Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.

Slides:



Advertisements
Similar presentations
EQT Production Company - exploration and production company in the Appalachian basin.
Advertisements

FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Construction Contracting
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Procurement Management
Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
Ensure Vendor/Engineer of Choice Product Quality
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Evaluation of Bids and Contract Award Module 6: Session 7.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
First Article Inspection Report
Chapter 3 Project Initiation
IS4799 Information Systems and Cybersecurity Capstone Project
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
CIVL202 Construction Engineering I
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
Component Specification Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
NASA Johnson Space Center Contracting Officer and Contracting Officer’s Technical Representative.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Effectively Responding to Award Solicitations Objective Identify elements of a government solicitation package. Respond more effectively to government.
First Article Inspection
Managing Project Procurement
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Chapter 8 - The Planning and Writing of Persuasive Proposals 1 Proposals Proposals are marketing tools that sell your ideas to others A persuasive document.
Contractors & contracts
PPMT CE408T Engr. Faisal ur Rehman. Presentation Outline Project Porcurement Managment Project Closure.
Magnetic Material Specification and Procurement Strategy Dawn Munson 1.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
TBPC Brown Bag Presentation Texas State Government
CONSTRUCTION CONTRACTS DOCUEMENTS
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Office of Procurement Services.  Vendor Application Website: 
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
IT PROJECT MANAGEMENT B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Contracting for Evaluation Products and Services by James B. Bell
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
FIDIC Tendering Procedures
Project Management – PTM712S
Procurement Management
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
Request for Proposals For Banking Services CMU
Award Management Services
Bidding Requirements Review Questions.
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
Request for Proposal - Best Value
Subaward Life Cycle 10/24/17.
9/18/2018 Bids CONTRACTING Khamis…..
Quality Management Systems – Requirements
PRODUCT EVALUATION & TESTING BRANCH SUPPLIER SUPPORT DIVISION II
Request for Proposal & Proposal
Request for Proposal - Best Value
PROJECT DELIVERY METHODS
Procurement & Strategic Sourcing
Presentation transcript:

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Undulator Long Lead Procurements Glen Lawrence, ANL November 15, 2004 StrategyRequirements Source Selection Plan Bid Lists Procurement Quality Assurance StrategyRequirements Source Selection Plan Bid Lists Procurement Quality Assurance

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Strategy Define Requirements Statements of Work Engineering Drawings Decide on a Source Selection Plan Cost Cost Technical Technical Go-NoGo Go-NoGo Pre-qualified Bidders Pre-qualified Bidders Develop a Bid List Procure Long Lead Items Define Requirements Statements of Work Engineering Drawings Decide on a Source Selection Plan Cost Cost Technical Technical Go-NoGo Go-NoGo Pre-qualified Bidders Pre-qualified Bidders Develop a Bid List Procure Long Lead Items

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Defining Requirements –Current Status Undulator Strongbacks Drawings-Released Statement of Work-Released Undulator Magnet Poles Drawing-Released Statement of Work-Released Undulator Magnets Drawing-Released Statement of Work - Routed for Signatures Undulator Strongbacks Drawings-Released Statement of Work-Released Undulator Magnet Poles Drawing-Released Statement of Work-Released Undulator Magnets Drawing-Released Statement of Work - Routed for Signatures

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Statements of Work Combined Business Requirements and Technical Requirements Business Requirements Delivery Schedule Planning Requirements Reporting Requirements Communication Requirements Shipping Requirements Technical Requirements Enhancement of Drawing Requirements Technical Requirements too Detailed for a Drawing Testing Requirements Certification Requirements Combined Business Requirements and Technical Requirements Business Requirements Delivery Schedule Planning Requirements Reporting Requirements Communication Requirements Shipping Requirements Technical Requirements Enhancement of Drawing Requirements Technical Requirements too Detailed for a Drawing Testing Requirements Certification Requirements

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Statement of Work - Initial Sections Introduction -Section 1.0 The Introduction gives a brief view of the LCLS Project Scope -Section 2.0 Scope of Work Section 2.1 How the current procurement fits into the LCLS Project Delivery -Section 2.2 Defines the scope in time for fulfilling the procurement of each item First Article -Section 2.3 Defines the requirement for a “First Article” in the scope of the procurement Introduction -Section 1.0 The Introduction gives a brief view of the LCLS Project Scope -Section 2.0 Scope of Work Section 2.1 How the current procurement fits into the LCLS Project Delivery -Section 2.2 Defines the scope in time for fulfilling the procurement of each item First Article -Section 2.3 Defines the requirement for a “First Article” in the scope of the procurement

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Statement of Work - Technical Requirements Typical Technical Requirements in Section 4.1 Material Requirements Special Processes -Annealing Special Properties –Magnetic Requirements Marking for Identification Packaging Requirements Typical Technical Requirements in Section 4.5 Testing and Measurements Data Reporting Additional Technical Documents in Section 3.0 Drawings Laboratory Technical Specifications National Technical Specifications and Standards Typical Technical Requirements in Section 4.1 Material Requirements Special Processes -Annealing Special Properties –Magnetic Requirements Marking for Identification Packaging Requirements Typical Technical Requirements in Section 4.5 Testing and Measurements Data Reporting Additional Technical Documents in Section 3.0 Drawings Laboratory Technical Specifications National Technical Specifications and Standards

