New Construction. Manufacturer’s Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.

Slides:



Advertisements
Similar presentations
Installation Presentation
Advertisements

Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Remodel / Resurface. Manufacturers Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.
Engineered Wood Products
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Horticulture CD Unit C3-5: Nursery, Landscaping, and Gardening.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Competency: Draw Wall Sections
Miscellaneous Details. u May have special or unusual conditions –inside or outside structure u Approach same as before –analysis of how specific detail.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
PowerPoint Presentation
Hardware Identification By:Gord Darling Construction technology.
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Chapter 7 Metals.
Building with PolySteel. #1Footings Install standard (level) footings with rebar placed at the intervals required by your building design, as outlined.
Remodel / Resurface. Manufacturer’s Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
What have we accomplished? STRENGTH OF MATERIALS
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Lumber Section II. Lumber Structural Strength Depends on species and grade, and the direction in which the load is acting with respect to grain of the.
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
Building Types.
DECKS. Square Corner Framing square Square Corner triangle.
How to build raised garden beds for small space gardening How to build a raised garden bed, which tools, material and skills needed. How much does it cost.
Manufacturer’s Recommendations
Installation Presentation
Constructing Homes and Other Buildings
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Intro to Concrete 18.0 & 19.0 Class notes.
Chapter 35 Section Layout.
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Garden Sheds. Agenda Overview – Next level – good example to teach construction skills – Includes layout skills – transferable to other projects – Orientation.
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Competency: Draw wall sections and details
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
Building a Deck. What must my Deck be built of??  All lumber used must be southern pine grade #2 or better  Lumber grades are bases off of the number.
HOME BUILDING PART 1 Floor Framing. Floor Frame  Now that you have a foundation, it’s time to build on it.  This type of construction is for stem-wall.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
How to Build a Divider Wall By Charysse Roberson.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
TABS II Contractor Installation CD. TABS II Before getting started, please read & familiarize yourself with the Tabs Wall Systems Estimating & Installation.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
Drafting 2 (Arch) Quiz Review #5
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Installation Walkthrough Image Guide
Foundation – jay Desai.
Commercial Floor Systems
Competency: Draw wall sections and details
Competency: Draw Wall Sections
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. a. Identify various types of nails and cite uses.
PPT PROCEDURES TO INSTALL PAVERS
Competency: Draw wall sections and details.
Cast in Place 2 way Flat slabs Basically joists in both directions
Wood structures Topic 3 Floor Framing
Structural Drawing Chapter 19.
Competency: Draw wall sections and details
Wood Frame Construction
Commercial Floor Systems
Commercial Floor Systems
Competency: Draw Wall Sections
Building Materials.
Presentation transcript:

New Construction

Manufacturer’s Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified person inspect all footings and joists. (See for checklist.) CAUTION: Make sure the ledger board is bolted or all- thread bolted all the way through the box beam on house. The manufacturer recommends footings 6 ft. on center and floor joists 16 in. on center. Conditions vary by locality always consult your local building department.

New Construction

Add 1½” for Silca Grate TM thickness. Determine Thickness of Deck Material

New Construction Establish finished floor elevation. - Allow for existing constraints such as doorway thresholds. Make plan of layout and pattern of deck materials (ie. Natural stone or brick pavers). Preparation

New Construction Silca Grate TM Orientation Before placing Silca Grate TM on deck joists be sure reinforcement straps face down. NO YES

New Construction Paver fascia Paver fascia Fascia board End of Joist (Front) View Rim Joist Fascia Natural stone or brick pavers. Composite fascia material. Pressure treated wood, cedar, redwood. Wrap with aluminum or vinyl.

New Construction Deck Construction Make plan of layout and pattern of deck materials (ie. natural stone or brick pavers). Build your treated lumber structure to the predetermined elevation (height). Assemble deck using 6’ on center footing (or to local building codes) with joists spaced 16’ on center. 2x8 are acceptable 2x10 are better.

New Construction Silca Grate TM Placement Place Silca Grate TM on deck joists. Staggering grate joints improves overall strength of installation.

New Construction Silca Grate TM Attachment Attach Silca Grate TM to joists using 4 coated #9 3” 6 deck screws.

New Construction Complete Silca Grate TM Installation Install Silca Grate TM over desired area.

New Construction Install Geotextile/Landscape Blanket Install 3.1 oz. non-woven geotextile/landscape blanket over Silca Grates TM if polymeric sand is to be used in construction.

New Construction Test Install for Fit Now is the best time to test install your choice of decking to check for pattern and material fit and trim.

New Construction Complete Installation of Decking Material

New Construction Fill All Joints of Decking Material with Polymeric Sand* *See next page for polymeric sand application tips.

New Construction Polymeric Sand Application Tips Check weather forecast to allow for 12 hours of curing time without precipitation. Pour Polymeric sand into all joints from bag. Use broom to ensure all joints are filled with sand. Excess sand on the surface of the decking material can be removed using a wet/dry vacuum or leaf blower LIGHTLY. Be sure all joints remain filled with sand. Lightly mist polymeric sand and entire deck material surface using a garden hose or mister. Be sure all joints are saturated. Repeat misting 3 times.

New Construction Enjoy Your New Deck!

New Construction Let Us Know… We enjoy receiving pictures and descriptions of your Silca Grate TM installations and your finished decks. We can also always use your feedback and ideas from your installation experience. You can contact us at: