Page 1© Crown copyright 2005 Ensemble Forecasting: THORPEX and the future of NWP Richard Swinbank, with thanks to Ken Mylne and David Richardson UTLS International.

Slides:



Advertisements
Similar presentations
© GEO Secretariat THORPEX-TIGGE Overall Concept What? –TIGGE: THORPEX will develop, demonstrate and evaluate a multi- model, multi-analysis and multi national.
Advertisements

Recent & planned developments to the Met Office Global and Regional Ensemble Prediction System (MOGREPS) Richard Swinbank, Warren Tennant, Sarah Beare,
Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
Page 1© Crown copyright 2005 Use of EPS at the Met Office Ken Mylne and Tim Legg.
Page 1 © Crown copyright 2005 ECMWF User Meeting, June 2006 Developments in the Use of Short and Medium-Range Ensembles at the Met Office Ken Mylne.
ECMWF long range forecast systems
The THORPEX Interactive Grand Global Ensemble (TIGGE) Richard Swinbank, Zoltan Toth and Philippe Bougeault, with thanks to the GIFS-TIGGE working group.
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
Slides for GIFS-TIGGE WG meeting Richard Swinbank.
Slide 1 TECO on the WIS, Seoul, 6-8 November 2006 Slide 1 TECO on the WIS: Stakeholder Session THORPEX and TIGGE Walter Zwieflhofer ECMWF.
Page 1© Crown copyright 2006ESWWIII, Royal Library of Belgium, Brussels, Nov 15 th 2006 Forecasting uncertainty: the ensemble solution Mike Keil, Ken Mylne,
Predictability and Chaos EPS and Probability Forecasting.
Use of Probabilistic Forecasts. Ensembles These are a number of forecasts all run from similar, but slightly different initial conditions The same forecast.
EG1204: Earth Systems: an introduction Meteorology and Climate Lecture 7 Climate: prediction & change.
Introduction to Numerical Weather Prediction and Ensemble Weather Forecasting Tom Hamill NOAA-CIRES Climate Diagnostics Center Boulder, Colorado USA.
Ensemble Post-Processing and it’s Potential Benefits for the Operational Forecaster Michael Erickson and Brian A. Colle School of Marine and Atmospheric.
The Long Journey of Medium-Range Climate Prediction Ed O’Lenic, NOAA-NWS-Climate Prediction Center.
On-going WMO Demonstration Projects related to EXPO2010 Multi Hazard Early Warning System Multi Hazard Early Warning System Leading by SMB/CMALeading by.
GEO Work Plan Symposium 2014 WE-01 Jim Caughey THORPEX IPO.
Performance of the MOGREPS Regional Ensemble
1 LAM EPS Workshop, Madrid, 3-4 October 2002 Ken Mylne and Kelvyn Robertson Met Office Poor Man's EPS experiments and LAMEPS plans at the Met Office.
The Climate Prediction Project Global Climate Information for Regional Adaptation and Decision-Making in the 21 st Century.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
ESA DA Projects Progress Meeting 2University of Reading Advanced Data Assimilation Methods WP2.1 Perform (ensemble) experiments to quantify model errors.
Climate Forecasting Unit Prediction of climate extreme events at seasonal and decadal time scale Aida Pintó Biescas.
DEMETER Taiwan, October 2003 Development of a European Multi-Model Ensemble System for Seasonal to Interannual Prediction   DEMETER Noel Keenlyside,
Short-Range Ensemble Prediction System at INM José A. García-Moya & Carlos Santos SMNT – INM COSMO Meeting Zurich, September 2005.
1 Buizza et al: TIGGE (SRNWP WS, Bologna, 7-8 April 2005) TIGGE (The THORPEX Interactive Grand Global Ensemble) Roberto Buizza 1, Philippe Bougeault 1,
How can LAMEPS * help you to make a better forecast for extreme weather Henrik Feddersen, DMI * LAMEPS =Limited-Area Model Ensemble Prediction.
STEPS: An empirical treatment of forecast uncertainty Alan Seed BMRC Weather Forecasting Group.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
WORKSHOP ON SHORT-RANGE ENSEMBLE PREDICTION USING LIMITED-AREA MODELS Instituto National de Meteorologia, Madrid, 3-4 October 2002 Limited-Area Ensemble.
Celeste Saulo and Juan Ruiz CIMA (CONICET/UBA) – DCAO (FCEN –UBA)
