size ~20 sq. in. or best effort,
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Twisted Pair Cable A.Nomerotski 12/12/02  Dense assembly (OD 5-7 mm) with u Twisted pairs : total 21; 44-pin mm dual row Omnetics connector s differential.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
CABLING SYSTEM PROTECTION. Screening/Shielding  1 In the Signamax Cabling System for the efficient screening of the telecommunications systems, the screen.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
12/10/01 - Cecilia Gerber UIC Slide 1 Testing Card specifications l Will be used in the Run2b SASEQ-based test stands  needed. Build 75, two.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Calibration and monitoring system for FPD to check the response of the MAPMT and L0PMT as it involves in time ( + to see if we have any dead channels +
Mauro Citterio - Mi meeting
Integration and Services RE3/1 and RE4/1
Rack Design Proposal as of 01/03/2013
Integration and Services RE3/1 and RE4/1
DCS: Temperature Probes
Cooling pipes and Space for Services
Christian Veelken last updated 11/09/06
T1 Electronic status Conclusions Electronics Cards:
HB RM prototype component status
HPS Motherboard Electronic Design
Chamber Design and Integration RE3/1 and RE4/1
ALICE Muon Tracking Upgrade EDR Answers
Electronics for RPC Upscope
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
VeLo Analog Line Status
Pierluigi Paolucci - I.N.F.N. Naples
Electronics: Demod + 4Q FE
Services mock-up Full-scale mock-up of one half end-cap.
RPC HV&LV status Introduction HV power supply tender
Overview of T1 detector T1 is composed by 2 arms
HCAL HV splice box.
Preparation for Installation at ESS
Presentation transcript:

Standard Rung 30mm 385mm 350mm 10mm 111mm 2mm47mm77mm107mm 147mm177mm207mm 236mm272mm302mm332mm355mm 378mm

Top Rung Down 140mm 154mm54mm 68mm 135mm We need 8 or 9 of these made from standard rungs

Second Rung 194mm 10mm 2mm We need 16 of these made from standard rungs

Half Rung Up 154mm54mm We will have to machine these from the current half up types if they have been made in sufficient numbers we need 8 or 9

Half Rung Down These may well have been made already we need 8 or 9

data 30mm 36mm 215mm 394mm 573mm752mm931mm1110mm1289mm Down Type Column 6mm 52mm HRD 2nd Std TRD

data 30mm Up Type Column 52mm7mm 82mm 261mm440mm619mm798mm977mm1156mm 1335mm 2nd Std HRU

End Pieces

Card Layout 30mm 20mm 100mm 3mm 24mm 3mm 90mm 10mm 23mm 30mm 423mm HPDs Level-0 Fibre Channel Low Voltage High Voltage

Voltage solution HV power out of column with minimum of bending Other Cables can make S bend reasonably easily For columns close to top of crate HPDs

End Pieces Voltage solution HV power LV power HV mon LV mon Si Bias

Voltage solution All cables can exit form the back of the column if there is the space available For columns far from the top of crate This also allows the voltage patch panel to be in line with the cable port in the shield

Low Voltage Power

Low Voltage Sense Two 2 pin lemo cables – with approximately cat5 thickness and stiffness

High Voltage Power Have to redesign end piece to allow these very thick cables to exit column satisfactorily. Can unbolt from patch panel and feed through so not too much compliance required.

HV monitoring Goes to one 15pin sub D – may be a problem with different lengths of cables

Silicon Bias A single lemo cable – Can it come from the C board?

SPECS/ECS Single RJ45 Network Cable

Temperature Monitoring Flat cable going to 37pin Sub-D

Data Fibres 24 Fibres going to 2 break out boxes. Need to be careful of bending just after boxes. Need to be very careful of loop. Spare fibres go down front U channel by HPDs. Concerned about space for loop before patch panel. Doesn't show looping round the Lo boards to use uip fibre length

TTC Fibres 7 TTC control fibres – occupying the same space as the data fibres. Loop could be sooner to avoid too much conflict as no break out boxes to worry about.