Figure 6-1: Transport Request Data Entities: CS: Customer OM: Order manager OPM: Operational manager FM: Fleet Manager MM: Maintenance manager OBT: On.

Slides:



Advertisements
Similar presentations
Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Advertisements

Order Inquiry and Change Order eCommerce Enhancements An Overview to eCommerce Enhancements March 2012.
ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
E-Ticket Airline Reservation System (ETRS)
The Modules Freight forwarding & Transportation Freight forwarding & Transportation Finance & Fixed assets Finance & Fixed assets Warehouse Warehouse.
1 Introduction to Transportation Systems. 2 PART II: FREIGHT TRANSPORTATION.
DCMS: Training Manual Help Desk Management July, 2010.
Introduction of FUTÁR System. Basic data of FUTÁR System Devices to be installed The investment cost of project: EUR Vehicle consolidated with.
WP5 - Estimated Time of Arrival: verification of the F-Man approach and identification of effects on fleet management Athens -Greece Sept 2004 National.
Paris, June Wagon management information flow on Slovenian Railways wagon ordering wagon maintenance.
Workflow & Event Derivation Workshop
Massimiliano Di Pace1 INTERNATIONAL PAYMENTS Handling international payment can be complicated and risky The problems can be: - currency - transfer of.
WP3- Development: Milestone M3 Lisbon 30 January 2004 National Technical University of Athens.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
WP5 - Estimated Time of Arrival: verification of the F-Man approach and identification of effects on fleet management Athens -Greece Sept 2004 National.
Setup for Sales and Distribution
Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation.
ΑΝΝΕΧ 3 by SCIRO. Task 2.1 – Functional requirements definition Task 2.1 aims at drawing the functional analysis of F-MAN, starting from the users’ needs.
Kranjska Gora, Test plan - PI will test F-MAN tools on: - 2 types of wagons (Uacs, Himrrs) - 2 types of operation (timetable supervision.
1 SCIRO - Bled /09/02 WP2 Functional Requirements and Architecture External Functional Analysis (D4) & Internal Functional Analysis (contribution.
Adjustment & COCP Barbara Kwok Licensing Operations Specialist.
TOL’s All You Need to Know ACACSO, Austin TX Nov 10 – 12, 2014
Workflow & Event Derivation Workshop
Octopus F-MAN FM OPM OM Standards and Norms Environment MM Wagons F2 F1 F3 Contractual data Wagons owner F4 F5 F6 F9 F7 F8 F10 F11 F12.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Rail Related Research at IIT Madras
Enhancing ERP System with RFID: Logistic Process Integration and Exception Handling Dickson K. W. CHIU Senior Member, IEEE Eleanna Kafeza Athens University.
ADMINISTRATION REVISION – BLOCK 8 TRAVEL. WHO NEEDS TO TRAVEL ON BUSINESS? The Managing Director- to visit other branches of the firm The Sales Representatives-
Importer Security Filing “10 + 2”. What is it? Required electronic filing of certain data elements 24 hours prior to the vessel loading in the foreign.
Presentation by SNCF in 19/20 April 2004 Meeting in Kranjska.
Member Mail Order Helpful Hints, Reminders and Tools.
X one. Mobile development platform We mobilize your process IP. ALARMS AUTOMOTION.
PROCURE TO PAY 25 SEPT 2014 Project Symphony. 2 Procure to Pay Thursday Sept 25 8:00 – 8:15am: Introduction & Recap of 2 nd day 8:15 – 9:45am Purchase.
Sub-Contracting Request Demo 1.Role of Unit Maker 1.Preparation of Sub-Contracting RequestPreparation of Sub-Contracting Request 2.Submission of Sub-Contracting.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
The Prospectus and Common Application Process My Course My Future Greater Manchester Prospectus
Installation Date Selection at Register - January Installation Selling Communication Sears Approved Provider Installation Date Selection at Register.
ELOGMAR – M Portal Presentation. The main Web-page of eLOGMAR-M Web – portal is presented at your attention in this window. The interface language can.
Windows 8 Upgrade Offer Registration Training For Support Agents Updated 24 July 2012.
Slide #1 Computerised Transit Computer System Training Session Trader Application Users.
Liftslides. - 2 paths for success 1)FastTrack Standard Panel Sizes Standard Configurations 2)CustomTrack Standard Sizes/Custom Configurations Custom Sizes/Standard.
PAM Module PAM-Integration Amongst Systems COA NTES Train Running Data PAM COA Exceptional Information PRS Exceptions: Rescheduling Cancellation Origin.
HTPL Import Export Process ************. Import Process at HTPL Receiving of IGM Details Inward entry by Boarding Officer Receipt of Scanning list by.
EDI Legs Overview. EDI 214 The EDI 214, which contains the leg and other shipping information, is sent to JSI from the freight forwarder. The USAID |
E Multimedia Communications Anandi Giridharan Electrical Communication Engineering, Indian Institute of Science, Bangalore – , India Multimedia.
Interactions & Automations
RAILDATA Centralbahnstr. 6, CH – 4051 Basel RAILDATA Data exchange between the RU.
Slide n° 1 EU railway legislation - Safety regulatory framework NAB/RB training workshop in Valenciennes, April 2016 NAB/RB Training Workshop In Valenciennes,
Keys to Case Study Chapter It was not right for the buyer not to take delivery of the goods. In this case, the contract concluded between the seller.
Activity processes of brokers in carrying out operations on the customs clearance of goods Activity processes of brokers in carrying out operations on.
Doc.: IEEE /1299r0 Submission Dec 2009 Allan Thomson, Cisco SystemsSlide 1 BSS Transition Improvements Date: xx Authors:
56 Resources u Icons represent resources u Dynamic resources must be assigned a path network u Resources position at nodes, not locations u “Specs” field.
ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.
ROUTE MANAGER TRAINING
"Step by Step" Guide to implement TAF TSI
TAF TSI implementation in LDZ CARGO Ltd
Presented by: JoAnne Miner Director
Car Hire TOL’s ACACSO, Coeur d’Alene, ID May 11 – 13, 2013
The Telephone Sales Presentation
Global Engine Tracking System Overview - Supplier View
Non-RU Applicant (NRA), PCS UG
Mike Schwab Cell: Fax Starting at $99.00
Press login Icon to log into Qualcomm unit.
Fret SNCF's Future Transport Policy &
marketing can accomplish many different marketing goals.
ACACSO May 10, 2018 Kellie Bates Norfolk Southern
System Restoration Coordinator Subcommittee Thursday February 28th
An equipment manager’s perspective
Presentation transcript:

