GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
Advertisements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: David J.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 11 ACD Subsystem1 GLAST Large Area Telescope: AntiCoincidence Detector.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Sections 1-2 Anticoincidnce Detector Overview and Management 1 GLAST Large Area Telescope: AntiCoincidence.
GLAST LAT ProjectSept 3, 2003 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 11 ACD Subsystem1 GLAST Large Area Telescope: AntiCoincidence Detector.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectSLAC Internal LAT Review April 16-18, 2002 Section 7.3 AntiCoincidnce Detector Overview 1 GLAST Large Area Telescope: AntiCoincidence.
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Overview.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 4 Tile Detector Assemblies 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) WBS
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectPMT Procurement Review May 24, 2002 AntiCoincidence Detector Design Overview 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD)
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
GLAST Large Area Telescope
GLAST LAT System Engineering
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead NASA/GSFC/Code 568 Gamma-ray Large Area Space Telescope

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 2 Outline  ACD I&T Overview  I&T Assembly/Integration Flow  Electrical Interface and Integration  Performance Verification  Environmental Testing  Performance Tests  I&T Level Communication  Key I&T Schedule  Summary

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 3 ACD I&T Overview ACD I&T Overview  ACD I&T is the focal point of ACD integration activities I&T team plans and manages activities ACD team members provide support for integration & test  Total I&T effort involves all aspects of the ACD – detectors, mechanical, electrical, assembly, performance testing, and environmental testing Support ACD/LAT integration and test at SLAC Support LAT Environmental Test at NRL  ACD integration will be in a class 100,000 clean tent at GSFC Building 7/10. Integration area will have sufficient space for electrical works, blanket works, and storage for flight hardware  GSFC Work Order Authorization (WOA) System will be used  GSFC Non-Conformance Reporting (NCR) System will be used  ACD is sensitive to Helium. Helium monitoring is required when the ACD is moved to a new location and then periodic monitoring thereafter

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 4 Shell, Tile Detector Assemblies (TDA) & Tile Shell Assembly (TSA) Mounting the TDAs and ribbons on the shell forms the TSA Composite Shell ACD I&T Overview - Assembly Tile Detector Assembly (89)

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 5 ACD I&T Overview - Assembly Base Frame Assembly Electronics Chassis (12) – Phototubes, FREE Cards, HVBS LAT Grid – Mechanical/Thermal Interface to LAT Electronics Chassis, Base Frame, and Base Electronics Assembly (BEA) Mounting the Electronics Chassis into the Base Frame Assembly forms the BEA

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 6 ACD I&T Overview - Assembly Tile Shell Assembly (TSA), Base Electronics Assembly (BEA), and ACD Mounting the TSA onto the BEA forms the complete ACD

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 7 ACD I&T Assembly/Integration Flow Major activities in I&T flow have been defined (LAT-TD D1) Install & Test 17 Rows of TDAs (5 TDAs per row) TSA Subassembly Integration Complete Comprehensive Performance Test (CPT) Pre Environmental Review Install & Test a 2 nd, 3 rd, 4 th Set of 3 Electronic Chassis (FREE, HVBS, PMT) Install Clear Fibers & Ribbon Cables On Tile Shell Receive Flight Qualified Tile Shell Receive Flight Qualified Base Frame Install & Test a Set of 3 Electronic Chassis (FREE, HVBS, PMT) on BFA BEA Subassembly Integration Complete Install TSA onto BEA, Mate & Test Fiber Cables to PMTs (186 times) Full Functional Test Mate, Install & Test last 4 long Tiles (lower TDAs) 7 days 60 days 7 days 21 days 10 days 2 days 3 days 2 days30 days1 day Install Micrometeoroid Shield & Thermal Blanket

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 8 ACD-LAT Electrical Interface Interface Control Document, LAT-SS

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 9 ACD-LAT Electrical Integration Electrical integration consists of the following for each connector: –With all instrument power removed, install connector savers on the component (also on the harness if space allows). –Install Break-Out Box (BOB), with all jumpers removed, between the component and the harness; –Perform an isolation/continuity check. –Supply power to the component and perform an open-circuit voltage check. Remove power from the component. –If connector supplies power, perform Initial Power Turn-On (IPTO). Remove power from the component. –Install jumpers, reapply power, and verify connector performance; –Perform functional test (with BOBs installed) –Remove all BOBs and re-mate the harness to all the connectors. –Re-run the functional test. Procedures are based on standard Goddard electrical integration approach.

