GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Advertisements

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 7 Systems Engineering1 GLAST Large Area Telescope: LAT System Engineering.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 3 of 12 SE Overview 1 GLAST Large Area Telescope LAT Pre-Shipment Review Systems.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
GLAST LAT ProjectDOE/NASA Stratus Review, March 30 & 31, 2004 Systems Engineering 1 GLAST Large Area Telescope: Pat Hascall SLAC System Engineering Manager.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 2.2 Budgets & Metrics 1 GLAST Large Area Telescope:
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectGSFC Monthly, 24 May 2005 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Introduction and Overview
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 2 Topics Action Item Status Technical Baseline Management Requirements Management and Verification Planning Interface Control Documentation RFA Closure Key Metrics Risk Management

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 3 Monthly Action Item Status

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 4 Drawing Release Status Drawing preparations at SLAC matched needs for November (still need a few status updates to be sure) Drawing release did not keep pace –Tracker team put in 30 drawings in November that are still not released Due in part to vib test results – have broken free drawings unaffected by that test Have instituted a better tracking system to provide better visibility into where drawings are in the release cycle –Mechanical, Cal and Electrical on track –ACD report is incomplete but progress is apparently 46 drawings behind release plan Additional drawings identified –Four Tracker drawings –14 Outline drawings needed by Integration Intermediate link between subsystem models and LAT model –Three harness drawings

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 5 Planned Drawing Release

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 6 Issues

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 7 Issues (Continued)

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 8 Issues (Continued)

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 9 Issues (Continued)

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 10 Requirements & Performance Verification Progress Test Data Requirements –New direction to add appendix to LAT-MD for each subsystem defining End item data packages (12/10 F to F) Test Planning –Post CDR LAT-MD out for signatures Highlights include: –Changes TKR & CAL to Proto Flight Programs –Updated EMI section –New Assy & Test Flow –Added strength Testing

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 11 Updated LAT Performance Verification Plan Additions –Added section on plan for the test plans –Updated and re-formatted reference documents –Added section on Strength Testing Deletions –Removed reference to an ESD compatibility test –Removed Appendix-A, example Test procedures Changes –Updated LAT Assembly and Test Flow –Updated EMI/EMC Section to reflect latest post CDR requirements –Updated document release matrix –Updated section on Test Data Packages –Changed Tracker to a Proto Flight Program –Changed Calorimeter to a Proto Flight Program –Provided details on alignment and Survey –Updated LAT Thermal Vacuum cycle plot (from CDR)

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 12 Test Plan Schedules LAT I&T - Assembly Plan – 12/19/03 LAT Comprehensive Performance Plan- 6/04 LAT Limited Performance Plan - 6/04 LAT Operational Performance Tests - 3/04 LAT Instrumentation Plan - Update 1/16/04 LAT Survey Plan – 1/16/04 LAT Dynamics Test Plan – First Release 12/19/03, Final 3/04 LAT Thermal Test Plan - First Release 1/16/04, Final 3/04 LAT EMI/EMC Test Plan - First Release 3/04

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 13 Interface Management

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 14 LAT-SC Interface – Open Issues

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 15 ICN’s LAT signed this month –ICN-9 Reduce the High Speed Serial Science Data Rate ( ) –ICN-17 LAT Orientation during TVAC Testing ( ) –ICN-25 Add SC RT to 1553 Protocol Document ( ) –ICN-37 Add Digital Grounds to Connector Pin-outs ( ) –ICN-36 LAT-SC Mechanical Interface ( ) Currently under signature review –ICN-39 PRU Over-Voltage Limit Currently in draft or revision –ICN-33 LAT Analog RTD Part Type

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 16 Interface Documentation Status

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 17 Working CDRL Delivery List

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 18 RFA Closure Coordinated plan of attack in place –Horn/Graf/Hascall/Melton –37 CDR RFAs total, submitted 21 answers, have 5 draft answers Preparations for MRRs are driving RFA closure priorities Current status of all RFA’s on SE website