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Statement of Work –Business Requirements Typical Business Requirements – Sections Program Plan Program Meetings Program Schedule Typical Business Requirements – Sections 4.6 – 4.9 Special tooling Quality Control First Article Inspection Contractor Proposed Changes Proprietary Designs and Processes Inspection and Test Plan Quality Assurance Quality Verification Program Typical Business Requirements – Sections Program Plan Program Meetings Program Schedule Typical Business Requirements – Sections 4.6 – 4.9 Special tooling Quality Control First Article Inspection Contractor Proposed Changes Proprietary Designs and Processes Inspection and Test Plan Quality Assurance Quality Verification Program

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Statement of Work –Business Requirements Typical Business Requirements – Sections 4.10 –4.15 Source Inspection Testing Surveillance Test Failures Red Flag Notice Nonconformance Reporting Approvals Reports, Data and Deliverables – Section 5.0 Progress Reports Technical Data Delivery Other Special Considerations – Section 6.0 Sub-contractors, Publications, etc Typical Business Requirements – Sections 4.10 –4.15 Source Inspection Testing Surveillance Test Failures Red Flag Notice Nonconformance Reporting Approvals Reports, Data and Deliverables – Section 5.0 Progress Reports Technical Data Delivery Other Special Considerations – Section 6.0 Sub-contractors, Publications, etc

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Source Selection Best Price Selection Does not Evaluate Vendor Capabilities thus Introduces Risk Best Technical Proposal Selection Weighed Evaluation of Technical Proposals Introduces Subjective Judgments Insufficient Technical Complexity to Warrant Required Effort Go-NoGo Selection Vendors Submit Qualifications with Bid on Specified Criteria Vendor Responses judged “Go” or “NoGo” One “NoGo” Rating Disqualifies a Vendor Proposal Qualified Vendors’ Bids Compete on Price Best Price Selection Does not Evaluate Vendor Capabilities thus Introduces Risk Best Technical Proposal Selection Weighed Evaluation of Technical Proposals Introduces Subjective Judgments Insufficient Technical Complexity to Warrant Required Effort Go-NoGo Selection Vendors Submit Qualifications with Bid on Specified Criteria Vendor Responses judged “Go” or “NoGo” One “NoGo” Rating Disqualifies a Vendor Proposal Qualified Vendors’ Bids Compete on Price

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Source Selection Pre-qualified Vendor Selection Assess Potential Vendors with Specific Selection Criteria Use Plant Visits to Clarify Vendor Capabilities Offer Bid Package Only to Pre-Qualified Bidders Bids Compete on Price Similar to “GO-NoGo” Selection Pre-qualified Vendor Selection Assess Potential Vendors with Specific Selection Criteria Use Plant Visits to Clarify Vendor Capabilities Offer Bid Package Only to Pre-Qualified Bidders Bids Compete on Price Similar to “GO-NoGo” Selection

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Developing Bid Lists Look at Current ANL Vendors Look for Vendors Recommended by Other National Laboratories Search Internet for Vendors with Required Expertise Advertise in FedBizOpps and Let Vendors Express Interest Cull List for Best Potential Vendors Proceed with Vendor Prequalification Look at Current ANL Vendors Look for Vendors Recommended by Other National Laboratories Search Internet for Vendors with Required Expertise Advertise in FedBizOpps and Let Vendors Express Interest Cull List for Best Potential Vendors Proceed with Vendor Prequalification

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Procurement Request for Proposals Will be Sent to Pre-qualified Vendors Documentation will include: Drawings Statement of Work Any Special Documents Such As: Special Bid Instructions Interested Sub-Contractor Lists Proposals Must Comply With All Requirements to be Considered Valid Contract will be awarded to the Vendor with the Best Priced Valid Proposal Request for Proposals Will be Sent to Pre-qualified Vendors Documentation will include: Drawings Statement of Work Any Special Documents Such As: Special Bid Instructions Interested Sub-Contractor Lists Proposals Must Comply With All Requirements to be Considered Valid Contract will be awarded to the Vendor with the Best Priced Valid Proposal

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Quality Assurance What is Quality Meeting Requirements Define Requirements Provide Proper Tools Who is Responsible for Quality We are, and Everyone Involved in the Process How does Quality Assurance Apply Control of Drawings via Checking, Review & Release Control of Documents (SOW) Via Review & Release Vendor Selection CapacityTools Quality Management System What is Quality Meeting Requirements Define Requirements Provide Proper Tools Who is Responsible for Quality We are, and Everyone Involved in the Process How does Quality Assurance Apply Control of Drawings via Checking, Review & Release Control of Documents (SOW) Via Review & Release Vendor Selection CapacityTools Quality Management System

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Vendor Quality Monitoring Required Plans Program Plan & Schedule Inspection and Test Plan Quality Verification Plan Required Reports and Other Written Communications Monthly Progress Reports Red Flag Notices Red Flag Notices Nonconformance Reports Program Meeting Minutes Required Plans Program Plan & Schedule Inspection and Test Plan Quality Verification Plan Required Reports and Other Written Communications Monthly Progress Reports Red Flag Notices Red Flag Notices Nonconformance Reports Program Meeting Minutes

Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Design Review Glen Lawrence, ANL Vendor Quality Monitoring Required Documentation Test & Measurement Data Certifications Direct Monitoring Program Meetings At ANL At Vendor Plant Witness Testing First Article Inspection Post Delivery Inspection and Testing Required Documentation Test & Measurement Data Certifications Direct Monitoring Program Meetings At ANL At Vendor Plant Witness Testing First Article Inspection Post Delivery Inspection and Testing