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 10 Performance Verification Plan  Purpose and Scope  Provide means to verify ACD Performance, Functional & Environmental requirements  Flow requirements for LAT Instrument Performance, Functional & Environmental test  Track level of verification: Components, Subassemblies, & Subsystem  Identify method of verification: Test, Analysis, Inspection, & Similarity  Performance Verification Matrix  Easily track and verify each ACD requirement  Details each requirement’s verification level, method and origin ACD-PLAN –D5, LAT ACD Subsystem - ACD Verification Plan

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 11 ACD Test Requirements Electrical Mechanical Environmental Electrical Interface Static LoadThermal Vacuum - Isolation /Continuity Checks - Open Circuit Voltage Sine Sweep VibrationThermal Balance Checks (Modal Survey) -Initial Power Turn-On Sine Vibration, 3 AxisEMI/EMC AlivenessRandom Vibration Limited FunctionalAcoustic Full Functional Mass Properties Comprehensive Performance ACD-PLAN –D5, LAT ACD Subsystem - ACD Verification Plan

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 12 ACD Environmental Testing Environmental Testing already performed on Qualification Subassemblies, consisting of shell section, flexures, tiles, waveshifting fibers, optical connector, clear fibers, and photomultiplier tubes with resistor network in housing : –ACD-PLAN , LAT-ACD Tile Detector Test Vibration Test Plan –ACD-PROC , TDA-PMT-Resistor Network End-to-End Thermal-Vacuum Test Procedure Functional testing for these environmental tests used these procedures: –Tile Detector Assembly (TDA) Test B Procedure –Tile Detector Assembly (TDA) Test A Procedure Experience gained with these tests is being used to write the full ACD Environmental Test procedures All Environmental Testing will be carried out in Goddard testing facilities used for many previous instruments and spacecraft.

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 13 Environmental Test Flow EMI/EMC Vibration Test Full Functional Test Limited Functional Test Thermal Vacuum Mass Properties Acoustic Pre Environmental Review Limited Functional Test Pack & Ship Full Functional Test Setup test outlines are consistent with 568-PG Rev A 2 days 5 days 1 day 5 days Modal Survey (sine sweep) 1 day Full Functional Test 2 days Thermal Balance 5 days 14 days 3 days 1 day 14 days Modal Survey (sine sweep) 1 day

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 14  Aliveness Test (AT) Functional test that turns on the ACD in a nominal state and verifies basic operation of all channels  Functional Tests  Limited Functional Test (LFT) - Test all major functions of the ACD system  Full Functional Test (FFT) - Test all functions of the ACD system except a complete measurement of all the ACD tile efficiencies  Comprehensive Performance Test (CPT) Test all functions of the ACD system and includes a complete measurement of all the ACD tile efficiencies. Requires rotation of ACD into three different orientations. Performance Tests LAT-TD D1, ACD Functional Test Plans (Comprehensive Performance Test)

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 15 ACD Level I&T Communication The I&T Lead is the point of contact for all daily activities, and works in conjunction with the entire ACD Team ACD System Engineer ACD Lead Engineers ACD Scientist ACD I&T Lead Daily operation inputs will be flowed from System, Leads, and Scientist to I&T Lead for scheduling & coordination of activities. Minor anomalies are to be resolved at this Level. LAT System Leads LAT Instrument Scientists LAT Project Manager Higher level anomalies that are affecting Science, Lat instrument or other subsystems will be flowed up to the LAT Project System Leads & LAT Instrument Scientists for resolution, then back through ACD Subsystem Manager to ACD I&T Lead for implementation ACD Subsystem Manager Quality Assurance Office

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 16 Key I&T Schedule  Flight Hardware starts to arrive for I&TSeptember 03  TSA assembly completeDecember 03  BEA assembly completeMarch 04  ACD Integration CompleteMarch 04  Environmental Test StartsMay 04  Ship ACD to SLACAug 04

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 17 Issues/Concerns Need commitment from Goddard for Test Conductor support Readiness of LAT Test Stand delivery to support ACD I&T (ACD/LAT Electronics – Testing Interface Document, LAT-TD , Draft)

GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 18 Summary ACD ElementProgress to DateStatus MGSEModifying existing hardwareWill be ready when needed EGSE test scriptsScripts outlined, GARC test script written. Partially dependent on new interface hardware from LAT Electronics, due in April. Assembly planDetailed outlineWill be ready when needed. Functional testing plansFunctional tests for phototubes and tile detectors ready. Comprehensive Performance Test in review Building larger tests from individual component tests already completed. Verification plansVerification plan in signoff; Environmental tests in draft Building larger tests from subassembly tests.