NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP

Slides:



Advertisements
Similar presentations
FUTURE NTDC PROJECTS UPTO
Advertisements

Monthly Progress Report on NTDC Development Projects for May, 2013
Cool Chain Development in Pakistan. Why Cool Chain ? Around 20-40% of the horticulture produce is wasted in post harvest stage In financial terms, loss.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER Monthly Progress Report on NTDCL Development Projects for September, 2013.
NTDC Projects for which Financing is Required
POLIO CAMPAIGN Feb. 15 – 17, 2010 Gujranwala G.T. Road near Lari Adda – 60x20.
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER MONTHLY PROGRESS REPORT on NTDC DEVELOPMENT PROJECTS for January, 2013.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Brief on HVDC 2015 Brief on HVDC 2015
LOAD FORECAST SECTION 1. 2 FORECAST METHODOLOGIES & TOOLS i.Power Market Survey (PMS) Medium Term (5-10 years) ii.Regression Long Term (25-30 years) LOAD.
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
FUTURE NTDC PROJECTS UPTO
By: Anas lukman & Jibran Farooq 8E. The Mangla Dam is located on the Jhelum River in the Mirpur District of Azad Kashmir, Pakistan. It is the 16th largest.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending Dec.2012 PLANNING POWER.
Quarterly Report on NTDC Development Projects
SAUDI ELECTRICITY COMPANY (SEC)
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
1 GEPCO 2 nd WORKSHOP ON POWER SECTOR REFORMS November 11 & 12, 2010.
NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012.
PRESENTED TO: Mam. Ammara Ikram Presented By: Muhammad Ajmal (BIT-07-12) Shahbaz Hussain (BIT-07-26) Sultan Salahuddin (BIT-07-46) Muhammad Faisal (BIT-07-49)
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
Paint Your Districts Prepared by: Information Management Unit FAO, Pakistan Contact for more information: 1.To edit the districts with.
N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Financial Management for Senior Public Sector Officials Group 4 Final Course Project Preparation on PESCO (Sub-Project) Energy Loss Reduction Presenters:
Top 10 Amazing Achievements Of Pakistan In Science And Technology Lesson prepared for Preps.
Should Pakistan leapfrog the developed world in broadband? Rizwan Tiwana Chief Technical Officer Wateen Telecom International Networking and Communications.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Iraqi kordistan Region Iraqi kordistan Region Click Click Back Iraq Map.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending March, 2013 PLANNING POWER.
INVESTMENT OPPORTUNITIES IN POWER SECTOR OF PAKISTAN
Rural Banking - Background Pakistan has great potential in agriculture. About 27% of the total 80 million hectares of the country is under cultivation.
IndicatorTarget Teacher Presence 90% for all districts every month Student Attendance Districts are divided into category A, B & C, based on past performance.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
SEMINAR ON ENERGY: ELECTRICITY TRANSMISSION A presentation to the KENYA – SPAIN MULTILATERAL PARTNERSHIP MEETING By Dr. (Eng.) John M. Mativo Chief Manager.
BANGALORE TRANSMISSION PLANNING
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER DEPARTMENT MONTHLY REPORT ON NTDC DEVELOPMENT PROJECTS PLANNING POWER May, 2012.
NTDC ONGOING DEVELOPMENT PROJECT SR. NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 1 Ext. at.
URBAN POLICY AND GOVERANCE AND INTITUITIONS Parvez Latif Qureshi 1.
China-Pakistan Economic Corridor (CPEC)
Potential of Uzbekistan’s energy system and proposals for cooperation development with Korean companies STATE JOINT STOCK COMPANY «UZBEKENERGO» uzenergy.uzpak.uz.
Hanoi, October GROWTH RATE OF ELECTRICITY DEMAND Growth rate of Electricity consumption, period Growth rate of Electricity consumption,
Population – 2015 (Million)(2) Energy Generated (TWh) (1)
Energy Sector Pakistan
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
Chief Minister’s School Reforms Roadmap
Role of Diaspora in Economic Corridors Development (ECD) in Pakistan
Power Generation Sector OF Pakistan
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Chief Minister’s School Reforms Roadmap
Presentation transcript:

