1 Run IIb L1CAL TCC Philippe Laurens MSU 9-Feb-2006

2 Run IIb L1Cal System (slide by Hal Evans) BLS 2 EM + 2 H   EM H ADC + Digital- Filter (ADF) x 80 ADC + Digital- Filter (ADF) x 80 Trig Algo’s (TAB) x 8 Trig Algo’s (TAB) x 8 Global + Control (GAB) x 1 Global + Control (GAB) x 1 ADF Timing Fanout 1280 Existing BLS Cards 2560 EM +HAD TT 0.2x0.2 TT Signal Processing 8-bit TT Et Sliding Windows clusters sums Global Sums Framework Interfaces Timing (SCL) L2 & L3 Control (TCC) FrameworkFramework Jets EM Tau Et,Mpt timing/ctrl/vme timing/ctrl Cal-Trk Match encoded clusters Signals from L1 Track VME Interface & SCL Interface 16 EM 16 H BLS-to-ADF Transition System Patch Panel Cards (x80) Pleated Foil Cables (x160) Paddle Cards (x80) BLS-to-ADF Transition System Patch Panel Cards (x80) Pleated Foil Cables (x160) Paddle Cards (x80) 1280 Existing BLS Trigger Cables

3 Run IIb L1Cal System 10 racks in MCH1 M103-M112 Replace 25x Run IIa crates With 6x Run IIb crates and 40x patch panels 4x ADF Crates 1x TAB/GAB Crate 1x Communication Crate cf. http://www.nevis.columbia.edu/~evans/l1cal/install/M100-M113.pdf http://www.nevis.columbia.edu/~evans/

4 L1CAL IIb TCC … another TCC??? Currently fir Run IIa: –L1 TCC (aka d0tcc1.fnal.gov) interface to L1 Framework L2 Framework L1Cal (Run IIa) –L2 TCC (aka d0tcc2.fnal.gov) interface to L2 Preprocessors L2 Global

5 L1CAL IIb TCC … another TCC!!! For Run IIb: –L1 TCC (aka d0tcc1.fnal.gov) interface to L1 Framework L2 Framework –L2 TCC (aka d0tcc2.fnal.gov) interface to L2 Preprocessors L2 Global –L1Cal TCC (aka d0tcc3.fnal.gov) interface to L1Cal (Run IIb)

6 Run IIb L1 Calorimeter Trigger Control Path L1Cal Expert Programs L1Cal TCC COOR Monitoring Clients Bit3 V.I. Master (to ADF) V.I. Master (to VRB) VME/SCL (to TAB) SCL Distributor (to ADF) L1Cal Comm. Crate VME-9U ADF Crate #1 of 4 VME-6U ADF #20 V.I. Slave ADF #20 … ADF Crate #4 of 4 VME-6U ADF #20 V.I. Slave ADF #1 … … TAB/GAB Crate Custom-9U TAB #1TAB #8GAB … L1Cal Readout Crate VME-9U V.I. Slave VRB VRBCSBC L3 L2 Ethernet Optical Fiber Splitters to L2Cal Crate … P. Laurens Rev: 31-May-05 (ALS, PAL) TFW SCL

7 Run IIb L1Cal System (slide by Hal Evans) BLS 2 EM + 2 H   EM H ADC + Digital- Filter (ADF) x 80 ADC + Digital- Filter (ADF) x 80 Trigger Algorithm (TAB) x 8 Trigger Algorithm (TAB) x 8 Global + Control (GAB) x 1 Global + Control (GAB) x 1 Serial Command Link Distributor 1152 Existing BLS Cards [2560 EM + HAD] TT: 0.2 x 0.2 TT Signal Processing 8-bit TT Et Sliding Windows clusters sums Global Sums Framework Interfaces Timing (SCL) L2 & L3 Control (TCC) FrameworkFramework Jets EM Tau Et,ME T timing/ctrl Cal-Trk Match encoded clusters Signals from L1 Track VME Interface & SCL Interface 16 EM 16 H BLS-ADF Transition System Patch Panels x40 Patch Panel Cards x80 Pleated Foil Cables x160 ADF Transition Cards x80 BLS-ADF Transition System Patch Panels x40 Patch Panel Cards x80 Pleated Foil Cables x160 ADF Transition Cards x80 1280 Existing BLS Trigger Cables timing/ctrl/vme SCLD VME/SCL TAB GAB ADFv2 Patch Panels BLS Cables Rat’s Nest

8 L1CAL IIb TCC -- Functionality Same functionality for L1, L2, L1Cal TCC TCC = Trigger Control Computer –Control Interface to COOR –Monitoring Collect Information from hardware Serve Information to Monitoring Client(s) –Tests Calibrations, Tests, Diagnostics, etc; for expert

9 L1Cal IIb Control Software Partitioned –Control Code vs. GUI Operating System Independent – Windows & Linux – Python & C++ – Use D0 products ITC and Thread_Util

10 L1CAL TCC Control Software L1Cal TCC Bit3 L1Cal IIb Control Software (C++) L1Cal IIb Graphical User Interface (Python) L1CAL Comm. Crate Expert (e.g. at MSU) L1Cal IIb Remote Console (Copy of Screen Output) L1Cal IIb Graphical User Interface Host Computers COOR Monitoring Applications 8-Feb-06 ASCII commands over ITC Binary over ITC ASCII over ITC XML over ITC

