HCAL RBX PRR 2 March 20011 H C A L RBX Monitoring RBX Production Readiness Review Monitoring, Fieldbus and DCS John E. Elias HCAL Electronics Coordinator.

Slides:



Advertisements
Similar presentations
The Detector Control System – FERO related issues
Advertisements

Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
The Control System for the ATLAS Pixel Detector
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
18/05/2005Kamil Sedlak1 ATLAS Data Acquisition and Controls DAQ … data characterised by event and run number. DCS … data characterised by (valid for) some.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
ACES 2011 The third common ATLAS CMS Electronics Workshop for LHC upgrades March 9-11, 2011, CERN, Geneva, Switzerland Hardware:  ATMEL ATmega128 microcontroller.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
Robert Gomez-Reino on behalf of PH-CMD CERN group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
1. The Experiment CMS 2. Architecture, what is DCS in CMS? 3. Joint controls project 4. SCADA system (supervisory controls and data acquisition) 5. Framework.
Readout & Controls Update DAQ: Baseline Architecture DCS: Architecture (first round) August 23, 2001 Klaus Honscheid, OSU.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Relevant Points l Currently the RS232/RS485 connection is used for:  Device monitoring  Remote Parameters setting  Remote Devices On/Off l All safety.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
Clara Gaspar, December 2012 Experiment Control System & Electronics Upgrade.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
60kW Thermosiphon control system
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
The LHCb Run Control System
Presentation transcript:

HCAL RBX PRR 2 March H C A L RBX Monitoring RBX Production Readiness Review Monitoring, Fieldbus and DCS John E. Elias HCAL Electronics Coordinator

DB Architecture of the CMS control system (functional block diagram): Run CTRL ext.communication(LHC,infrastructure,magnet, safety,…) LAN (ethernet ) FE electronics Calibration events (T, laser, …) Downloading and reading of constants and programs DAQ, Trigger Request to download and read of constants and programs Selection of runtype resource manager (selection of needed resources) Communi cation with sub detector controllers Standard slow control SCADA System Supervision of subdetector controllers Classsical slow control Supervisory System Subdetector 2 controller Subdetector 1 controller DB Wolfgang Funk -CERN CMS fieldbus devices, PLCs, VME, HV+LV power supplies fieldbus ( CAN, Profibus,..) (OPC, others) Device Server Devices Sensors, Actuators 11/02/2000 2

HCAL RBX PRR 2 March H C A L Clock and Control Module One clock and control module per RBX Star configuration, not daisy chained Control functions Download the Channel Control ASICs Readback (verify) the Channel Control ASICs Configure the TTC Rx Readback the electronics temperatures Readback the low voltage supply values Execute master reset on command Translate between fieldbus and RBX serial bus

HCAL RBX PRR 2 March H C A L Proven CAN bus technology ATLAS Tile Calorimeter ATLAS DCS Radiation tolerance Part availability Design Basis

HCAL RBX PRR 2 March H C A L Part NumberAvailabilityRadiation Tolerance Philips PCA82C250NCheckingATLAS Tile Calorimeter & ATLAS DCS Hewlett Packard HCPL-0601/0731StockATLAS Tile Calorimeter & ATLAS DCS Analog Devices ADG706BRUCheckingFermi Lab will test. Siemens/Infineom SABC505CA4EMTR CheckingATLAS Tile Calorimeter used a C501 Philips P87C591VFAA18 wk – Lead timeChecking if fab process is similar - PCA82C250N AMD AM29F010StockATLAS Tile Calorimeter Texas Instruments 74HC05StockFermi Lab will test. National Semiconductor DS90LV110Preliminary PartChecking with National in regards to possible testing. National Semiconductor DS92LV090A Production/Sampl es Checking with National in regards to possible testing. National Semiconductor DS90LV031A StockNational Semiconductor Enhanced Solutions Radiation Assured Product Analog Devices AD590KHStockFermi Lab will test. XILINX Virtex FPGAStockhttp:// Candidate Parts

HCAL RBX PRR 2 March H C A L Clock Distribution

HCAL RBX PRR 2 March H C A L Control Block Diagram

HCAL RBX PRR 2 March H C A LSummarySummary Monitor and control integrated with DCS Joint Controls Project team at CERN provides hardware and software support for CAN bus Client/server interface to the official SCADA, PVSS II, to be done by DUBNA collaborators Engineering Development platform for CAN is LabView Principal challenge is implementing the functional block diagram using radiation tolerant COTS – the design may not be as simple and elegant as it could be otherwise Prototype milestone is July 2001