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected commissi-oning 1 220 kV Gujrat 3x250 220 kV Mangla-Ghakkar D/C In/Out at Gujrat (2+2 km) 2805 33 22.10.2007 JICA 2011-12 2 220 kV Chishtian 2x250 220 kV Vehari - Chishtian D/C T/Line. ( 65 km) 3740 44 3 500 kV New Lahore 2x750 Two 500 kV S/C T/Lines for In/out of 500 kV Sahiwal – Lahore S/C at Lahore New (15+15 km) 12665 149 09.12.2010 2012-13 Two 500 kV S/C T/Lines for In/out of 500 kV Lahore – Gujranwala S/C at Lahore New (50+50 km) 220 kV D/C T/Line for In/out of 220 kV NKLP-Ghazi Road at Lahore New. (50 km) 220 kV D/C T/Line for In/out of 220 kV NKLP-Wapda Town at Lahore New. (54km)

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected Year of commissi-oning 4- 500 kV Shikarpur 2x600 Two 500 kV S/C T/Lines for In/out of 500 kV Dadu-Guddu circuit No:1 at Shikarpur (20+20 km) 8160 96 09.12.2010 JICA 2012-13 Two 500 kV S/C T/Lines for In/out of 500 kV Dadu-Guddu circuit No:2 at Shikarpur. (22+22 km) 220 kV D/C for In/Out of 500/220 kV Guddu – Sibbi S/C at Shikarpur (50 km)

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected Year of commissi-oning 5- 2nd source of supply to Islamabad University - 220 kV D/C T/L for In/out of Manshera- Islamabad T/L (40 km) 1105 13 PC-I under preparation ADB Tr-IV 2012-13 6- 2nd Source of supply to Hala Road Grid Station 220 kV D/C T/L from T.M Khan Road to Hala Road (30 km) 850 10 7- 220 kV Chakdara 2X250 220 kV Chakdara – Mardan (85 km) 3230 38 2013-14 8- 220 kV Mirpur Khas 2x160 220 kV D/C T/L from Hala Rd. to .M.Khan . (10 km) In/Out of one circuit of above 220 kV proposed T/L at Mirpur Khas New (70 km). 2975 35

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected Year of commissi-oning 9- 220 kV Taxila. 2x250 In/Out of 220 kV Burhan - ISPR S/C at Taxila. (6 km) 2295 27 PC-I under preparation ADB Tr-IV 2013-14 10- 220 kV Nowshera 3x250 220 kV D/C T/L for In/Out of G.Brotha Sh/Bagh T/L at Nowshera (5+5 km) 1876 31 06.02.2008 ADB Tr-II Ext 11- 220 kV Chiniot. Industrial 220 kV Gatti - Ludewala D/C In/Out at Chiniot Ind. (2+2 km) 2380 28 PC-I submitted to GoP 12- Dispersal of Power from Uch-2 - 220 kV Uch-II – Sibbi D/C (125 km) 2975 35

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected Year of commissi-oning 13- Augmentation of 500 & 220 kV existing substations - 3825 45 PC-I submitted to GoP in Aug,2010 ADB Tr-I (Ext-II) 2013-14 500 kV Rewat 1x750 500 kV Sh. Muhammadi 4x250 220 kV Mardan 2x250 220 kV Burhan 220 kV Bund Rd 220 kV Bahawalpur 220 kV Quetta Industrial 2X250

