April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.

Slides:



Advertisements
Similar presentations
Module 3 Configuring Hardware on a Computer Running Windows XP Professional.
Advertisements

SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
FIU Chapter 7: Input/Output Jerome Crooks Panyawat Chiamprasert
DriveAP 1.2 & 2.1 DriveWare®.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
VME readout fro TOF MICE Tracker Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
TOF Front End electronics
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
M. Bonesini DAQ Meeting1 M. Bonesini INFN Milano Some Considerations for MICE TOF Stations FE electronics (mainly TOF0)
Chapter 1: IntroductionDhamdhere: Operating Systems— A Concept-Based Approach Slide No: 1 Copyright ©2005 Overview of Operating Systems Chapters 1 and.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
Input and Output Computer Organization and Assembly Language: Module 9.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
E906/Drell-Yan: Monte Carlo, Data Acquisition and Data Analysis Paul E. Reimer Expected Rates and Monte Carlo (WBS 2.5.1) Data Acquisition (WBS 2.4) –CODA.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
1 MICE Status UKNF Meeting 3rd May 2006 Malcolm Ellis.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
Multistep Runs with ROD Crate DAQ Murrough Landon, QMUL Outline: Overview Implementation Comparison with existing setup Readout Status ModuleServices API.
Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
ZPD Project Overview B A B AR L1 DCT Upgrade FDR Masahiro Morii Harvard University Design Overview Progress and Changes since CDR Current Status Plans.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Online Monitoring System at KLOE Alessandra Doria INFN - Napoli for the KLOE collaboration CHEP 2000 Padova, 7-11 February 2000 NAPOLI.
LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL.
Input Output Techniques Programmed Interrupt driven Direct Memory Access (DMA)
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
David Lawrence JLab May 11, /11/101Reconstruction Framework -- GlueX Collab. meeting -- D. Lawrence.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Jean-Sebastien Graulich, Geneva
Tracker Software Status
DAQ Software Support for PSEC at ANL and MTEST
Plans for the 2004 CSC Beam Test
Presentation transcript:

April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done

April 2006Jean-Sébastien GraulichSlide 2 Goal for BTF  Stand alone, local DAQ DAQ Reduced to minimum: Local Start/Stop of Runs (no remote Run Control -> no DAQ framework, no event building) Write data on local Disk Readout particle per particle No interrupts  VME-PCI interface: CAEN V2718 only  Limited number of FEE modules supported TDC V1290 QDC V972  Only 2 Event types: Particle Event Calibration Event

April 2006Jean-Sébastien GraulichSlide 3 Status  Manpower: me and 1 undergraduate student  Software for V2718: 80% done All fundamentals are done: Read and Write in A32/D32,D16 Read in BLT32, BLT64 Basic I/O Register (2 Inputs, 5 Outputs)  Software for V1290: 80% done Only tested with V1190, should be easily transported to V1290 Not fully commissioned yet  Software for V792: 40% done Work in progress  Software for run control: 25% done Working on User interface

April 2006Jean-Sébastien GraulichSlide 4 First results  Readout rate of V Mbytes/sec in BLT64 -> 5 ms to read the full V1190 buffer memory (Readout of the tracker would require at least 40 Mbytes/sec… already obtained with BIT3 interface -> we might have to deal with 2 different interface. No impact for BTF)

April 2006Jean-Sébastien GraulichSlide 5 To be done  I need some inputs Define needs for calibration Define needs for online monitoring Define needs for other FEE modules  Tests of QDC FEE options will start in background  Organize transport of my PC… When is the test beam ?