Figure 6-1: Transport Request Data Entities: CS: Customer OM: Order manager OPM: Operational manager FM: Fleet Manager MM: Maintenance manager OBT: On board terminal

OPM*FMF-Man toolOM time Wagons request in coded form (O/D, loading, departure and delivery dates, wagons quantity and type) Wagons request (O/D, loading, departure and delivery dates, wagons quantity and type) F-Man options: alternative sets of empty wagons (criteria: cost, wagons location, time availability…) A request for verification of the OPM availability to move wagons to the transportation origin The OPM confirmation of availability (foreseen path and timetable) Wagons movement confirmation Order confirmation One Wagon Running Event messages (departure and arrival dates, delivery, restitution…) Delay detection Wagons are empty and again available F-Man action perimeter Order for the sending of empty wagons Information to release the other alternative 6 5 Transport request Transport confirmation 3 OBT OPM*: Operational manager CS Transport request including : - O/D, - loading, departure and delivery dates, - freights type and quantity or - wagon types and quantity Real time events 11 10

1: The OM receives the customer request and converts it into various type and quantity of wagons, that he submits to the FM. 2: The FM puts in F-Man tool information linked to the request (a given quantity of wagons per type to bring at given place and date for loading) and asks for solution. 3: The F-Man tool provides ranking information based on overall cost : a set of empty wagons, which can satisfy the request. 4: The FM selects one of the alternative proposals. 5: The OPM says if trains are available to do the transport. 6: The F-Man tool changes the status of wagons, chosen by the FM. 7: The OPM receives from the FM the order of sending the empty wagons to a loading place. 8 : To continue his logistic offer, the OM asks the OPM for the transport of loaded wagons from a given place at a given date to a given destination for a given date. 9: The OM receives from the OPM the confirmation of the loaded wagon transport feasibility. 10: During the transport of wagons (empty or loaded), the F-Man tool can detect delay through out event messages from the TOC and real time events sent by OBT. 11:When wagons are empty and available again, the F-Man tool inform the FM. Arrow types Feed information back Request, order or answer

