Paul Emma LCLS FAC April 16, 2006 1 Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Dmitry Kayran R&D: G5 test and Commissioning Plan Eduard Pozdeyev, Dmitry Kayran BNL R&D ERL Review February 17-18, 2010 R&D.
Advertisements

Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
Joe Frisch LCLS FAC Oct. 30, Linac/BC2 Commissioning (Dec through Sep., 2008) J. Frisch, et al. LCLS FAC Meeting.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Patrick Krejcik LCLS April 29, 2004 Breakout Session: Controls Physics Requirements Overview P. Krejcik.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
Paul Emma, et al. LCLS FAC May 13, LCLS Commissioning: Results & Plans P. Emma, for the LCLS Commissioning Team LCLS FAC.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
James Welch October 29, 2007 Injector Commissioning Injector Commissioning Results presentated to the Facilities Advisory Committee,
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Hamid Shoaee LCLS Facility Advisory Committee 20 April Plans for 2006 Installation April 20, 2006 Injector commissioning.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
P. Emma, SLACICFA XFEL July 29, 2004 Electron Bunch Measurements with a Transverse RF Deflector P. Emma ICFA XFEL 2004 Workshop July 29, 2004 ICFA.
David H. Dowell RF Gun Commissioning LCLS FAC April 16, RF Gun Commissioning Experience David H. Dowell for the LCLS Injector.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Low Emittance RF Gun Developments for PAL-XFEL
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
Diagnostics Overview for the LCLS Presented by Josef Frisch For the LCLS ANL / LBNL / LLNL / SLAC.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
A single-shot method for measuring fs bunches in linac-based FELs Z. Huang, K. Bane, Y. Ding, P. Emma.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Beam-Based Feedback in LCLS-II
Thermal emittance measurement Gun Spectrometer
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LCLS Gun Commissioning Status & Plans David H
Electron Source Configuration
Commissioning Status of the LCLS Accelerator and Undulator Systems
LCLS Injector Diagnostics
Linac/BC1 Commissioning P
Compact linear accelerator FLUTE: status update
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
LCLS Commissioning P. Emma, et al
High Level Physics Applications for LCLS Commissioning
Linac Physics, Diagnostics, and Commissioning Strategy P
Breakout Sessions SC1/SC2 – Accelerator Physics
Maximum Credible Beam Event Paul Emma et al
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Breakout Session SC5 – Control Systems
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Injector Diagnostics Status
Injector/BC1 Commissioning (Jan through Aug. 2007) P. Emma, et al
Injector Physics C.Limborg-Deprey Feb.8th 2006
Isotope Readiness Review Run Plans
Presentation transcript:

Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee Meeting April 16, 2007 LCLS

Paul Emma LCLS FAC April 16, ~45 m (150 ft) RF Gun & Solenoid + YAG screens GunSpectrometer L0a&L0b S-Band Linacs OTR & Wire Scanners Straight Ahead Spectrometer Transverse RF Cavity L1 S-Band Linac Bunch-Compressor-1 (BPM, OTR, collimator) Wire Scanners + OTR Bunch Length Diagnostics X-Band RF TD11stopper 135 MeV 250 MeV LCLS Injector Through BC1 6 MeV

Paul Emma LCLS FAC April 16, Electron Beam Transported to All Injector Areas April 5: First photo-electrons from gun (6 MeV) April 5: First e  to gun spectrometer (6 MeV) April 8: First e  to inj-spectrometer (127 MeV) April 9: First e  in linac to TD11 dump (127 MeV) April 14: First 250-MeV beam through BC1 Up to ~330 pC of charge (370 µJ laser energy) 10 Hz beam & 30 Hz RF (30 Hz e  also tested) Gun RF feedback running well (+ water)

Paul Emma LCLS FAC April 16, Pre-Beam Tunnel Check List Almost Complete etc. etc. 40 pages, ~2000 checks – all DONE (except a few missing screens) Serial numbers Polarity conventions Installation orientation Field type (quad, dipole)

