5 th SMOS Workshop, ESA-ESRIN, Frascati, Italy, 29 Nov-1 Dec, 2004 Summary: Core Activities in 2004 Establishment of new SAG Consolidation and fine-tuning.

Slides:



Advertisements
Similar presentations
ESA Iris Programme workplan of activities
Advertisements

ESA Iris Programme: status
3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting Jérôme.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
NGSS Town Hall Meeting October 1, a.m. - Noon Hall of Flags Houston Hall.
Landsat Data Continuity Mission (LDCM) USGS Project Status Report January 6, 2009 Dave Hair USGS LDCM Project Manager
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
SMOS SAG, November 2-3, 2006 SMOS Data Processing Ground Segment (DPGS)
CEOS Plenary Meeting Lucca, Italy November 8-9, 2011 CEOS Systems Engineering Office (SEO) Annual Report Brian Killough NASA Agenda Item #18.
ISSI WG on H 2 O Bern, Switzerland Feb , 2008 Contribution to GEO-CEOS ? Contacts: Jean-Christopher LAMBERT and Bojan BOJKOV aeronomy.be,
SMOS SAG 20 VILLESPA. Agenda 1. Welcome and Introduction 2. Reporting on on-going activities: 3.Airborne demonstrators - first results/limitation/discussion.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
Aquarius Soil Moisture Working Group July 21, 2010.
20th SMOS SAG Nov SMOS User Interactive Toolbox Specification -- J. Benveniste Development of Algorithms Specification for the generation.
1 Satellite & In Situ Salinity (SISS) Working Group: Current Status and Future Plans Yi Chao, Co-Chair (Jacqueline Boutin, Co-Chair) Aquarius Science Meeting.
6th SMOS Workshop, DTU Lyngby, Denmark, May 2006 Summary of ESA’s SMOS Science Activities Michael Berger ESA – ESTEC Earth Observation Programmes.
ESA Report to DAI/IPR WG Gian Maria Pinna ESA/ESRIN DAI/IPR meeting Colorado Springs January 2007.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
2013 GOES-R AWG 2 nd Validation Workshop January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting.
1 NISO Standards and Best Practices: Standardized Usage Statistics Harvesting Initiative (SUSHI) Oliver Pesch Chief Strategist, e-Resources EBSCO Information.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
ENVISAT Validation Workshop - Frascati - 9–13 December 2002 Opening Session:  Welcome [G. Kohlhammer]  Workshop Objectives and Organisation [H. Laur]
Sentinel-3 Validation Team (S3VT) Meeting ESA/ESRIN, Frascati, Italy, th November 2013 General Presentation Template for S3VT meeting Project name.
Progress report on the test facility project design and construction P. Schnizer and L. Serio on behalf of bldg. 180 test facility project team members.
Page 1 ASAR Validation Review - ESRIN – December 2002 ASAR Validation Review Introduction B. Rosich ESA-ESRIN ASAR C.P. Objectives Challenges in.
Establishing a UK OCO/GOSAT expert group Paul Palmer, Hartmut Bösch, Paul Monks, Peter Bernath et al White paper Expert Group: Why? What? Who? OCO Project.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
10° COSMO GENERAL MEETING Plans and State of Art at USAM/CNMCA Massimo Ferri.
Aquarius Ocean Salinity Open Discussion Yi Chao and Peter Hacker  Surface Stratification Advanced Argo floats Flag in situ data for expected mixed layer.
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
Overview Assessment Teaching & Learning Outside the classroom.
Data Curation Workflow
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
COPC Meeting, May 27 – 28 th 2015 NDE Operational Status and PDA Update Prepared by: Chris Sisko, NDE Operational Status.
Promoting Satellite Applications in the TPE Water and Energy Cycle Studies: Chance and Challenge Kun Yang Institute of Tibetan Plateau Research Chinese.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
ESA’s ENVISAT Satellite RGB Imagery from MERIS (ENVISAT) Applied Research in Geomatics, Atmosphere, Nature and Space (UK) Managing Director:
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
The Copernicus Sentinel-3 Mission: Update on status Susanne Mecklenburg – ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams.
Stephen Ambrose GOES-R Data Operations Manager (DOM) OSPO/SPSD March 12, 2013 GOES-R Ground Segment Project Data Operations Support Team System Validation.
S Yumiko Kimezawa A design of the ECG prototype system for two leads November 5, 20101Preliminary presentation.
1 ESA’s MSG program: status Eva Oriol-Pibernat ESA/ESRIN Frascati ITALY Boulder March 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Galileo Mission Consolidation & Maritime Needs December 18 th GISS, Brussels Status of Galileo Mission High Level Documents.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
US-Europe Data Exchange Meeting May Page 1 EUMETSAT Status Report Simon Elliott EUMETSAT Operations Department
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
UNSD – DFID project: Country Directors’ Meeting 15 – 17 October 2014 Improving the collation, availability and dissemination of development indicators.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
The ESA call for the 9 th Earth Explorer mission (EE9)
ACES User Interface Workshop #1 Prototype Inspection 22. November 2011.
Institut für Methodik der Fernerkundung International Workshop on Radiometric and Geometric Calibration - Gulfport, Dec I N T R O DU C T I.
SDCG-5 ESA/ESRIN, Frascati, Italy February 24-26, 2014 SDCG-5 ESRIN, Frascati February 2014 Name Organisation.
ENVISAT Validation Workshop Dec, ESRIN 130 ESA Staff (7%) 250 Industry Staff Dec, 2002.
ESA Iris Programme workplan of activities
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
Enterprise Algorithm Change Process
Albrecht von Bargen, Chair CEOS WGCV DLR Agenda Item # 6 GSICS-EP 17
Overview of the AATSR Validation Programme
Olathe South ACT Timeline Fall 2018
ESA SSA Roadmap for the L5 Mission
Recent activities of OCR-VC
SIT-31 Sessions CEOS SIT Chair Team ESA/ESRIN, Frascati, Italy
Web Service Security support in the SSE Toolbox
Sentinel Workshop: context
Presentation transcript:

5 th SMOS Workshop, ESA-ESRIN, Frascati, Italy, 29 Nov-1 Dec, 2004 Summary: Core Activities in 2004 Establishment of new SAG Consolidation and fine-tuning of SMOS product definition and L1/2 processing scheme Streamlining ideas for the OS retrieval scheme including correction schemes coSMOS initiation and preparation Mission promotion: publications, brochure, flyer Establishment of new SAG Consolidation and fine-tuning of SMOS product definition and L1/2 processing scheme Streamlining ideas for the OS retrieval scheme including correction schemes coSMOS initiation and preparation Mission promotion: publications, brochure, flyer

5 th SMOS Workshop, ESA-ESRIN, Frascati, Italy, 29 Nov-1 Dec, 2004 Core activities planned for 2005 Support to L2 prototype development Cal/Val AO / assessment Consolidating calibration/validation plan SMOS Science Report DOMEX / coSMOS Initiation of Assimilation Study Support to L2 prototype development Cal/Val AO / assessment Consolidating calibration/validation plan SMOS Science Report DOMEX / coSMOS Initiation of Assimilation Study

5 th SMOS Workshop, ESA-ESRIN, Frascati, Italy, 29 Nov-1 Dec, 2004

Project status: Science Prep. Open issuesSoil MoistureOcean SalinitySnow/Ice Consolidation of obs.req.: completed N/A Signal physics: Model improvement / parameterisation Improvements, remaining open issues Improvements, remaining open issues Open GS devel. support: Retrieval develop. Reconstruction Synergy Clear ideas exist On-going In prep. Activities started On-going ITT released N/A On-going Application support: Assimilation schemes other Open but experience from ELDAS Clear ideas, open issues need to addressed in follow- up activities open Validation: Scheme develop. Site sel./establish. Ideas exists Activities started Ideas exists Activities started Dome-C

5 th SMOS Workshop, ESA-ESRIN, Frascati, Italy, 29 Nov-1 Dec, 2004 What next? Mission / System PDR (May/June): Overall system architecture, specification, interfaces End-to-end performances Final planning Ground Segment: Level-1 processor phase-2 inititated Initial work on level-2 Synergy studies underway Cal/val: IR study on-going, WG calibration Cal/val plan consolidation coSMOS AO planned for 2005