06-Dec-2004 HCAL TriDAS 1 TriDAS Status HCAL Group.

Slides:



Advertisements
Similar presentations
GCT Source Card Status John Jones Imperial College London
Advertisements

José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
CMS/HCAL/TriDas. Sept, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland September 2003.
CMS ESR. May, 2004 HCAL TriDAS 1 HCAL TPG Status Tullio Grassi University of Maryland May 2004.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
HCAL Trigger Primitive Generator Tullio Grassi University of Maryland September 2004.
UMD Jan Overview Fanout Card (in GLOBAL mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Unique board for.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Clocking Drew Baden University of Maryland December 2003.
CMS/ESSC. May, 2002HCAL TriDAS1 HCAL FE/DAQ Overview Shield Wall CPUCPU DAQ RUI HPD FE MODULE DAQ DATA SLINK64 [1 Gbit/s]  18 HTRs per Readout Crate FRONT-END.
USCMS Mayl TriDAS Update Drew Baden University of Maryland USCMS HCAL.
HCAL/TriDas. November, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland November 2003.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland June 2004.
Drew Baden, UMD Nov HCAL Trigger/Readout Texas Tech Meeting February 2001 Drew Baden, Tullio Grassi University of Maryland.
HTR status Tullio Grassi Univ. of Maryland Feb 2004.
CMS June TriDAS Update Drew Baden University of Maryland USCMS HCAL.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland March 2004.
Drew Baden, UMD Nov HCAL Trigger/Readout CMS/Tridas November 2000 Drew Baden, Tullio Grassi University of Maryland.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
21-Jun-2005 HCAL TriDAS 1 HCAL TriDAS Status Drew Baden, University of Maryland For the HCAL Group: Boston University Fermilab Princeton University University.
CMS Electronics Week November Electronics Issues Drew Baden University of Maryland USCMS HCAL.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland December 2003 What’s new since September 2003…
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Status of the CSC Track-Finder Darin Acosta University of Florida.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CMS/CERN. June, HCAL TPG and Readout CMS HCAL Readout Status CERN Drew Baden University of Maryland June 2002
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
13-Feb-2004 HCAL TriDAS 1 HCAL Tridas SLHC Drew Baden University of Maryland February 2004.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Possible SLHC Modifications to Clock Distribution Chris Tully, Dan Marlow Princeton Madison, Wisconsin February 13, 2003 Current SLB Clock Distribution.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Status of NA62 straw readout
Alberto Valero 17 de Diciembre de 2007
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
ECAL OD Electronic Workshop 7-8/04/2005
Calorimeter Trigger Synchronization in CMS,
TTC system and test synchronization
Introduction HCAL Front-End Readout and Trigger Joint effort between:
Geneve The Alps Where is CERN? Jura Mountains Lake Geneva 18-Sep-18
HCAL Configuration Issues
Synchronization Policy: HCAL will follow ECAL as much as possible
Darin Acosta University of Florida
USCMS HCAL FERU: Front End Readout Unit
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

06-Dec-2004 HCAL TriDAS 1 TriDAS Status HCAL Group

06-Dec-2004 HCAL TriDAS 2 HTR Status Goal: produce 270 Rev 4.3/4.4 HTRs by end of Summer 05 Current status: –PCB manufacture complete – boards are now at the assembler –Assembler New vendor from Rev 3 version So far boards look good, but some rework needed –Vendor employs optical pattern recognition technology, needed some tuning Assembler agreed to make HTRs in batches of 20 (or larger) –First batch for more tuning, then produce as many as we can handle »~1/week batch of 20, ramping up to batches of later as things get smoother –Parts All parts in hand except octopus (fiber breakouts) – PO went out last Friday –Schedule First batch of HTRs expected end of March –Assembler was told to produce “sandwich” boards first…. Expect to have all HTRs produced, tested, and shipped by ~July

06-Dec-2004 HCAL TriDAS 3 TPG Generation TPG firmware has been well simulated for over 1 year 150 GeV pion beam in HE TPG test performed during synchronous running in Sept 2004 –Trivial identity LUTs for linearization –Form TPGs using simple peak algorithm –Readout with raw data with corresponding TPG –Compare in time

06-Dec-2004 HCAL TriDAS 4 Trigger Primitive Generation

06-Dec-2004 HCAL TriDAS 5 Loading TPG Tables LUT evolution –For actual running – LUTs will be complicated tables Muon bits Pedestal subtraction Calibration sin  A project is underway with the CMS HCAL/EMu/Pixel DB group to store and access the LUT tables from Oracle/MySQL directly into the HTRManager DAQ application. –First production version to be used in SX5, ready for Slice Test Prototype is functional now…

