GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook.

Slides:



Advertisements
Similar presentations
Intern Management System Resource Teachers. Modules Resource Teacher Timesheet –Create timesheet –Enter & Save timesheet activities –Sign-off on & Submit.
Advertisements

Office of Program Development and Funding Electronic Grants Management System Tutorial #5: Creating a Property Report (Equipment Inventory and Receiving.
GALVESTON COUNTY, TX P-CARD TRAINING GALVESTON COUNTY.
August 2014 Liver quest User Demo: Liver Quality Enhancement Service Tool (QuEST)
Cornerstone Base Station for Calibration Management Applied System Technologies, Inc N.W. 53rd Street, Suite 101 Fort Lauderdale, Florida
Single Search By Rakphao Theppan, librarian Searching Online Resources.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 1 Monthly Mission Review Project Status Overview May 2, 2007 Ken Fouts SLAC.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project CCB Review – June 2 nd, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 2 nd, 2005 E-Logbook.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT Project CCB Review – May 17 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review May 17 st, 2005 E-Logbook.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
Logging into ITAMS as an Exempt Employee To Login to ITAMS for the first time: Open your web browser. Click File, Open, and type the following address:
Introduction Globus Toolkit™ Developer Tutorial The Globus Project™ Argonne National Laboratory USC Information Sciences Institute
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT ProjectOnline Peer Review – July 21, – Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review April 1 st, 2005 E-Logbook.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
On-Line Database Placement Application Tutorial. How to Change Your Information On York’s System.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
Application Software: Essentials for knowledge workers
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Page 1 Overview of SATERN Approval Process for Supervisors Note: this package does NOT cover all SATERN functionality for supervisors. Supervisors are.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Introduction to Colleague An introduction to using Durham Tech’s Enterprise Resource Planning System (ERP)
Healthy Kids Zone Team Introduction Chad Honkofsky 2.
Verigy V93000 Service Training
Training Role Module 8 – User Admin Ver. 10 Oct 2009.
SeaLandings and eLogbook An Overview of Electronic Reporting.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
Support.ebsco.com Introduction to EBSCOhost Tutorial.
XP Practical PC, 3e Chapter 3 1 Installing and Learning Software.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
Server/Environment Management July 8th, Agenda Overview of Environments Infinicenter Console Monitoring Updates Security Certificates Atlassian.
Inventory. © beas2009/Page 2 This documentation and training is provided to you by beas gmbh. The documents are neither approved nor in any way acknowledged.
Chair of Software Engineering Exercise Session 6: V & V Software Engineering Prof. Dr. Bertrand Meyer March–June 2007.
Introduction to EBSCOhost Tutorial support.ebsco.com.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
Plant Engineering Workbench 5.2 SP1 New Features.
Gold – Crystal Reports Introductory Course Cortex User Group Meeting New Orleans – 2011.
The Business Source Databases Basic Searching Tutorial support.ebsco.com.
A user guide to accessing, reviewing and contributing to the Online Registry System.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 2.2 Budgets & Metrics 1 GLAST Large Area Telescope:
2007 TAX YEARERO TRAINING - MODULE 41 ERO (Transmitter) Training Module 4 Acknowledgements.
ProCal-Track Fast, Efficient Goods Inwards With Barcode Scanning Support.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
Document Module Features Streamlines the control, routing and revision process for critical documents and records Controls documents in any format (Excel,
PubMed Basics Barbara A. Wood, MLIS Calder Library University of Miami Miller School of Medicine.
QA process for Business Catalyst projects.. Starting a project What QA needs to start testing::  Specifications – A detailed description of the product,
Introduction to EBSCOhost
LAT Performance Updates Plans and Procedures
Installing and Learning Software
Configuration Management
Installing and Learning Software
Customer Online Ordering
ConnectingOntario ClinicalViewer
Release Process June 11, 2017.
Tutorial Introduction to support.ebsco.com.
GLAST Large Area Telescope
GLAST Large Area Telescope GLAST Large Area Telescope
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Introduction to EBSCOhost
GLAST Large Area Telescope
Presentation transcript:

GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook Release Alicia T. Kavelaars Online Engineer SLAC Gamma-ray Large Area Space Telescope

GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 2 Agenda We will cover: –E-Logbook New Features –E-Logbook Fixed Problems –E-Logbook Documentation –E-Logbook V&V –Next release: Outstanding Issues

GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 3 E-Logbook New Features –Edit and Remove Component capability with QA approval: Can’t remove a component already used in the database. Edits carry throughout window system. –New Doxygen Package Documentation Accessible Online here.here –REAL TIME access to mirrored READ ONLY data copy outside the firewall via local installations of E-Logbook. Full implementation for every Log. Updated every 5 minutes. –New Questionnaire.

GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 4 E-Logbook New Features –LAT FHW Matrix Log: Displays currently installed FHW information in grid format: –Serial Numbers –Weights Selectable weight units (Kg or Lb). Printable.

GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 5 E-Logbook New Features Addressed JIRA Issues: –Release Notes for E-Logbook 3.5.0Release Notes for E-Logbook New Features –[ELB-71] - LAT component installation summary report –[ELB-77] - Edit Capability with QA approval for Components in Main Window –[ELB-80] - E-Logbook Questionnaire

GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 6 E-Logbook Fixed Problems Addressed JIRA Issues: –Release Notes for E-Logbook 3.5.0Release Notes for E-Logbook Bug –[ELB-75] - Clear Torque Information on First Demate (If Applicable) –[ELB-76] - Mate action is not passed when cancelling an entry –[ELB-78] - Minor Bugs on Context menu and MMR Print procedures Improvement –[ELB-67] - Ability to have more than one Run Report detail window –[ELB-79] - Reports cannot be closed while creating a record.

GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 7 E-Logbook Documentation and V&V Documentation: –LAT-PS released.LAT-PS released. –E-Logbook Tutorial.E-Logbook Tutorial. –E-Logbook Website.E-Logbook Website. V&V: –Full Test of E-Logbook on 06/28/05 passed. –Test Report for E-Logbook signed off on 06/28/05 by QA and I&T Manager.

GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 8 Next E-Logbook Release Next Release: Outstanding Issues –Any outstanding JIRA Issues.