11 L1Cal IIb Control Software L1Cal_IIb_TCS Trigger Control Software –Use C++ for robustness and execution speed –Control and monitor both ADF and TAB/GAB –Only software actually performing VME IOs –Interface presenting one L1CAL system to DZero –Ported in large part from current L1FW+L1CAL TCC –Allow local command files for flexibility –Keep a Logfile of all actions with time stamps

12 L1Cal IIb Control Software L1Cal_IIb_GUI (User Interface to L1CAL_IIb_TCS) –Different for Run IIb (not microsoft Visual C++) –Use Python with Tkinter for portability –Zero, One, or more GUI connected at given time –Not needed for COOR control nor monitoring –Run on TCC or from Remote computer –*Greatly* extendable with external python command files (of arbitrary complexity)

13 L1Cal_IIb_GUI

14 L1Cal_IIb_TCS– Run Control Interface to COOR –Hide hardware complexity –Present one unified L1CAL = ADF+TAB+GAB –Initialize the System to defined state –Translate high level COOR commands (ASCII ) into (a few or thousands of) VME IOs

15 L1Cal_IIb_TCS– Run Control How does it happen? A quick example run-through: –1) User/Trigger Meister –2) Trigger Database –3) COOR (via Taker) –4) L1Cal TCC

16 L1Cal_IIb_TCS– Run Control 1)User (or Trigger Meister) Would like to analyze events which "Require at least 1 jet with Et at least 10 GeV within |eta| of 3.2“ cf. available Run IIb trigger resources http://www.nevis.columbia.edu/~evans/l1cal/algos/algos.html

17 L1Cal_IIb_TCS – Run Control 2) Trigger Database Input (in part): –User (or Trigger List) defines a requirement for "CSWJT(1,10.,3.2)" –plus other filtering L1 requirements, L2, L3) –cf. http://d0db-prd.fnal.gov/trigdb/cgi/tdb_report_element.py?http://d0db-prd.fnal.gov/trigdb/cgi/ function=L1Script&insname=CSWJT(1,10.,3.2)_ncu&insversion=1 –cf. http://d0db-prd.fnal.gov/trigdb/cgi/tdb_report_element.py?http://d0db-prd.fnal.gov/trigdb/cgi/tdb_report_element.py function=Trigger_List&intlname=First_Run2b_list&intlversion=2.00 Actions: –Generate XML files defining these triggering requirements to COOR –cf. http://www.nevis.columbia.edu/~evans/l1cal/algos/coor/coor_syntax.html

18 L1Cal_IIb_TCS– Run Control 3) COOR (via Taker) Input (in part): [...] [... other andor term requirements...] [... L2 and L3 requirements...] [... other Specific Triggers…] –cf. http://www-d0online.fnal.gov/www/groups/trigger/official/special/http://www-d0online.fnal.gov/www/groups/trigger/official/special/ Run2b/First_Run2b_list-2.00.xml Actions (in part): –Send messages to L1Cal TCC to program the L1Cal resources Allocate one of the 7 TAB Jet Reference Sets for this request Program this reference set with a threshold of 10 GeV and an eta coverage of 3.2 Allocate one GAB CSWJT Terms to listen to this RefSet and require at least one jet cf. http://www.nevis.columbia.edu/~evans/l1cal/algos/trig_terms/trig_terms.html cf. http://www.nevis.columbia.edu/~evans/l1cal/algos/trig_terms/coor_params.html –Send messages to L1FW TCC Allocate one L1 Specific Trigger to implement this request Program this SpTrg to require the matching L1Cal andor term (among others) Specify which crates need reading out any time this Specific Trigger Fires –Start a new Run Number with this Specific Trigger Requirement

19 L1Cal_IIb_TCS– Run Control 4) L1Cal TCC Input: –"L1CAL_Ref_Set Jet_Et_Ref_Set 1 TT_Eta(-16:16) Energy_Threshold 10.0" –"L1CAL_to_L1FW Jet_All_Term 0 Use_Ref_Set 1 Count_Threshold 1" –cf. http://www.pa.msu.edu/hep/d0/ftp/run2b/l1cal/tcc/coor/http://www.pa.msu.edu/hep/d0/ftp/run2b/l1cal/tcc/coor/ coor_to_l1caltcc_message_syntax.txt Actions: –L1Cal_IIb_TCS server receives these messages from COOR –Parser understands the message syntax and extracts the request –Dispatcher calls corresponding executer routine with corresponding arguments –Executer routine loop over all TABs within TT_Eta/TT_Phi coverage (or single GAB) Program the TAB and/or GAB control registers via the VME/SCL keep track of overall success –Server sends acknowledgement message (Ok/Bad) back to COOR for each command message received

20 L1Cal_IIb_TCS– Run Control Cf. Expanded version of this run-through Including event processing by L1Cal, L1 FW, L2, etc: http://www.pa.msu.edu/hep/d0/ftp/run2b/l1cal/ tcc/coor/using_l1cal2b.txt