NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.

Slides:



Advertisements
Similar presentations
Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
Advertisements

NGAO Construction Project Cost Estimation: Initial Thoughts Richard Dekany NGAO Team Meeting #12 December 13, 2007.
W. M. Keck Observatory Keck Next Generation AO Next Generation Adaptive Optics Irvine Meeting September 14, 2006 P. Wizinowich for NGAO Executive Committee.
Project Kick-off 14-Jan-09.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
Build to Cost Meeting: Goals, Agenda & New Directions Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.
Project Management Module 3. Keep focused on the timeline Week Prepare for Kick-off Meeting Assign teams Team forming Review and execute.
1 Keck NGAO Proposal: Management Overview Presenter: P. Wizinowich SSC Meeting June 21, 2006.
Don Gavel: Keck NGAO meeting April 25, Some Comments on NGAO System Design and Specification Donald Gavel NGAO Team Meeting 6 April 25, 2007.
NGAO System Design: AO System (WBS 3.2) & Laser Facility (WBS 3.3) Design Inputs & Outputs Peter Wizinowich NGAO Team Meeting #9 August 24, 2007.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting April 3, 2007.
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
Build to Cost Directions & Guidelines Peter Wizinowich SSC Meeting November 3, 2008.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Laser Architecture Meeting Oct 1 st, 2007.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Science Operations Plan NGAO - Meeting 10 D. Le Mignant W. M. Keck Observatory 09/17/2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team (with input from Sean Adkins, Matthew Britton, Ralf.
Don Gavel: Keck NGAO meeting April 25, Keck NGAO Project Replan: AO and Laser Systems Donald Gavel NGAO Team Meeting 6 April 25, 2007.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO: Cost Comparison with First Light TMT AO Peter Wizinowich, Richard Dekany, Don Gavel with input & review by Brent Ellerbroek SSC Meeting November.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
System Architecture WBS 3.1 Mid-Year Replan Richard Dekany NGAO Team Meeting #6 April 25-26, 2007 UCSC.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Functional Requirements Status and Plans Christopher Neyman & Erik Johansson W. M. Keck Observatory Viswa Velur California Institute of Technology Keck.
NGAO High-Contrast Performance Budget (WBS aka Companion Sensitivity) Initial WFE budget and status report NGAO Team meeting #4, WMKO Kamuela.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting January 24, 2007.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting November 6, 2007.
Project Management Process Overview
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
The Project Plan IT Project Management COSC
® © 2009 Open Geospatial Consortium, Inc. Starting an Interoperability Experiment David Arctur, OGC Director, Interoperability Programs December 8, 2009.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Project Life Cycle.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
1 NG9-1-1 Initiative Action Team Conference Call #5 October 3,
P r o j e c t : from INITIATING to CLOSING ( 1 ).
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
NGAO System Design Project Plans and Schedule
SKADS Controller’s Meeting Timeline Annual Financial Report
Welcome W 4.2 Introduction to Engineering Design II (IE 202)
Adaptive Product Development Process Framework
Project Overview.
Presentation transcript:

NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006

2 Welcome - Participants Telecon Attendees: –NGAO Executive Committee: Rich Dekany, Don Gavel, Claire Max, Peter Wizinowich –Sean Adkins, Brian Bauman, Antonin Bouchez, Ralf Flicker, Erik Johansson, Mike Liu, Franck Marchis, David Le Mignant, Anna Moore(?), Chris Neyman, Viswa Velur

3 Goals of Today’s Meeting Review Progress (management, science, performance budget & instrument updates) Review trade study reports

4 Meeting Agenda (PST times) :50 Welcome (& connections) 10:00 Management Report (Wizinowich) 10:25 Science Team Report (Max) 10:45 Systems Engineering Report (Dekany) 11:10 Trade Study Report: MOAO vs MCAO (Gavel) 11:40 TS Report: Rayleigh Rejection Strategies (Velur) 12:00 TS Report: Stand-alone vs DM on T/T (Bauman) 12:20 Break 12:40 Instrument Trade Studies Update (Adkins) 13:00 Upcoming tasks & milestones (Wizinowich) 13:20 Discussion: Issues pertaining to ongoing & upcoming work 14:30 Adjourn