Model dependence and an idea for post- processing multi-model ensembles Craig H. Bishop Naval Research Laboratory, Monterey, CA, USA Gab Abramowitz Climate.
Page 1© Crown copyright 2006 Matt Huddleston With thanks to: Frederic Vitart (ECMWF), Ruth McDonald & Met Office Seasonal forecasting team 14 th March.
© Crown copyright Met Office Probabilistic turbulence forecasts from ensemble models and verification Philip Gill and Piers Buchanan NCAR Aviation Turbulence.
© Crown copyright Met Office Met Office activities related to needs of humanitarian agencies Anca Brookshaw.
Linkage between the research community and operational center - case examples - First meeting of the WWRP PDEF working group Karlsruhe, Germany May,
Short-Range Ensemble Prediction System at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
Plans for Short-Range Ensemble Forecast at INM José A. García-Moya SMNT – INM Workshop on Short Range Ensemble Forecast Madrid, October,
. Outline  Evaluation of different model-error schemes in the WRF mesoscale ensemble: stochastic, multi-physics and combinations thereof  Where is.
EurEPS The Realization of an Operational LAM-EPS in Europe A SRNWP Project under EUMETNET Proposed to the EUMETNET Council at its 30 th meeting by Norwegian.
Lennart Bengtsson ESSC, Uni. Reading THORPEX Conference December 2004 Predictability and predictive skill of weather systems and atmospheric flow patterns.
GEO - Weather Ocean Water Proposed Weather SBA and cross-linking work packages.
High Impact Weather Emerging challenge identified at CASXVI Mariane DIOP KANE Mariane DIOP KANE CASMG9, Geneva, April 2014.
Page 1© Crown copyright 2004 SRNWP Lead Centre Report on Data Assimilation 2005 for EWGLAM/SRNWP Annual Meeting October 2005, Ljubljana, Slovenia.
GIFS-FDP Introduction to Framework Plan and links with SWFDP Richard Swinbank & Zoltan Toth.
Slide 1 GO-ESSP Paris. June 2007 Slide 1 (TIGGE and) the EU Funded BRIDGE project Baudouin Raoult Head of Data and Services Section ECMWF.
World Weather Research Programme What / How does the Programme help the Society? (Item 3.3) 24 May 2011.
Exploring Multi-Model Ensemble Performance in Extratropical Cyclones over Eastern North America and the Western Atlantic Ocean Nathan Korfe and Brian A.
Page 1© Crown copyright 2005 EuroRISK PREVIEW Windstorms Workpackage Ken Mylne, Met Office.
1 Symposium on the 50 th Anniversary of Operational Numerical Weather Prediction Dr. Jack Hayes Director, Office of Science and Technology NOAA National.
Page 1 Andrew Lorenc WOAP 2006 © Crown copyright 2006 Andrew Lorenc Head of Data Assimilation & Ensembles Numerical Weather Prediction Met Office, UK Data.
Forecasting systems WMO Atmospheric Research and Environment Programme David Burridge.
THORPEX THORPEX (THeObserving system Research and Predictability Experiment) was established in 2003 by the Fourteenth World Meteorological Congress. THORPEX.
© Crown copyright Met Office Predictability and systematic error growth in Met Office MJO predictions Ann Shelly, Nick Savage & Sean Milton, UK Met Office.
WWRP 1 THORPEX-WCRP Collaborations and other climate relevant activities of the WWRP WCRP/JSC31 WMO/WWRP/THORPEX
Figures from “The ECMWF Ensemble Prediction System”
Met Office Ensemble System Current Status and Plans
Meteorological applications and numerical models becoming increasingly accurate Actual observing systems provide high resolution data in space and time.
Causes of improvements to NWP (1979 – 2009)
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Science Objectives contained in three categories
Ensemble tropical cyclone and windstorm forecast applications
AGREPS – ACCESS Global and Regional Ensemble Prediction System
Linking operational activities and research
SWFDP Key Issues for GIFS-TIGGE
High Impact Weather Emerging challenge identified at CASXVI
MOGREPS developments and TIGGE
AGREPS – ACCESS Global and Regional EPS
Presentation transcript:

Page 1© Crown copyright 2005 Ensemble Forecasting: THORPEX and the future of NWP Richard Swinbank, with thanks to Ken Mylne and David Richardson UTLS International School, Cargese, October 2005

Page 2© Crown copyright 2005 Ensembles - Outline  Why Ensemble forecasts?  Ensemble forecasting at the Met Office  THORPEX – improving the prediction of high- impact weather  Multi-model ensembles - TIGGE and NAEFS  The future of forecasting

Ensemble Forecasts

Page 4© Crown copyright 2005 Forecast failures  Today’s NWP systems are one of the great scientific achievements of the 20 th Century, but…  We've all heard of high-profile forecast failures:  Oct '87 – still difficult with today’s systems  Dec '99 French storms  Less severe errors are much more common, especially in medium-range forecasts  So what causes errors in forecasts?  Analysis Errors  Model Errors and Approximations  Unresolved Processes

Page 5© Crown copyright 2005 Ensembles Forecasts  Small errors in initial conditions will always amplify and, together with model errors and approximations, limit the useful forecast range.  By running an ensemble of many model forecasts with small differences in initial conditions (and model formulation) we can:  take account of uncertainty  sample the distribution of forecast states  estimate probabilities

Page 6© Crown copyright 2005 Ensemble forecasting time Forecast uncertainty Climatology Initial Condition Uncertainty X Deterministic Forecast Analysis

Page 7© Crown copyright 2005 Lorenz Model  Variations in predictability can be illustrated using the Lorenz (1963) model: Simple non-linear system. Possible atmospheric analogue: Zonal Flow Blocked Flow

Page 8© Crown copyright 2005 Ensemble Forecasting in the Lorenz Model 1. Predictable - deterministic OK 2. Predictable at first - probability OK 3. Unpredictable climatology OK

Page 9© Crown copyright 2005 Desirable properties of ensembles  By sampling the initial (and forecast model) uncertainties an ensemble forecast system aims to forecast the PDF (probability density function).  To achieve this we need:  All members equally probable  RMS spread of members is similar to RMS error of control forecast  If these criteria are met, the ensemble can be used to estimate probabilities:  If 20% of members predict X, then the probability of X is estimated to be 20%

Page 10© Crown copyright 2005 Rank histograms  For each ensemble forecast rank members by forecast parameter, e.g. temperature at station locations  Identify rank of each verifying observation  Plot histogram of observation ranks  Ideal is flat  Typically get excessive outliers

Two simple ways of showing all ensemble members together Spaghetti Plot Postage stamp plot Visualising Ensemble Forecasts (1)

Visualising Ensemble Forecasts (2)  An EPS meteogram portrays probabilistic information at a particular location  (In this case an ECMWF forecast for Cargèse – how did it work out?)

Ensemble forecasting at the Met Office

Page 14© Crown copyright 2005 Use of ECMWF EPS at Met Office ECMWF ensemble forecasts are used to assess the most probable outcome before creating the medium-range forecast charts

Page 15© Crown copyright 2005 Probability Forecasts from Ensembles  Probability forecast products available to end-users  assess and manage risk  Post-processing of site-specific forecasts  Applied routinely in offshore-oil operations

Page 16© Crown copyright 2005 First Guess Early Warnings Project National Severe Weather Warning Service: Met Office issues Early Warnings up to 5 days ahead - when probability  60% of disruption due to:  Severe Gales  Heavy rain  Heavy Snow  FGEW System provides forecasters with alerts and guidance from EPS  Probs for regions of UK Prob in UK=67%

Page 17© Crown copyright 2005 Short-range Ensembles  ECMWF EPS has transformed the way we do Medium- Range Forecasting  Uncertainty also in short-range:  Rapid cyclogenesis often poorly forecast deterministically (e.g. Dec 1999)  Many customers most interested in short-range  Assess ability to estimate uncertainty in local weather  QPF  Cloud Ceiling, Fog  Winds etc

