Trigger Framework Tutorial Dan Edmunds Michigan State University 14-Apr-2009 The purpose of this talk is to present the general features of the Trigger.

Slides:



Advertisements
Similar presentations
Network II.5 simulator ..
Advertisements

L2 Online Reinhard Schwienhorst DAQ shifters meeting, 03/12/02.
ALICE Trigger System Features Overall layout Central Trigger Processor Local Trigger Unit Software Current status On behalf of ALICE collaboration:D. Evans,
L1CAL Online Software Philippe Laurens 31-May-2005.
DAQ System  We need to build a clone of the new test stand DAQ that is being put together at D0.
First Integration Tests Jovan Mitrevski, John Parsons Nevis Labs, Columbia University August 21/2003  on July 30/31, we successfully performed first phase.
Run IIb L1CAL TCC Philippe Laurens MSU 9-Feb-2006.
J. Linnemann, MSU 6/21/ Agenda L2 monitoring and readout Jim Linnemann 20 min Magic Bus Transceiver Dan Edmunds 20 min Plans for the GL2 Card Drew.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Functional Modeling Chapter 6.
H. EvansRun IIb L1Cal Meeting: 1-May-031 Goals of the Summer Integration Test Summer Integration Schedule –16-Jul-03 – 8-Oct-03 Test Infrastructure –what.
DØ L1Cal Trigger 10-th INTERNATIONAL CONFERENCE ON INSTRUMENTATION FOR COLLIDING BEAM PHYSICS Budker Institute of Nuclear Physics Siberian Branch of Russian.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Computer Networks IGCSE ICT Section 4.
The Application of DAQ-Middleware to the J-PARC E16 Experiment E Hamada 1, M Ikeno 1, D Kawama 2, Y Morino 1, W Nakai 3, 2, Y Obara 3, K Ozawa 1, H Sendai.
GBT Interface Card for a Linux Computer Carson Teale 1.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
L3 DAQ the past, the present, and your future Doug Chapin for the L3DAQ group DAQ Shifters Meeting 26 Mar 2002.
University of Palestine Faculty of Engineering and Urban planning Software Engineering department Software Engineering Group Project Design Document for.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
V.Sirotenko, July Status of Online Databases Currently there are 2 online Oracle Databases running on d0online cluster: 1.Production DB, d0onprd,
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
ELEC4601 Microprocessors Lab 2 Tutorial Signal Waveforms and Parallel port programming.
June, 2000NIU Workshop Online DAQ System: From Detector to Tape T. Yasuda Fermilab.
L3 DAQ Doug Chapin for the L3DAQ group DAQShifters Meeting 10 Sep 2002 Overview of L3 DAQ uMon l3xqt l3xmon.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
Performance of Programmable Logic Devices (PLDs) in read-out of high speed detectors Jack Fried INSTRUMENTATION DIVISION PLD ? PLD ? Muon Tracker PLD Muon.
DØ Level 1 Trigger 10-th INTERNATIONAL CONFERENCE ON INSTRUMENTATION FOR COLLIDING BEAM PHYSICS Budker Institute of Nuclear Physics Siberian Branch of.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
CPU The Central Processing Unit (CPU), has 3 main parts: Control Unit Arithmetic and Logic Unit Registers. These components are connected to the rest.
TOPIC: CENTRAL PROCESSING UNIT PRESENTED BY: MS. AMBER AMAR.
DØ Level 1 Trigger 10-th INTERNATIONAL CONFERENCE ON INSTRUMENTATION FOR COLLIDING BEAM PHYSICS Budker Institute of Nuclear Physics Siberian Branch of.
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Making Effective Poster Presentations. Additional Preliminary Research  Talk with PIs, advisors, mentors  Analyze audience  Involve all appropriate.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
R. Michaels, JLAB PREX Mtg, July 2008 Compton DAQ (General) Remaining experts : Sirish Nanda, Alexandre Camsonne, me Recent Exercises Port to vxWorks 5.5.
17 Apr 2002 MCLARG Electronics Meeting News HEC Preshaper PRR passed on Thursday Apr 11 LECC02 (Workshop on LHC Electronics) will be held in Colmar, France.
Online Software November 10, 2009 Infrastructure Overview Luciano Orsini, Roland Moser Invited Talk at SuperB ETD-Online Status Review.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Test Title Test Content.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
LHC experiments Requirements and Concepts ALICE
PyBAR Firmware Structure and Operation Experience
DAQ for ATLAS SCT macro-assembly
Particle Physics Group Christmas Meeting December 2016 Graham Miller
Controlling a large CPU farm using industrial tools
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Microsoft Word 2003 Illustrated Complete
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
Online DAQ Code Tutorial
CS 31006: Computer Networks – The Routers
SLB Synchronization in H4 Beam (LIP - Lisbon)
Example of DAQ Trigger issues for the SoLID experiment
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Computers.
 Is a machine that is able to take information (input), do some work on (process), and to make new information (output) COMPUTER.
The Trigger Control System of the CMS Level-1 Trigger
DAQ Software Support for PSEC at ANL and MTEST
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

Trigger Framework Tutorial Dan Edmunds Michigan State University 14-Apr-2009 The purpose of this talk is to present the general features of the Trigger Framework and its associated components in a tutorial presentation. This is done by showing the functions of the Trigger Framework from the viewpoint of a number of different systems.

TFW Tutorial Outline DAQ Context and Beam Structure in Run II: –Current Run II Beam Structure and Slang Terms –DAQ System Buffering Scope of the System, Physical Location, Hardware Implementation –Location in MCH –Basic Cards in the Trigger Framework Level 1 Functions of the Trigger Framework –Location of the Trigger Framework in making the Level 1 Trigger Decision –Simplified block diagram of the Trigger Framework L1 Decision logic Level 2 Functions of the Trigger Framework –Information to and from the L2 Global Stage –Simplified view of issuing the L2 Trigger Decisions Routing Master Function of the Trigger Framework –Trigger Framework Information to the Routing Master

TFW Tutorial Outline (continued) Readout to Level 3 Function of the Trigger Framework –Trigger Framework Readout to a standard VRB crate –Block Diagram of a standard VRB crate. Trigger Control Computer Connections to the Trigger Framework –Block Diagram of the Trigger Control Computer Connections to the Trigger Framework –Function of and data carried on these connections –Example of Commands from COOR Scalers and Monitoring Functions of the Trigger Framework –Sources of Monitoring Information –Trigger Monitoring and Luminosity Monitoring –Trigger Operation Monitoring vs Physics Analysis Monitoring –Content of the Monitoring Information Initialize and Cold Start of the Trigger Framework –What happens at Trigger Framework Initialize –Cold Start of the Trigger Framework and associated hardware

TFW Tutorial Outline (continued) The following web pages and references give more information about the D-Zero Run II Trigger Framework. – – – –Article title: The D0 Level 1 Trigger System Reference: NIMA48840 Journal title: Nuclear Inst. and Methods in Physics Research, A DOI information: /j.nima Available online at:

Buffering in the DAQ system

L1 Trig Framework Principal Functions

TFW and TFW TCC

Location of the TFW racks in MCH-1

TFW racks in MCH-1

a card from the TFW

One L1 Trigger Decision Logic

Geographic Sections

SCL Hub End

TFW TCC Connections (TRICS)

Power Up Instructions on the Web

Power Up Instructions (cont) …