NGAO System Design Phase Management Report NGAO Meeting #3 Peter Wizinowich December 13, 2006

6 Presentation Sequence System Design (SD) Phase SEMP Approval Status SD Phase Tracking Meeting Tracking –Meeting action items status –EC meeting minutes Work scope planning sheets status Posted documents

7 System Design Phase Approval Status SEMP submitted to the Observatory Directors on 9/29/06 for approval Official response not yet received (has been requested) –Major issue is how many $ can be made available in FY07 Direction from WMKO management to proceed while decision is being made –Statements of work complete for COO & UCO & purchase requisitions about to be issued with limited initial funding

8 System Design Phase Tracking Tracked (Excel) version of the plan posted at ePlanning/NGAO_SD_schedule_v20_tracked.xls ePlanning/NGAO_SD_schedule_v20_tracked.xls Excel version highlights what’s complete, what’s late, what’s due within next month & status of work scope planning sheets.

9 Meeting Tracking The tracked version of the action items from meeting 2 are posted at The minutes & action items from the EC meetings are posted at

10 Work Scope Planning & Approval Simplified template posted at –To be prepared by WBS element lead & approved prior to performing significant work on a WBS element –Approvals & document control by WBSx.x lead & Wizinowich –We will endeavor to provide approvals within 5 working days of submittal List of all WBS elements requiring a scope planning sheet can be found at: –Table also provides a location for posting the planning sheets & deliverables –Draft planning sheets posted for many items (includes WBS number, name, dictionary definition & effort estimate from SEMP) Planning sheet status –Posted for WBS 2.2, & –Approved for WBS , & REMINDER to fill out these planning sheets!

11 Posted Documents KAON 415 TMT site monitoring data (restricted access) KAON 416 Atmospheric sodium density from Keck LGS photometry KAON 417 Sodium abundance data from MAUI Mesosphere KAON 427 Variable vs fixed LGS asterism KAON 429 LGS asterism geometry & size MOAO vs MCAO trade study report

NGAO System Design Phase Upcoming Tasks & Milestones NGAO Meeting #3 Peter Wizinowich December 13, 2006

13 Upcoming Meetings & Milestones Meeting #4 is Jan. 22 at Keck HQ – -Will need % complete for WBS elements prior to meeting (also to be used for SSC report) SSC meeting Jan. 24 at Keck HQ –1 st project report to SSC & Observatory management –Will need a good estimate of project completion versus costs to date Milestones: –SEMP approval was due 10/9 (verbal ok only) –SD phase contracts in place was due 10/27 –Science requirements summary v1.0 was due 10/27 –System requirements document v1.0 was due 12/8 We need to show all of these milestones as complete at SSC meeting!

14 NGAO SD Phase Milestones MILESTONEDATEDESCRIPTION SD SEMP Approved10/9/06 Approval of this plan by the Directors. Initial SEMP version released to Directors for comment on 9/12 & final version on 9/29/06. SD phase contracts in place10/27/06 Contracts issued to Caltech & UCSC for the system design phase. Science Requirements Summary v1.0 Release10/27/06 Initial Release of the Science Requirements as input to trade studies and performance budgeting System Requirements Document (SRD) v1.0 Release 12/8/06 Initial release of System Requirements with emphasis on the science requirements Performance Budgets Summary v1.0 Release2/27/07 First round of all performance budgets complete & documented SRD v2.0 Release3/22/07 Second release of System Requirements Doc Trade Studies Complete5/25/07 All trade studies complete & documented (as a series of Keck Adaptive Optics Notes) SRD v3.0 Release7/12/07 Third release of System Requirements System Design Manual (SDM) v1.0 Release8/31/07 First release of System Design Manual Technical Risk Analysis v1.0 Release11/13/07 First round of project risk analysis complete & documented Cost Review Complete11/30/07 Project cost estimates complete, documented & internally reviewed SDM v2.0 Release1/8/07 Second release of System Design Manual System Design Review Package Distributed3/4/08 SDR documents sent to reviewers System Design Review3/31/08 SDR meeting SDR Report & Project Planning Presentation at SSC meeting 4/14/08 Final SD phase report including results of SDR & project plans

15 Team Meeting Calendar