Page 18© Crown copyright 2005  Ensemble for short-range forecasting  Regional ensemble over N. Atlantic and Europe (NAE)  Nested within global ensemble for LBCs  ETKF perturbations  Stochastic physics  T+72 global, T+36 regional Met Office Global and Regional EPS, MOGREPS NAE

Page 19© Crown copyright 2005 ETKF Generation of Perturbations Observations Analysis (Var) ETKF Xf1Xf2Xf3…Xf1Xf2Xf3… T+12 ETKF similar to Error Breeding but with matrix transformation of all perturbations to provide next set Perturbations scaled according to analysis uncertainty using observation errors

Page 20© Crown copyright 2005 ETKF in global UM  ETKF set up with global UM  Processing all observations used in data assimilation  12-hour cycle (f/c twice per day)  Running in conjunction with stochastic physics to propagate effect  Encouraging growth rate in case studies (ECMWF use singular vectors of linear model to identify rapidly growing modes)

Page 21© Crown copyright 2005 Stochastic Physics Schemes  Three components to current stochastic physics:  Installed in current version:  Stochastic Convective Vorticity (SCV)  Random Parameters (RP)  Under test:  Stochastic Kinetic Energy Backscatter (SKEB)

Page 22© Crown copyright 2005  Current scheme (SCV+RP) has  Substantial impact on surface variables in the short-range (72-h):  PMSL (up to 5 hPa)  T2M (up to 9ºC)  PREC (up to 40% of control values)  Neutral impact on model climate Stochastic Physics Summary New SKEB scheme has: Larger impact Realistic growth rate Increase in spread for an IC- only ensemble 500 hPa geopotential height SKEB RP+SCV

Page 23© Crown copyright 2005 THORPEX

Accelerating improvements in the accuracy of one-day to two weeks high-impact weather forecasts for the benefit of society, economy and environment A photographic collage depicting the societal, economic and ecological impacts of severe weather associated with four Rossby wave-trains that encircled the globe during November …

Page 25© Crown copyright 2005 What is THORPEX?  THORPEX: a World Weather Research Programme Where THORPEX means “THe Observing System Research and Predictability EXperiment”  THORPEX was established in May 2003 by the Fourteenth World Meteorological Congress as a ten- year international global atmospheric research and development programme under the auspices of the WMO Commission for Atmospheric Sciences (CAS).  THORPEX is a part of the WMO World Weather Research Programme (WWRP)

Page 26© Crown copyright 2005 THORPEX Objectives  To reduce and mitigate natural disasters;  To fully realise the societal and economic benefits of improved weather forecasts, especially in developing and least developed countries. This is achievable by: 1.Extending the range of skilful weather forecasts to time scales of value in decision-making (up to 14 days) using probabilistic ensemble forecast techniques; 2.Developing accurate and timely weather warnings in a form that can be readily used in decision-making support tools; 3.Assessing the impact of weather forecasts and associated outcomes on the development of mitigation strategies to minimise the impact of natural hazards.

Page 27© Crown copyright 2005 High-impact weather events  The objective is to improve the forecasting of high-impact weather at short- and medium- range, for instance:  Local scale (UK)  Boscastle – intense rain and flooding August 2004  Regional scale (Europe)  Heatwave in France, August 2003  Global phenomena, such as tropical cyclones  Hurricane Katrina, New Orleans, August 2005

Multi-model Ensembles

Page 29© Crown copyright 2005 Multi-model ensembles  Multi-model ensembles combine ensemble forecasts produced from different models (usually different NWP centres).  This gives access to a bigger ensemble size at relatively little extra cost.  In addition, results from DEMETER (seasonal forecasting project) indicate that there is also a benefit from using different forecast models.

