AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando 407.380.4685 4 November,

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

Software change management
Configuration Management
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008.
MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
Authoring Instructional Materials (AIM)
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
AIM FRB Meeting 4-6 November Meeting Logistics Parking Base Access – not needed Coffee Vending Machines Food Facilities Come & Go as needed…
AIM Toolset Interfaces with Authoritative Technical Data
Authoring Instructional Materials (AIM)
Authoring Instructional Materials (AIM) Roadmap
NSW AIM FRB Utilization Discussion Karen Pohl Curriculum Systems Director Naval Special Warfare Center 4-6 November, 2009 Orlando, FL 1.
AIM FRB Briefing NAVSEA 07TR3 Sandra Wiegmann Submarine Training Systems Division NAVSEA 07TR3 4 Nov 2008.
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM – CeTARS Web Service Interface: Course Master Schedule and Other Possibilities November 2008.
Academic Services Interactive Media Managing the Web with Java JA-SIG Winter 2002 Robert Sherratt Academic Services, Interactive Media.
AIM Program Software Status
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Configuration Management
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
1. Report status of traditional and modernized AIM
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
S1000D/SCORM Progress for Training Support Acquisition Data Standardization Initiative and the Pathways to Efficiencies Unpublished work © 2010 Aerospace.
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
AIM Virtual FRB Meetings Sep, & 1400 Both Days.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
NETPDTC AIM Central Site and CPM Hosting 4-6 May 2010 Bruce Bare, NETC, CIO Denise Green, CNATT, N6 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.
Center for Personal and Professional Development Harrison-Youngs/ Bartholomew ISD CPPD 4 November 2008.
AIM ACR Prioritization AIM ACR Prioritization 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Ron Zinnato, AIM Lead Engineer Jamie Stewart, AIM Lead ISD.
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
1 AIM FRB Briefing Karen Pohl Curriculum Systems Director Naval Special Warfare Center 3 Nov 08.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
1 NETC N7 Status Update to AIM FRB 4 November 2009 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
NETC Authoring Instructional Materials (AIM) Roadmap February Bruce Bare.
AIM Program of Record Roadmap for Migration and Sunset
AIM Program of Record Roadmap for Migration and Sunset
General Services Department State Purchasing Division
Presentation transcript:

AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November, 2008

Focus of Presentation AIM Background & History AIM Current Software Status AIM Future Software Status Demos, Questions

Authoring Instructional Materials (AIM): Government-owned & managed system used by the Navy to design, develop, update, manage, and integrate training content Provides automated conformance to standards (NAVEDTRA 130A/131A, ILE, & RIT II) resulting in efficient, cost effective development & maintenance of learning content Links learning requirements to performance standards Links learning content to Interactive Electronic Tech Manuals (IETMs) (**S1000D & other formats) Automates identification and notification of potential learning content update requirements based on performance standard & tech data changes Streamlines integration of changes into previous learning content baseline with minimum impact (because built on relational database) Supports multiple output methods (paper, PDF, HTML, & SCORM conformant XML formats) AIM is a mature application & service provider supporting the development & sustainment of 300,000+ instructional hours of formal Navy training content

AIM-based Learning Content Usage* Big “3” Example Others include: NSWC SPAWAR NMPT&E NNSY CPPD CNE CID CEODD CSS *Data captured in 4 th Quarter of FY07

AIM Management Organization System Support Office (SSO) NAWCTSD Orlando System Support Office (SSO) NAWCTSD Orlando Program Manager OPNAV N75 Program Manager OPNAV N75 Program Manager NAWCTSD Orlando Program Manager NAWCTSD Orlando Configuration Control Board (CCB)/ Resource Sponsorship: Surface/Air/Sub/NETC Configuration Control Board (CCB)/ Resource Sponsorship: Surface/Air/Sub/NETC Functional Area Manager OPNAV – N00T Functional Area Manager OPNAV – N00T Executive Steering Committee (ESC) Functional Requirements Board (FRB) Executive Steering Committee (ESC) Functional Requirements Board (FRB) Functional Area Manager OPNAV – N12 (proposed) Functional Area Manager OPNAV – N12 (proposed) Functional Area Manager OPNAV – N79 Functional Area Manager OPNAV – N79 Functional Area Manager OPNAV Functional Area Manager OPNAV Columbus Technologies- Prime Support Contractor Columbus Technologies- Prime Support Contractor

CNET drafts Operational Requirement (OR)1981 NPRDC Conducts R&D NPRDC Awards R&D Contract1987 CNO Establish Project Manager 1989 AIM MNS/Milestone 0 Approved1990 Milestone I/II approved1992 Initial version of AIM (UNIX) distributed1993 Milestone III approved (Implementation)1994 AIM System Support Office (SSO) at NAWCTSD Established1994 AIM I Implementation1996 AIM II Implementation1997 Program Management Shift to NAWCTSD1997 IETM Interface1998 SCORM Output Utility2001 SQL Server2002 Word as editor; IMI Library2003 AIM first GOTS SCORM Adopter2004 Prototype LO Module; NMCI certification**2005 Navy ILE ILT authoring/maintenance tool**2006 Prototype Content Planning Module (CPM)**2007 NMCI Certification & Distribution of AIM LO Module**2008 CPM Operational**2008 AIM Historical Perspective Program of Record with history of continuous improvement and successful adaptability in meeting the user’s changing requirements and technology advances. **Key Components of Modernized AIM

AIM Current Software Status AIM I/II Rel 3.3 – Superseded Rel – NMCI certified in May 08 – Pushed to NMCI end users in Jun-Jul 08 – Includes first version of Learning Object (LO) Module – Central site Citrix Metaframe enhancements – CMS Web service interface to CeTARS Content Planning Module (CPM) 3.0 – GAT conducted May 08 – Operational s/w posted Jun 08

AIM Software Plans - Modernization AIM I/II Rel 4.0 – LO Module  Initial GAT conducted Jun 08  Significant additional functionality being coded now; in work for Mar 09 delivery for testing  Anticipated NMCI push Jun 09 – CPM  Significant additional functionality being coded now; in work for Mar 09 delivery for testing  Anticipated operational Jun 09 – Interim builds available to support ongoing ILE projects – FRB-prioritized ACRs incorporated in LP/TG modules

AIM Software Plans – Modernization (contd) AIM I/II Rel 4.1 – LO Module  requirements define by FRB feedback on FRM  planned delivery for GAT and NMCI testing in Mar ‘10  anticipated NMCI push in Jun ‘10 – CPM  requirements defined by FRB feedback on Functional Reqts Matrix  planned delivery for GAT testing in Mar ‘10  Operational in Jun ‘10 – Interim builds available to support ongoing ILE projects – FRB-prioritized ACRs incorporated in LP/TG modules

AIM Modernization Timeline

Software Demo & Discussion