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 19 Key Design Metrics

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 20 LAT Mass Status

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 21 November 03 LAT Power Status (Proposed) Operational Power

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 22 November 03 LAT Power Status (Continued) Survival Power Changes to power budget –Updated Trigger and Data Flow Included design presented during Power Supply Peer Review (removed linear regulators) Incorporated measurements in power supply efficiencies –Survival power updated to reflect selected heaters

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 23 FSW Resource Usage Current Estimates ResourceTotal AvailableAnticipated Usage Margin Factor EPU Boot PROM256 kB128 kB2 SIU Boot PROM256 kB128 kB2 EPU EEPROM6 MB1.5 MB4 SIU EEPROM6 MB MB3 EPU CPU cycles200% in 2 EPUs30%> 6 SIU CPU cycles100% in 1 SIU25%4 EPU memory128 MB16-32 MB4-8 SIU memory128 MB< 16 MB8 Bandwidth – instrument to EPU45 MB/sec10 MB/sec4.5 Bandwidth – EBM to CPU20 MB/sec5 MB/sec4 Bandwidth – CPU to EBM2.5 MB/sec20 kB/sec125 Bandwidth – EBM to SSR5 MB/sec40 kB/sec125

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 24 Key Science Performance Metrics

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 25 Risk Management

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 26 Risk Management Activity No new issues

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 27 Top risks to cost ID #Risk Rank Risk DescriptionRisk MitigationStatus Proj Mgt Moderate Parts and vendor orders have not been completed therefore flight production cost may exceed projection Manufacturing engineer added to expedite minimum cost closure Clarification and purchase package review to ensure accurate bids Processes in place Remaining vendor selections by 11/03 Proj Mgt Moderate Critical skilled positions (senior personnel) required to execute project remain open, potential impact to cost and schedule if not closed in short term Management team has identified critical skill needs Identify skilled personnel within Collaboration environment Added SLAC Site Rep in Italy Added Scientist to Tracker Team & Proj Eng Continuing to expand FSW support Identified additional QA support requirements Added additional Structural analyst support Added Design Eng Support

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 28 Top risks to schedule ID #Risk Rank Risk DescriptionRisk MitigationStatus Proj Mgt Moderate Completion of Tracker subsystem qualification program delayed due to EM closure or MCM electronics Manufacturing Eng assigned to close MCM issues Increased team integration with Italian partners GSFC audit/support to Tracker EM closure 50 Unit Pre-production run established with Teledyne, ECD: Jan 04 Engineer (Dave Rich) added to drive closure Added Design Eng Proj Mgt Moderate ASIC’s fail to meet requirements; results in schedule impact Focused review & test. Margin for re- runs protected where possible Individual risks Identified by subsystem DAQ ASIC’s flight ready, continued testing Tracker GTRC error found, plan in place Cal/ACD ASIC’s continued testing Proj Mgt Moderate TEM Power supply final design is delayed, final implementation may exceed current schedule Key focus item identified for DAQ Design peer review 9/03 Basing approach on flight proven designs where possible Peer review completed 9/22/03 Re-baselined, tight schedule for EGSE SE-007Moderate Critical component failure post LAT integration requiring de-integration impacting cost & schedule Extensive use of EM test bed to support flight H/W & S/W development Thorough qualification and acceptance tests Pre planned I&T actions for de- integration LAT Assembly plan under update to incorporate EM1 lessons learned,ECD: Jan 04

GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 29 3-Month Milestones Update the LAT-MD LATPVP – Released for review 12 Dec Complete FMEA – GSFC picking up task, bottleneck is transfer of work in process Complete Spacecraft ICD Rev 2 release review – 19 Dec Close remaining Internal ICD TBX’s - Complete Update System Metrics – Electrical updated this month, next mass update in Feb Complete X-LAT Review –Completed Complete CIDL update – Draft by 19 Dec Close all open RFAs – October->December->??? LAT I&T Assembly Sequence – 19 December Draft Dynamics Plan – 19 December LAT Survey Plan – 16 Jan 04 LAT Instrumentation Plan – 16 Jan 04