1 Daya Bay Muon system Installation Workshop, IHEP, July 14, 2010 1 Updated RPC Gas System Installation Plan Changguo Lu Princeton University.

Slides:



Advertisements
Similar presentations
LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Advertisements

CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG.
Daya Bay RPC Gas Safety System FDR, June 19, Daya Bay RPC Gas Safety System Design Changguo Lu, Kirk McDonald Princeton University (June 19/20,
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
E.H. #1 RPC Gas System Commissioning  “Leaky” modules’ study 1 Changguo Lu, Princeton University Qingmin Zhang, IHEP Shih-Kai Lin, University of Houston.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing RPC Assembly Changguo Lu, Kirk McDonald, Bill Sands Princeton University (July 28, 2007)
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
C. Lu, K.T. McDonald RPC Gas System Final Design Review April 11, 2008 Daya Bay RPC gas system fire safety issue Slides from Gas System FDR + a few more.
C. Lu, RPC Gas Slow Control Workshop, 6/10/2009, CUHK 1 1 RPC gas system slow control (CUHK, 6/10/2009) Changguo Lu Princeton University.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
1 PBX installation considerations BASIC TELECOMMUNICATIONS.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
EH#1 RPC Gas System Repair Report - Zhijian Zhang; Y. Lei; Qiang Xiao & Changguo Lu 11/5/2013.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
1 Daya Bay RPC Gas Safety System - Gas Cabinet Test Report Changguo Lu, Kirk McDonald Princeton University (October 11, 2009)
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
From Bare Chambers to Installable Chambers Muon Barrel Week Bologna April 11 th 2003 Alberto Benvenuti INFN Bologna.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
C. Lu, K.T. McDonald RPC Connections October 27, RPC Module Signal and HV Connections (October 27, 2008) Changguo Lu, Kirk T. McDonald Princeton.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
© ExplorNet’s Centers for Quality Teaching and Learning 1 Use appropriate tools for network cabling and connections. Objective – 2%
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Example of a LAN Last Update Copyright 2009 Kenneth M. Chipps Ph.D.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
How to Build a LAN Last Update Copyright 2007 Kenneth M. Chipps PhD 1.
PIXEL CAEN Installation Status
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
IT Set-up Plan Corporate Process Innovation Dept. Date: June 2014
Presentation transcript:

1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University

2 Daya Bay Muon system Installation Workshop, IHEP, July 14, Outline of the installation schedule The tasks relevant to RPC gas system installation in MuonInstallationRLS.mpp Gas mix room Gas room Gas cabinet vent port Gas room vent port

3 Layout of the gas/gas mixing rooms Wall power strip location View direction Wall power strip location GC PC

4 Daya Bay Muon system Installation Workshop, IHEP, July 14, Detailed plan for WBS items Daya Bay near hall RPC gas system and three GC systems delivered to Daya Bay by 8/30/2010; Install gas mixing/control system and 2 GC systems, DCS interface boxes, 10/8 – 11/5/2010 (we may need to start this task earlier due to the warranty deadline for 2 GCs is due on 10/21/2010) Prerequisites: Shipping boxes of gas mixing/control system and GCs delivered to gas/gas mixing rooms; Network wall plugs activated; DCS interface box cable ready, Desk for PC and GC; Power line activated; Water line for sprinkler installed. Manpower: C. Lu, (possible S. Chidzik) + Chinese labor contractor.

5 Daya Bay Muon system Installation Workshop, IHEP, July 14, Detailed plan for WBS items (cont’d) Chinese labor contractor tasks: Install gas manifolds for Argon, SF6 and R134A in gas mixing room; Route copper gas pipe from gas mixing panel to EH1; Hook up 6” gas ventilation pipe of the gas cabinet to gas room venting port; Connect water pipe to gas cabinet sprinkler; Mount emergency shut-off switch on wall and route wires to gas control panel. Coordination with other Muon installation tasks: Since this part of gas system installation is within gas/gas mixing rooms, it won’t interfere with any other installation tasks.

6 Daya Bay Muon system Installation Workshop, IHEP, July 14, Detailed plan for WBS items (cont’d) Install gas distribution and digital bubbler system in 10/8 – 11/5/2010 Temporally install it in gas mixing room. Prerequisites: Gas racks are available. Manpower: Princeton will take care of this installation. Occasionally may need 1 or 2 assistants from labor contractor. Coordination with other Muon installation tasks: There is no foreseeable conflict with other installation tasks during this period.

7 Daya Bay Muon system Installation Workshop, IHEP, July 14, Detailed plan for WBS items (cont’d) 6.8 Connect gas tubing between RPC modules and gas distribution & digital bubbler crates in 12/21 – 1/10/2011. Prerequisites: Gas distribution/digital bubbler crates moved onto supporting structure and tested in-situ; Utility tray on RPC module supporting structure installed. Manpower: Princeton supervises the installation, Chinese labor installs. Coordination with other Muon installation tasks: We need to coordinate with HV cable installation. Chinese labor contractor’s tasks: Cut plastic tubing to length and label two ends of each tube; Connect each end to its destination connector. IHEP may want to install support structure earlier, so this task also can be done earlier.

8 Daya Bay Muon system Installation Workshop, IHEP, July 14, 2010 Detailed plan for WBS items (cont’d) Route Cables & Gas Lines in Flex Tray (1/18/2010 – 2/1/2011) Prerequisites: Gas pipe from gas mix room to EH has installed; Gas distribution/digital bubbler racks have moved to supporting structure. Manpower: Princeton supervises, Chinese labor installs. Coordination with other Muon installation tasks: Since HV cables also need to be installed into the flex tray, we need to coordinate these two tasks. Chinese labor contractor’s tasks: Lay down the hose into the tray and connect each end to its destination connector.

9 Daya Bay Muon system Installation Workshop, IHEP, July 14, Detailed plan for WBS items (cont’d) Run and test entire RPC system, 2/2/2011 – 3/30/2011 Princeton will maintain the gas system at this start-up period, locally or remotely. Right now it is still too early to make detailed plan for this task.