CPAC-May’02; U.Bonne - New Sampling/Sensor Initiative (NeSSI-II) May’02 CPAC Draft of White Paper to U.S. Department of Energy,

Slides:



Advertisements
Similar presentations
Process Gas Chromatography Siemens Process Chromatographs CPAC-NeSSI Report.pptSlide 1; November 8, 2007 Criteria for Design and Specification Discussion.
Advertisements

Complete, Modular, Ready Today 1 History of ISA SP76 NeSSI Current Standards ANSI/ISA (2002) IEC ( )
DOC ID © Chevron 2005 Implementation of NeSSI CPAC – November 8, 2007 John Dempster, Rick Junge, Sandra Krauthamer, Mark Lee, Stacey Miller, Don Nettles.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
Marketing NeSSI™ Globally What’s the Plan?. Issues There are periodic requests for NeSSI™ information from the “press” Should we provide directed mailings.
NeSSI Open Session September 11 th, 2001 Room 311A, Convention Center 1:30 - to about 4:00 PM 1:30 PM. Introduction & review of 3 questions. 1:45 PM. Discussion/Breakout.
Instrumentation Surface Mount Technology for Process Analytic Sampling Systems Steve Doe, Parker Hannifin Corporation.
NeSSI*: Full Speed Ahead “Into the Project Stage” CPAC - Seattle, WA - Nov. 4, 2002 NeSSI End Users Group. “the best way to predict the future is to create.
New Sampling/Sensor Initiative (NeSSI) CPAC: November 5, 2001 NeSSI (New Sampling/Sensor Initiative) Interface to the Process Jim Tatera, Rob Dubois, Peter.
© 2006 Swagelok Company. Swagelok confidential. For internal use only. IS CAN Bus – CiA WD 103 Update Low Cost, Intrinsically Safe Transducer Bus Enabling.
IFPAC-NeSSI Report.ppt; 29 January 2008; Slide 1Siemens Energy & Automation, Inc. Criteria for Design and Specification NeSSI Issues Presentation to IFPAC.
IFPAC 2003: Wed PM-II Session "NeSSI: A Sampling Platform for Micro Physical and Micro Analytical Sensors" Session Chair: Peter van Vuuren ExxonMobil Chemical.
Modular Sampling System Initiative CPAC: Nov 6, 2000 Modular Sampling System Initiative Modular Sampling System Initiative Background and Status 2000 Fall.
NeSSI AND ANALYZERS NeSSI AND ANALYZERS ISSUES AND DISCUSSION REGARDING THE SAM CONCEPT FROM THE ANALYZER SUPPLIERS PERSPECTIVE.
Brad Oviatt Parker Hannifin NeSSI™ Workshop May 5, 2005 Parker IntraFlow™
I²C Bus Development An Implementation of the Generation 2 Bus Siemens Activities Silke Ebbing, March 2007.
© 2006 Swagelok Company. Swagelok confidential. For internal use only. NeSSI Life Cycle Cost Model CPAC FALL 2006 SPONSORS MEETING NeSSI WORKSHOP Thursday,
NeSSI - Next Steps Turning Vision into Reality. May 9, 2001 Agenda CPAC Sampling Focus Group w Agenda Review and Comments about Monday Session [5 min]
Charting the path to NeSSI* Gen II a comparison of POCA & POCA-2 projects CPAC - Seattle, WA - Nov. 4, 2002 NeSSI End Users Group. “the best way to predict.
CPAC-May’02; U.Bonne - New Sampling/Sensor Initiative (NeSSI-II) May’02 CPAC Draft of White Paper to U.S. Department of Energy,
Small Smart Integrated Sensor & Sampling Systems CPAC: Nov 1, 1999 Small Smart Integrated Sensor & Sampling Systems Tutorial Session Sponsored by the Oil.
ISAExpo October 2003: Houston, TX AD Session: ISA03-P247 - Tutorial: AD Session: ISA03-P247 - Tutorial: NeSSI ™ - Evolution of a New Process Analytics.
ISAExpo October 2003: Houston, TX NeSSI - Examples of Some Recent Developments “the best way to predict the future is to create it”
15-Oct SP76.51 Meeting Symbol Library Update Tracy Dye, ABB Steve Doe, Parker Hannifin CPAC November 9, 2006.
New Sampling/Sensor Initiative (NeSSI) & Connectivity (ConnI) Update New Sampling/Sensor Initiative (NeSSI) & Connectivity (ConnI) Update CPAC: May 6,
Smart, Modular Sample Systems What’s in it for us Dan Podkulski.
New Sampling/Sensor Initiative (NeSSI) CPAC: November 5, 2001 NeSSI (New Sampling/Sensor Initiative) Status and Update Jim Tatera, Rob Dubois, Peter van.
YOU HAVE HEARD ABOUT MANY ADVANCES IN HARDWARE, SENSORS AND CONTROLS THESE HIGHLIGHT THE NEED FOR IMPROVED SAMPLING TECHNOLOGIES.
NeSSI*: Activities Update CPAC - Seattle, WA - May 5, 2003 NeSSI End-Users Group “the best way to predict the future is to create it” *New Sampling/Sensor.
MINIATURE MODULAR SAMPLE SYSTEMS – FROM CONCEPT TO REALITY David M. Simko, Swagelok Company Pittcon®2002 New Orleans, March 20, 2002.
Business Careers & Practices Week 1 Careers and Jobs in Accounting and Management Work Functions of Accounting and Management Technicians Business Functions.
The Camp Audit “Keep your friends close and your auditor closer”
NeSSI Update An Implementation of the Generation 2 Bus Siemens Activities November 2006.
CPAC – Fall Meeting 2007 Michael Gaura Emerson Process Management.
Work Breakdown Structure
Solid Performance Solutions This presentation was created to give you the ideas and support to present “Rethinking New Product Training Development” in.
Operational Capability: An underlying simplification of a data encoding standard has been developing over the past decade and is being demonstrated in.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
From Research Prototype to Production
1 International/OECD Nanotechnology Activities EPA/DoD Meeting on Nanotechnology March 9, 2007 Jim Willis, EPA/OPPT.
PHASED: a Faster, Smarter & More Affordable Analysis Device - Update U.Bonne, J.Detry, R.Higashi, K.Newstrom-Peitso, H.Pham,
Modular Sampling System Initiative CPAC/ISA: August 23, 2000 Modular Sampling System Initiative ISAEXPO2000 Meeting Center for Process Analytical Chemistry.
What’s Coming…. Today (2/16) Update and review a sample final presentation (20’) Group Presentations- milestones and resource requirements (50’) Work Sessions.
CPAC/NeSSI Workshop May 6, 2004 (Times are PST) Best Western University Tower Hotel, Seattle, Washington, USA AMPM 08:00 Welcome – M. Koch (CPAC Dir.)
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
1 CPAC NeSSI Focus Group May 3, 2004 Focus Group Agenda –Dave Veltkamp – Roll Out of NeSSI Knowledge Network website (30 min) discussion –John Mosher –
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Utilizing NeSSI™ for Analytical Applications Dave Veltkamp, CPAC New Sampling/Sensor Initiative (NeSSI™)
Department of Energy Project Funding MicroAnalytical Sensors Development on NeSSI Platform John Mosher, Bob Nickels, Ulrich Bonne Honeywell International.
FCC Special Technologies WP Task 11 Radiation Hardness Assurance TASK 1 Field conditions and radiation levels at FCC TASK 2 FCC Qualification Protocols.
NeSSI  connectivity: progress on SAM and Smarts Jeff Gunnell ExxonMobil Chemical Limited.
Industry Analytics Initiatives: Status & Plans IFPAC 2002 January 23, 2002 San Diego, CA IFPAC 2002 Industry Analytics Initiatives: Status & Plans Session.
NeSSI-bus History, Evolution and Selection for Process Analytical CPAC, Seattle, WA, USA November 10, 2005 “the best way to predict the future is to create.
NeSSI II - A Platform for Micro-Analytical Devices
Swagelok confidential. For internal use only.
AGENDA: CPAC/NeSSI™ Workshop, 9 November, 2006
Purchasing supplies at CERN
EDR HLRF Work Packages Draft Summary
Copyright Danielle Dubois
Session Chair: Rob Dubois, Dow Chemical Process Analytical R&D
NeSSI* - Generation II “Revolution or Evolution?”
Introduction: the NeSSI generations
IFPAC NeSSI Update Item 1
IFPAC 2002 Roundtable January 23, 2002.
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
Copyright Danielle Dubois
Introduction and Background
Agenda: “Electrifying” NeSSI
ConnI (Connectivity Initiative) Status and Update
Modular Sampling System Initiative Background and Status
Presentation transcript:

CPAC-May’02; U.Bonne - New Sampling/Sensor Initiative (NeSSI-II) May’02 CPAC Draft of White Paper to U.S. Department of Energy, Office of Industrial Technology OBJECTIVES Take updated set of NeSSI -II prototype specs and components from the concept stage, through several development steps to a productization plan stage. APPROACH via Tasks: 1. Agree on NeSSI-II specs 2. Build and lab test of first unit 3. Fabrication of NeSSI units 4. Field test and evaluate 5. Market assessment 6. Manufacturing cost estimate SCHEDULE - June ‘02 Presentation to DoE - June ‘03 DoE Funding starts - June ‘04 Tasks 1-3 done - June ‘05 Tasks 4-6 done Fig.1. Typical Sampling Train as Envisioned for a NeSSI-II Unit* * from “NeSSI-II Prelim.Specs..” by DuBois, vVuuren, Tatera

CPAC-May’02; U.Bonne - NeSSI Project Collaboration on - Spec Preparation c/w Sample System Test Design: CPAC (Rob, Peter, Jim, Ken) - Program Management: See Program Management (PM) -Steering Team - Sensor design and adaptation: Honeywell, Rosemount, ABB and others - Mounting base and fittings, including base & enclosure heater: Swagelok, Parker, CIRCOR, Kinetics,... - Combi Valve: Swagelok, Parker, CIRCOR,... - Design and adaptation of CAN-SDS or -DeviceNet communication system: Honeywell in collaboration with users and approval bodies - Design aspects needed for IS qualification, and other approvals: Honeywell with MTL, R. Stahl, P+F; Crouse Hinds, Turck, and other IS manufacturers - Integration and Assembly and Overall Electrical Approval: Spartech, others… - Manufacturing cost: Honeywell, Swagelok, Parker and others - Marketing study: Honeywell, Parker, Swagelok, ABB and others

CPAC-May’02; U.Bonne - Smart T-Comp. TC Sensor Smart T-Comp Flow Sensor 17 mm Smart T-Comp Flow Sensor

CPAC-May’02; U.Bonne - Definition

CPAC-May’02; U.Bonne - Definition