1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectSept 3, 2003 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Overview.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST LAT ProjectPMT Procurement Review May 24, 2002 AntiCoincidence Detector Design Overview 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD)
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
Gamma-ray Large Area Space Telescope
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
GLAST Large Area Telescope
GLAST LAT System Engineering
Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: David J. Thompson Thomas E. Johnson NASA Goddard Space Flight Center Subsystem Manager/Instrument Manager

2 GLAST LAT ACD FTF 3/17/05 Significant Accomplishments u All flight phototubes are complete. u Flight Electronic Chassis 4R installed on ACD. u Completed vibration and TVAC testing of Flight Electronics Chassis 2L, 1L, and 3L. 2L is ready for integration to ACD. u Upgraded to LATTE Enlisted help for test software development.

3 GLAST LAT ACD FTF 3/17/05 Electronics Chassis Assembly and Test Plan Base Electronics Assembly (1) Electronics Chassis (8) (4 double + 4 single) Electronics ChassisAssemblyEMI/EMCVibrationThermal Vacuum Qualification / Flight Spare CompleteQualification (completed) Qualification (completed) 12 cycles (completed) #1CompleteNot plannedComplete #2CompleteNot plannedComplete #3CompleteNot plannedComplete #4CompleteNot plannedComplete #5CompleteNot plannedIn progress3/10/05 > 3/21/05 #6CompleteNot planned3/9/05>3/23/05Descoped #73/1/05>3/16/05Not planned3/11/05>3/25/05Descoped #83/2/05>3/17/05Not planned3/11/05>3/25/05Descoped 8X

4 GLAST LAT ACD FTF 3/17/05 Initial TDA/TSA I&T in B7 ACD Subsystem Efficiency Verification test (include rotate ACD 90 degree)(10d) EMI/EMC Test (9d) Pre-ship Review (PSR) Vibration Test (5d) Thermal Balance/ Thermal-Vac Test (20cd) Mass Properties (2d) Pre- Environmental Review (PER) Acoustic Test (3d) Install & test 1 st flight Chassis onto ACD Qual Electronics Chassis Environmental Test 1 st flight chassis Environmental Acceptance Test (8d) The remaining Seven Flight Chassis Environmental Acceptance tests (25d) 10/4 – 2/5/052/7 - 2/15 ACD Full Functional Test(6d) Install Thermal Blanket & MMS(4d) 4/12 (TBR) Assemble last 2 rows of TDAs & WSF ( , , , ) onto TSA ACD Integration complete 2/16-3/23 3/24 – 3/30 6/10/04 – 1/28/05 2/15 – 2/22 Install & test remaining flight Chassis onto ACD 2/28 – 3/18 3/23/053/31 – 4/94/11 – 4/12descoped4/14 – 4/19 4/20 – 4/224/23 – 5/125/13 – 5/14 5/17 5/28 Schedule Flow Post ship Check out (5d) ACD RFI ACD ship to SLAC (5d) 5/18 – 5/23 5/24 – 5/28

5 GLAST LAT ACD FTF 3/17/05 Issues and Concerns The principal issue is schedule, which drives cost. Anything that affects our extremely aggressive schedule is a concern. Snow EGSE EMI Magnetic Shields Additional vibration testing Documentation (CMMI, test reports, data packages etc..)

6 GLAST LAT ACD FTF 3/17/05 EGSE – Test Stands Recent Activities –Crashes in long runs traced to memory leaks, mostly in third-party software. Fixed as of LATTE –We have modified ACD software to handle the new features and are running LATTE ACD software development has been more time-consuming than expected (ACD issues, not related to LATTE 4.7.3). Unfinished Work: 31 scripts needed. 28 working, 3 in development. –The unfinished scripts are those needed to test detectors and full ACD. –Software for handling calibration files and establishing baselines is still in development (not just scripts) Some help from the GLAST Project and the Calorimeter –GLAST Project has extended funding for our lead software developer, who was scheduled to move off ACD due to funding limitation. –GLAST Project funded a short-term test conductor, freeing up time for our other test conductors to concentrate on script and calibration file development –Byron Leas of the Calorimeter group has agreed to help with software to handle calibration files. Thanks, Neil and Byron!

7 GLAST LAT ACD FTF 3/17/05 EMI – Waivers and Additional Tests The ACD qualification chassis did not meet all the EMI/EMC requirements. Emissions are higher at some frequencies than the LAT specification, including one in the GPS band. There are no simple fixes. GLAST Project may request a re-test. CSCM test, which was skipped at recommendation of Goddard EMI personnel, has been replaced with CS114 test (a safer version of the same test). This test can be run in the lab. The principal ACD descope is to eliminate EMI testing at the full ACD level, which requires a waiver of this test requirement. The basic rationale is that we do not have a flight interface and would have to do testing with our unshielded GASU under the ACD (for cable lengths), making any test results suspect. CR has been submitted to the LAT. No action yet. Rebaseline savings of cost and schedule have assumed this CR is approved.

8 GLAST LAT ACD FTF 3/17/05 Magnetic Shielding Phototube Cap Magnetic Shield. ACD tried to save some money by using a combination of stainless steel (154 locations) and mu-metal (40 locations) magnetic shields, based on preliminary tests that indicated this approach was practical. The stainless steel shields did not work well enough (became more magnetized over time than expected). Back-up of getting limited quantity of mu-metal shields was delayed in the Goddard shop for various reasons. An order was placed ($20K), but first shields did not arrive last week when expected. We cannot complete final integration of the light- transmitting fibers to the chassis without these shields. Schedule impact to integration. Tom Johnson spoke to the fabrication shop and they promised to deliver (overnight) the first 40 shields on March 14.

9 GLAST LAT ACD FTF 3/17/05 Additional Vibration Testing - A s mall frequency shift has been seen during X axis vibration testing of the qual chassis and the first 4 flight chassis (shifts ranged from 7 -11% which is about 8-13 Hz). The theory explaining this drop has been a slip/settling between the two PMT rails as they are not pinned together (and do not need to be pinned together) -We are confident it is not a failure or major fatigue but wanted to explain the shift if possible -Analysis predicts a frequency drop of 10% if the preload on the PMT rail fasteners is removed. This is consistent with our theory and test results. - Repeated x axis vibration testing using the Qual chassis confirms that the shift is due to settling of assembly, not failure. After numerous tests (-12dB, -6dB, full level and 4 at -6dB), the frequency dropped from the initial level of 97Hz to 87Hz, with no change seen following the full level test. - This test was not part of our schedule.

10 GLAST LAT ACD FTF 3/17/05 CMMI ACD is one of three projects chosen by Goddard management to participate in a NASA-Headquarters-mandated assessment of “Capability Maturity Model Integration” system (CMMI). CMMI is described as covering more topics than ISO. Michael Amato (Systems Engineer) and Lorna Londot (Configuration Management lead) were in CMMI training and workshops for four days last week. Tom Johnson was tied up for a day. Many members of the ACD team are preparing for extensive interviews and reviews of documentation, to be held next week. These are the same people who should be working on all the documentation (including the Acceptance Data Package) we need for upcoming reviews. Needless to say, the ACD schedule will take a hit.

11 GLAST LAT ACD FTF 3/17/05 Other Issues - IDD sheet with harness brackets LAT had requested we add reveal a possible conflict with a blanket ground plate we need to add to the BEA covers. -Sent LAT a drawing for them define any interferences so we can modify or move plate (or harness) if possible