Paul Emma LCLS FAC April 16, RF Processing of L0b (20-8) March 10 March 25 Thanks to R. Akre & AMRF

Paul Emma LCLS FAC April 16, Gun Temperature Feedback Loop Gun Temperature Gun RF Probes RF On RF OffRF On Thanks Phil Cutino, Claudio Rivetta, Joe Frisch

Paul Emma LCLS FAC April 16, µsec Gun RF coupler (input power) Gun Reflected Power Gun RF probe (cavity power) Thanks Arnold Vlieks 11 MW (~120 MV/m) Gun RF Power (30 Hz) Time laser here with diode

Paul Emma LCLS FAC April 16, Virtual Cathode (optical image of laser spot on cathode)

Paul Emma LCLS FAC April 16, Beam on YAG02 (80 cm from gun) 20 mm

Paul Emma LCLS FAC April 16, Laser Phase (Shottky) Scan 30º 50 µJ laser energy

Paul Emma LCLS FAC April 16, Beam on Gun Spectrometer 5.7 MeV

Paul Emma LCLS FAC April 16, Beam to Injector Spectrometer 135 MeV BPMs worked almost immediately! energy GUN Steering was easy with few correctors on strong SDMP

Paul Emma LCLS FAC April 16, Trajectory to TD11 (in main linac) GUN TD11 DL1 energy BPM oldBPM BPMs worked almost immediately! oldBPM BC1BPM BC1 energy BPM

Paul Emma LCLS FAC April 16, L0a RF Phase Scan on Dispersed BPM X L0a RF phase (deg-S) high energy Spect. BPM X Reading after Bend (mm)

Paul Emma LCLS FAC April 16, Bunch Charge vs. Laser Energy calibrations need confirmation Iris cut clips laser energy 330 pC 370 µJ at cathode

Paul Emma LCLS FAC April 16, EPICS Controls - Vacuum Manual valve

Paul Emma LCLS FAC April 16, EPICS Controls - Magnets

Paul Emma LCLS FAC April 16, EPICS Controls – Profile Monitors

Paul Emma LCLS FAC April 16, Long Ion Chamber Along Full Accelerator YAG03 inserted YAGS2 inserted

Paul Emma LCLS FAC April 16, Charge and Position Jitter – Shot to Shot 100 shots at 10 Hz using BPM immediately after gun X-position jitter is 10 µm rms 20 µm Charge jitter is 2.6% rms 2%

Paul Emma LCLS FAC April 16, BC1 Chicane Control and Compression RF phase:  40º RF phase: 0º RF phase:  40º Ceramic Gap Bunch Length Monitor BC1 X-Mover (mm) BC1 BPM X (mm) OTR screen still needs camera Slope = MeV when X = 0 BPM offset checked using BC1 collimator jaws to locate beam in X

Paul Emma LCLS FAC April 16, Problems/Issues Gun Faraday cup broken (pneumatic error) Gun toroid shorted during installation Gun z-position not right yet (7.5-mm interference) YAG screens not setup before installation (hard-stops) Still need to install cameras and air lines for 7 screens No toroids working yet (1 shorted, 3 left to install) BC1 motion control limited (300 mm  260 mm) QE about 4-times lower than design (to be verified) Some controls tools late (orbit displays & fitting) MCOR power supply ADC readback noise (~1%)

Paul Emma LCLS FAC April 16, Injector Commissioning Goals ssrl.slac.stanford.edu/lcls/internals/commissioning/documents/l clsinjector-commissioninggoals.doc

Paul Emma LCLS FAC April 16, Summary Beam transported to all areas (no trouble) No obstructions or ‘backwards’ components, etc (but no systematic checkout yet) Controls still developing, but working well and improving fast – great cooperation and effort Communication with laser group excellent Screens and toroids late, but installation continues Some quality control issues with a few components Thanks to all – First indications are very positive