GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 1 Monthly Mission Review Project Status Overview May 2, 2007 Ken Fouts SLAC.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ISOCMonthly Status Review - ISOC, 1 August GLAST Large Area Telescope Instrument Science Operations Center Monthly Status Review 1 August.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project CCB Review – June 2 nd, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 2 nd, 2005 E-Logbook.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project CCB Review – May 17 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review May 17 st, 2005 E-Logbook.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review TVAC at NRL? Status July 12, 2007 Neil Johnson.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review April 1 st, 2005 E-Logbook.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectT&C Database Management, 1 July GLAST Large Area Telescope T&C Database Management 1 July 2005 Bryson Lee
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
I&T&C Organization Chart
Mechanical Integration
GLAST LAT System Engineering
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
Presentation transcript:

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 1 Monthly Mission Review Project Status Overview May 2, 2007 Ken Fouts SLAC Gamma-ray Large Area Space Telescope

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 2 LAT Project Status 4/12Observatory PER completed 4/12LAT Radiator dry fit/install complete

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 3 LAT Planned Milestones ActivityECD LAT MLI Closeout for EMITBD LAT FSW /1/07 LAT Radiator Flight InstallPre-TVAC LAT FSW /26/07

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 4 I&T/Online Progress  LICOS released and installed on the MCR .dbx (as opposed to LCAT) based C&T DB – Solves command enumerations problem  AlarmHandler update to allow sensitivity to configuration  Well tested against test bed, but: – No trial run against the LAT yet  Bent pipe updates  Telemetry redaction is now.dbx based  Warns operators of NAKs and disconnects  Preparing configurations for compatibility with FSW B  Configuration tool development (Populates MOOT DB)  LPA configurations built (still need verification)  Handling of APIDs other than LPA, LCI and M7 from SSR  Working TDFAnalysis issues (OSYS-143)  MCR maintenance  Various JIRAed bug fixes

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 5 Online JIRA issues (as of 4/30) Package Issues opened since 3/5 Issues closed since 3/5 Total # of issues currently open LICOS19238 LICOS_Config4114 LICOS_ETC LICOS_Scripts INT2917 LDF001 LSF000 E-Logbook0321 Totals

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 6 Top I&T Online JIRA issues  Updates for TVAC (LS-233)  State dependent limit handling to avoid false, or irrelevant, alarms (LE-8)  DFI integration into analyses (LS-88, LCS-72, LE-40, LE-38, LE-37, LE-36, LS-214)

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 7 LAT Mechanical Ops prior to EMI  LAT alignments need to be complete since the LAT reflector ball locations are covered up by the LAT MLI.  GD needs to asses how many of these locations are required for interim alignment checks to minimize blanket removal each time)  Re-route LAT test instrumentation wiring, tie down & put ends inside an EMI (conductive material) bag  Re-route chiller lines (install 90 degree unions) to exit LAT MLI in a way that we can seal around for EMI testing  Install patches on inside X-side blankets (per existing NCR)  Close-out & tape LAT MLI.

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 8 LAT Issues and Concerns  Observatory command and telemetry dropouts  Reviewing command and telemetry logs for additional supporting data.  Responding to requests from GD for specific information related to known events.  LAT SE will continue to support GD when requested.  LAT Test Time  Additional LAT test time availability during EMI testing – LICOS trial run against the S/C + LAT – Install B – Rerun Calibration runs  Observatory Schedule  LAT MLI closeout for EMI  Flight installation of LAT Radiators  RS103 levels of 150V/M  Tests/analysis at CKC of the circuit at 80V/M show minimal risk

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 9 Cost Reports for 4.1 LAT March 2007 Month End Gamma-ray Large Area Space Telescope

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 10 Cost Status by Organization

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 11 Cost by Orgs with Variances >$100K

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 12 FTE Report