Page 30© Crown copyright 2005 Benefits of multi-model ensembles By better representing the uncertainties within the different modelling systems, a multi-model ensemble gives a much better representation of the probability (risk) of given events occurring Figures show how well the forecast probability of an event match the actual probability that the situation will occur. For a perfect forecast system the line will lie on the diagonal Combined multi-model ECMWFMeteo-France Met Office Reliability: 2m temperature above normal, DEMETER seasonal forecasts

Page 31© Crown copyright 2005 Why should multi-model ensembles be better?  Can a poor model add skill?  If all aspects of a model are poor, perhaps not, unless its errors cancel with another.  How can the multi-model be better than the average single model performance?  Error cancellation and non-linearity of probabilistic diagnostics tend to make multi-model results better in practice.  Why not use the best single model instead?  Models tend to have different strengths and weaknesses, so there is no single best model. (Hagedorn et al, 2005)

Page 32© Crown copyright 2005 Met Office medium-range ensemble  Develop from short range ensemble system (MOGREPS)  Multi-model ensemble, in collaboration with TIGGE partners, including ECMWF and NAEFS.  To be run using UK allocation of resources on ECMWF supercomputer

Page 33© Crown copyright 2005 Medium Range Ensemble Forecast Process Initial Analysis Perturbations Initial Analysis Perturbations Create Initial Conditions Run Ensemble forecast TIGGE archive Multi-model Ensemble Perturbed Initial conditions Single-model ensemble Met Office ECMWF Combine Ensemble forecasts Ensemble forecasts from other models Product generation Products

Page 34© Crown copyright 2005 TIGGE THORPEX Interactive Grand Global Ensemble  Framework for international collaboration in development and testing of ensemble prediction systems  Resource for many THORPEX research projects  Prediction component of THORPEX Forecast Demonstration Projects (FDPs)  A prototype future Global Interactive Forecast System  Global and regional components

Page 35© Crown copyright 2005 TIGGE  Initially develop database of available ensembles, collected in near-real time  Co-ordinate research using this multi-model ensemble data  Compare initial condition methods  Compare multi-model and perturbed physics  Develop ways to combine ensembles  Boundary conditions for regional ensembles  Regime-dependence of ensemble configuration (size, resolution, composition)  Observation targeting (case selection, ETKF sensitive area prediction)  Societal and economic impacts assessment  Close interaction with other THORPEX sub-programmes

Page 36© Crown copyright 2005 TIGGE infrastructure Phase 1  Data collected in near-real time (via internet ftp) at central TIGGE data archives  Can be implemented now at little cost  Can handle current data volumes within available network and storage capabilities TIGGE Centre A EPS 1EPS 2EPS n NHMSacademicEnd user TIGGE Centre B Predictability science Real-world applications

Page 37© Crown copyright 2005 North American Ensemble Forecast System  USA, Canada, and Mexico have set up NAEFS  This is an operational multi- model ensemble forecast system  There are strong links with the TIGGE research programme  Met Office will join on an experimental basis while we evaluate our medium-range ensemble system and the benefit of multi-model ensembles

Forecasting – the future?

Page 39© Crown copyright 2005 Traditional forecast system observationsAssimilationForecastusers

Page 40© Crown copyright 2005 A new interactive NWP process The traditional NWP process is characterized by separate steps with one-way flow of information. In a future NWP process there will be strong feedback among the components, with two-way interaction. Errors and uncertainty will be accounted for. Observing System Data Assimilation Forecast System Applications Data Analysis Single-value forecast Observation targeting Forecast error covariance Targeted forecast requirements Probabilistic forecast Initial state + errors Data + error estimate

Page 41© Crown copyright 2005 A possible Global Interactive Forecast System Forecaster requests high resolution regional ensemble Initial risk from medium-range global ensemble Initiate and maintain links with civil protection agencies Forecaster requests observations in sensitive area Forecaster runs ‘sensitive area’ prediction

Page 42© Crown copyright 2005 Observation targeting Prediction of sensitive areas where extra observations will provide most benefit to forecasts Adaptive control of observing network Targeted use of satellite data (adaptive, intelligent thinning)

Page 43© Crown copyright 2005 Summary  Ensemble forecasting enables us to get a probabilistic perspective on weather forecasts.  This is particularly important to highlight the possibility of high-impact weather events.  A key part of the THORPEX programme is the TIGGE project, intended to lead to the development of a global interactive forecast system.  The Met Office has developed an ensemble forecasting system including ETKF perturbations and stochastic physics that will contribute to the international TIGGE project.

Page 44© Crown copyright 2005 The End