1 Safety Instrumented Systems ANGELA E. SUMMERS, PH.D., P.E. SIS-TECH Solutions, LLC We’re Proven-in-Use.
Advertisements

Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
1 MICE Radiation Shutter Description Present status Plans, schedule and remaining work MICE CM26, 24-27th March, 2010.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
K. Long, 27 June, 2015  Target K. Long, Monday, 06 July 2009.
1 E. Carrone 1 FEE PPS Status FAC FEE PPS Status Enzo Carrone June 8, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009.
 Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test.
1 Walk-in slide. 2 How to Manage a System Upgrade The Good, The Bad and The Ugly of Conversions David Cervelli Managing Consultant April 25, 2006.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
WBS 1.7: AFE II Project Cost and Schedule Alan Bross DZero Run IIb AFE II Director’s Review April 13, 2005.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
K. Long, 2 December 2014 Spokesman’s update 1. Contents: Update Step IV – Installation and commissioning – Preparations for data taking Shift tool; CHEESE.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
Design for Energy Star Martha Layne Collins High School Shelby County School District Shelbyville, Kentucky.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
SunSatFriThursWedTuesMon January
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Time Remaining 20:00.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Racquetball Launcher Project [Names]. Initial Launcher Design Drawing [Insert your first design drawing here.]
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Friday, April 22MAT 146. Friday, April 22MAT 146.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Networks Physical Infrastructure Rick Finnegan April 22, 2008.
ESS Program Plan and Schedule Update
Chris Booth Sheffield 29th March 2006
Target Installation Plan
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Safety Instrumented Systems
View Address Page Helpful Hints
RESULTS AND USE OF RESULTS
Project Manager’s Report + DC/MoM Report
MICE CM31 Schedule summary
Safety Instrumented Systems
Current Status Future Progress Monitoring
Baby MIND beam test status
Welcome & Charge for the Meeting
On the National Scene.
Schedule of Taxes, Fees, and Charges Annual Update Fiscal Year 2017
Ciprian Plostinar Workshop on Testing and Commissioning
Overall time schedule of SRF activities
LCLS-II Cryoplant Controls Workshop.
Stanton Standards Review
Customer Issue Management CoMC Update for April & May 2019
Accelerator Installation Schedule
TEAM NAME: VERSION 2 MODEL TEST 1
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

K. Long, 13 June, 2015  Target K. Long, Friday, 24 th April 2009

Critical path: No particular issues, but: – Need to consider parallelising (\cite{BushSnr}) assembly to reduce time from completion of shaft to assembly of _TWO_ targets

Manufacturing: highlights:

Installation and commissioning schedule: Presented / discussed at Target w/s last Friday Revised version to be presented / discussed at CM24 Need to have Target w/s with ISIS in June: – Make sure manufacturing remains on track; – Discuss installation and commissioning plans; – Ensure manpower assumptions for shutdown are valid