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected Year of commissi-oning 14- 220 kV Manshera 2x160 In/out of 220 kV Alai Khawar-Sangjani T/L at Manshera (0.5+.0.5 km) 1105 13 PC-I submitted to GoP Iranian Loan 2013-14 15- 220 kV D.M Jamali 1x160 1x100 in/out of 220 kV Uch-Guddu S/C at D.M. Jamali (5 km) 850 10 PM’s Fund 16- Interconnection of 1200 MW AES Imported coal based Power Plant near Karachi (Part-I) - 500 kV Jamshoro--R.Y.K (535 km) 500 kV Moro-Dadu (55 km) 25330 298 PC-I cleared by CDWP on 18.03.2010 ADB Tr-III 2015-16 17- 220 kV Shadman 2x250 220 kV D/C cable from Shadman to Bund Road (30 km) 4250 50 PC-I under preparation Chinese Development Bank

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected Year of commissi-oning 18- 500 kV Faisalabad New 2x750 In/out of 500 kV Muzaffargarh – Gatti 1st circuit at at Faisalabad new (1+1 km) 6630 78 PC-I under preparation Chinese Development Bank 2013-14 2x250 220 kV Faisalabad New – T.T Singh D/C T/Line (70 km) 19- 220 kV M-3 Industrial Estate Faisalabad 220 kV M3 Industrial Estate – Faisalabad New (70 km) In/Out of 220 kV Faisalabad New - M3 Industrial Estate at 220 kV Chinot Industrial New (30 km) 3570 42

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected Year of commissi-oning 20- Power Dispersal from 747 MW CCPP at Guddu - 500 kV Guddu New PP – M. Garh (256 km) In/Out of Guddu – Multan at New Guddu (10+10 km) 7735 91 PC-I under preparation Chinese Development Bank 2013-14 21- Interconnection of 1200 MW AES Imported coal based power near Karachi (Part-II) 500 kV switching station at Matiari 500 kV S/C T/Line from AES Power Plant to Matiari switching station (200 km) In/Out of 500 kV Hub-Jamshoro S/C T/Line at AES (45+45 km) In/out of 500 kV Jamshoro-R.Y.K at Matiari (5+5 km) 14450 (PC-I cleared by CDWP on 18.3.10) 170 2015-16

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected Year of commissi-oning 22- UAE Combined Cycle power plant at GTPS Faisalabad 1x160 In/out of existing 220 kV T/lines at Proposed power plant 1700 20 PC-I approved by ECNEC Chinese Development Bank 2015-16 23- Interconnecti on of 1200 MW Engro & 1200 MW PEPCO’s Thar Coal Based Power Plants at Thar - 500 kV D/C T/L form Thar coal power plants to Matiari (275 km) 500 kV HVDC Matiari –Lahore/ Faisalabad T/L (1100 km) Terminal Stations at both ends 88400 1040 PC-I under preparation 24- Dispersal of Power from 969 MW Neelum Jhelum HPP 500 kV Neelum Jhelum – Gujranwala D/C T/Line (235 km) 19125 225 Revised PC-I under preparation

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected Year of commissi-oning 25- Interconnecti on of 1200 MW Imported coal based PPIB and 1000 MW Imported Coal based PEPCO’s power Plants at Karachi - Two 500 kV circuits from Power Plants to Matiari (200 km each) 500 kV HVDC Matiari – Lahore/Faisalaba d T/L (1100 km) Extension of Terminal Stations at both ends 85000 1000 PC-I under preparation Chinese Development Bank 2015-16 26- Interconnecti on of 2x1000 MW Nuclear Power Plants at Karachi Three 500 kV Circuits from Nuclear Plants to Matiari (200 km each) 25500 300 2018-19

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project Transfor-mer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Estimated Cost (Rs. in Million) Eqt. US$ in Million Approval by ECNEC Financing Expected Year of commissi-oning 27- Dispersal of Power from 720 MW Karot HPP - 500 kV Karot – Lahore New (270 km) In/Out of 500 kV Neelum Jhelum – Gujranwala at Karot (10 km) 13250 156 PC-I under preparation Chinese Development Bank 2018-19