3 Cases of Delay

OPMFMF-Man toolOM time Wagons request in coded form (O/D, loading, departure and delivery dates, wagons quantity and type) Wagons request (O/D, loading, departure and delivery dates, wagons quantity and type) F-Man 2nd best solutions: alternative sets of empty wagons (criteria: cost, wagons location, time availability…) A request for verification of the OPM availability to move wagons to the transportation origin The OPM confirmation of availability ( foreseen path and timetable) Wagons movement confirmation Order confirmation Order for the sending of empty wagons Information to release the other alternative 6 5 Transport request Transport confirmation 3 OBT If the first solution is not used for any reason, F-Man tool proposes a second best solution that also satisfy the request. One Wagon Running Event messages (departure and arrival dates, delivery, restitution…) Delay detection Wagons are empty and again available CS Transport request including : - O/D, - loading, departure and delivery dates, - freights type and quantity or - wagon types and quantity Real time events 11 10

OPMFMF-Man toolOM time Wagons request in coded form (O/D, loading, departure and delivery dates, wagons quantity and type) Wagons request (O/D, loading, departure and delivery dates, wagons quantity and type) A request for verification of the OPM availability to move wagons to the transportation origin Wagons movement confirmation Order confirmation Order for the sending of empty wagons Information to release the alternative 6 5 Transport request Transport confirmation 3 OBT One Wagon Running Event messages (departure and arrival dates, delivery, restitution…) Delay detection Because the OPM can not move the predicted empty wagons, the FM has to ask to the OPM for a new set of wagons, proposed by the F-Man tool as the 2nd best solution F-Man options: alternative sets of empty wagons (criteria: cost, wagons location, time availability…) The OPM invalidation of availability ( foreseen path and timetable) Wagons are empty and again available CS Transport request including : - O/D, - loading, departure and delivery dates, - freights type and quantity or - wagon types and quantity Real time events 11 10

OPMFMF-Man toolOM time Wagons request in coded form (O/D, loading, departure and delivery dates, wagons quantity7 and type) Wagons request (O/D, loading, departure and delivery dates, wagons quantity and type) A request for verification of the OPM availability to move wagons to the transportation origin Wagons movement confirmation Order confirmation Order for the sending of empty wagons Information to release the other alternative 6 5 Transport request Transport confirmation 3 OBT One Wagon Running Event messages (departure and arrival dates, delivery, restitution…) Delay detection F-Man options: alternative sets of empty wagons (criteria: cost, wagons location, time availability…) The OPM confirmation of availability ( foreseen path and timetable) The FM has to ask the OPM to move empty wagons of the 2nd best solution Wagons are empty and again available CS Transport request including : - O/D, - loading, departure and delivery dates, - freights type and quantity or - wagon types and quantity Real time events 11 10

Figure 6-3: 2 Cases of Maintenance

OPMFMF-Man toolOM time Event messages (departure and arrival dates, delivery…) MM Hints for maintenance actions Transport request (to the workshop) Transport confirmation Wagons in workshop Preventive Maintenance Sending order of wagons in work shop Delay detection Maintenance delay Put back of wagons into circulation Maintenance delay OBT Real time events F-Man action perimeter Hint types: -Theoretical date of sending in preventive maintenance -Type of preventive maintenance -present or future location of wagons -location of the workshop CS

1: The MM receives hints from the F-Man tool to organise the sending of wagons to the workshop, by a transport request to the OPM. 2: After the OPM confirmation, the MM sends toward the OPM an order of empty wagons transport to the workshop. 3:The F-Man tool receives event messages (from the OPM) and real time events (from the OBT) on the condition of transport and delivery of wagons and then dispatches the information towards the FM and the MM. 4: The MM looks after the maintenance procedures and informs the F-Man tool and the FM in case of delay. 5: The MM informs the F-Man tool when wagons are put back into circulation.

OPMFMF-Man toolOM time Event messages MM Wagons in workshop Curative Maintenance Sending order of wagons in workshop Delay detection Maintenance delay Put back of wagons into circulation Maintenance delay OBT Real time events Event messages (departure and arrival dates, delivery,damage…) Delay detection Delay information Delay information if wagons are empty Delay information if wagons are loaded Transport request (to the workshop) Transport confirmation F-Man action perimeter CS Delay detection 6 7 8

1: The F-Man tool detects a delay during the transport. 2: The F-Man tool informs the MM about a damage on wagons. 3: The MM transmit the information to the FM if the wagon is empty, to the OM if the wagon is loaded. 4: The MM asks the OPM for a transport and sends the order of transport after having the transport confirmation. 5: During the empty wagons transport, the F-Man tool can detect delay: information come from the OPM and the OBT, through event messages and real time events. 6: Thanks to event messages, the F-Man tool transmits the information concerning the arrival of empty wagons to the workshop. 7: The MM looks after the maintenance procedures and informs the F-Man tool and the FM in case of delay. 8: The MM informs the F-Man tool when wagons are put back into circulation.