06-Dec-2004 HCAL TriDAS 6 TPG LUT Verification How do we verify the TPG LUT? –We need to know the Xilinx FW and all the TPGs. –Too much data to store all to a central place for verification Solution: store “CRC”s Firmware CRC –HTR uses Altera FPGA for VME and Xilinx FPGA downloading –Each Xilinx download generates 24-bit CRC which is stored for VME readout TPG LUTs –These are smaller, can be easily covered by standard 16-bit CRC –Need an interface between DAQ components and TriDAS stuff to verify CRCs TBD

06-Dec-2004 HCAL TriDAS 7 HTR Firmware Firmware changes for latency –Asynchronous fifo changes from incoming clock phase to common –Will monitor fifo latency and report over VME and to DCC –Reset of fifo over VME –Will also reset fifo after loss-of-link recover (via FSM) Implemented data injection via VME into RAM –Will be useful for Level 1/HTR integration tests Starting to work on zero suppression Not yet working on the variety of summing for TPGs –HB vs HB/HE overlap vs HF Histogram firmware for HCAL sourcing in progress –Need to port to latest HTR revision... this month… Battle tests – will be among many things tested in slice 05

06-Dec-2004 HCAL TriDAS 8 L1 Synchronization Sources of variable latency: –Each TTCrx has variable latency ~20ns Varies chip-to-chip, voltage and temp dependent –TLK2501 has variable latency 76 <  T < 107 bit times, 3 <  T < 6 frames (20bit 80MHz) Plan to track this: –HCAL Front-end tools Fast laser calibration pulses TTC BC0 sent to FE, encoded into data stream –HTR tools SLB histograms Beam in only 1 bucket at some time would be good –Verification…

06-Dec-2004 HCAL TriDAS 9 HTR Production Working on software now Will use separate VME crate/DAQ setup to keep development crate free HTRs will be labeled, tested, cataloged, sent to CERN Will test at Maryland: –Basic operation (FPGA, Localbus, VME) –SLB connectivity Will not test quality of clocking… – BER optical test on all channels Will use RBX if it arrives…otherwise will use emulator

06-Dec-2004 HCAL TriDAS 10 Activities in 904 Test each HTR –Populate each card with 6 SLBs –Test with RCT receiver board –Validate clock, synchronization, quality… Populate VME crates with HTRs and store until November –Will have to wait for the SLBs –Current status has SLBs arriving en masse ~May? System testing, integration, commissioning… –We should push hard on SLB/RCT testing so that SLB firmware settles

06-Dec-2004 HCAL TriDAS 11 HTR SLB Testing Maryland “sandwich” board –HTR and RCT Receiver are the “bread” Used to host RCT receiver to be able to test each link Status: –Prototype validated with RCT Receivers, no problems seen –New version being produced now, ready this week HTR “Sandwich” SLB UW Receiver SLB connector UW receiver connector TOP BOT

06-Dec-2004 HCAL TriDAS 12 Fanout Card Built by Jeremy Mans and Chris Princeton To be used for both ECAL and HCAL to implement synchronization –RX_CLK and RX_BC0 for SLBs

06-Dec-2004 HCAL TriDAS 13 TPG alignment – BCID implementation Unique board for HCAL and possibly ECAL HTRHTR HTRHTR HTRHTR HTRHTR HTRHTR HTRHTR HTRHTR HTRHTR HTRHTR HTRHTR HTRHTR HTRHTR … … Rack-to-Rack CAT 7 Low-skew distribution tree for global BC0 (and CLK) VME : get histograms results and adjust timing Fanout Card (in GLOBAL mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) One board per crate

06-Dec-2004 HCAL TriDAS 14 RX_CLK and RX_BC0 Path TTC fiber CLK40_Des1 FPGA RX_CLK, RX_BC0 TTCrx QPLL FPGA TTCrx QPLL Fanout board in Crate-mode Fanout board in Global-mode 3.3V CMOS Path is 3.3V differential PECL on Cat6 quad twisted pair RX_BC0 is generated from the FPGA decode of TTC broadcast HTR SLB Max skew on HTR traces is 0.7 ns. Spec is: Skew <  12 ns across HCAL and ECAL RX_CLK RX_BC0 TTC and CLK80 added Cat6

06-Dec-2004 HCAL TriDAS 15 Fanout Status All PCBs for non-QPLL “fix” produced but not assembled All parts in hand Waiting a to see how the QPLL issues settle out –Anyone already implemented this, we would appreciate feedback Baseline plan: –Layout with QPLL fix complete and 30 boards submitted –Will assemble 2, available by mid April for testing –If ok, then assemble the rest If not, then assemble the non-QPLL fix version Reminder: This will be used for both ECAL and HCAL