ESS Accelerator Design Upgrade Project Suzanne Gysin Prject Support Officer ESS Accelerator Division 2011-12-09, SLHIPP-1

Slides:



Advertisements
Similar presentations
Thomas Parker, Head of Energy Division Responsible Renewable Recyclable Thomas Parker October 2013.
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
The European Spallation Source Dave McGinnis Chief Engineer – ESS\Accelerator Division IVEC 2013.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs.
ESS Pre- Operations Dave McGinnis Accelerator Division/RF Group.
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
Project Management Session 7
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
European Spallation Source RF Systems Dave McGinnis RF Group Leader ESS Accelerator Division SLHiPP-1 Meeting 9-December-2011.
IS&T Project Management: How to Engage the Customer September 27, 2005.
Page The High power proton accelerator for the European Spallation Source (ESS) S. Gammino Milano, 9 Marzo
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
The ESS ADU project Mats Lindroos Head of the ESS Accelerator Division Lund,
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
Project UF Practical management of projects Randy Graff, PhD.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Project UF Practical management of projects Randy Graff, PhD.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Response to ESS Accelerator Technical Advisory Committee April 2014 Recommendations 5 November 2014 Dave McGinnis.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Anders Sunesson RF Group ESS Accelerator Division
The European Spallation Source Control System
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
Welcome Mats Lindroos Head of the ESS Accelerator Division EPG 5/12/2011.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
ESS Accelerator| Construction Phase| | MC | 1 ESS Accelerator management & governance for Product Integration - Construction phase 25 January 2013.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Status of the French-Swedish Cooperation Agreement 10 th Oct, 2012 Christine Darve.
AD retreat Accelerator 2012 December Mats Lindroos, David McGinnis, Suzanne Gysin, Jörgen Andersson and Steve Peggs.
Making Difficult Decisions in a Transparent Way –
WP5 Elliptical cavities
Uppsala Commitment to ESS and FREIA Planning
Overview and System Design for ESS LLRF Systems
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
ESS RF Development at Uppsala University
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Neutron Detector Systems at ESS
Implications of HOMs on Beam Dynamics at ESS
PMI-SVC Scheduling Forum
Managing Parameters Karin Rathsman
RF systems introduction
Ciprian Plostinar Workshop on Testing and Commissioning
Introduction CDR Normal Conducting Linac LLRF
European Spallation Source ERIC
RF introduction Anders Sunesson RF group leader
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Presentation transcript:

ESS Accelerator Design Upgrade Project Suzanne Gysin Prject Support Officer ESS Accelerator Division , SLHIPP-1

Overview ESS is a long-pulse neutron spallation source The target is feed by a superconducting 5 MW proton linac – Pulse Length = 2.9 mS – Pulse Rate = 14 Hz – Beam Current = 50 mA – Energy = 2.5 GeV

What is 5 MegaWatts? At 5 MegaWatts, – one beam pulse has the same energy as a 16 lb (7.2kg) shot traveling at – 1100 km/hour – Mach 0.93 Has the same energy as a 1000kg car traveling at 96 km/hour Happens 14 x per second – You boil 1000 kg of ice in 83 seconds A ton of tea!!!

ESS is being built by a multi- national collaboration Accelerator collaboration NC linac: Ion source (INFN), RFQ (CEA), MEBT (Bilbao), DTL (INFN) SC linac: Spoke Cavities (CNRS), Elliptical cavities (CEA) High Energy Beam Transport: Aarhus university (Denmark) RF sources: High-power (Uppsala U), RF regulation, LLRF (Lund U) Utilities: power, network, cooling, etc (Tekniker)

Cost

Funding Strategy ESS AB is a Swedish public limited company (rather than a research laboratory) Sweden, Denmark & Norway cover 50% of cost The other 14 member states covers the rest, with the European Investment Bank

Sustainable Energy Concept Renewable Carbon dioxide: -120,000 ton/y Responsible Carbon dioxide: -30,000 ton/y Recyclable Carbon dioxide: -15,000 ton/y

ESS in a nutshell 3 Systems: – Linac – Target – Instruments ~ 1.5 Bio Euro’s Construction starts 2013 First Neutron 2019 Operation 2025

ESS programme schedule ADU

ESS Project Strategy TDRs with cost and Schedule International convention signed Design Updates Construction projects First protons P2B projects Cryomodule production starts P2B assures a stringent project framework for prototyping the design choices in the technical design a continuous transition from design to construction and keeps the collaborations intact through the construction decision process First neutrons DU P2B Const. P2B Const. P2B

Making the trains run on time at ESS ESS is using the Project Management tools for its Design Update : a large project with diverse and international contributors and funding sources. We must be: - efficient with our resources -accountable to our funding agencies - on time for all who are dependent on us.

Accelerator Design Update (ADU) Project Size 1.5 calendar year (EOY 2012) hours € (Materials only) ~ people 7 organizations Deliverables Technical Design Report Costing estimate (20%) Construction plan IPHI RFQ at CEA-Saclay SC 5 cell cavity for 704 MHz, CEA and CNRS SC single spoke cavity, IPNO (CNRS)

Accelerator Design Update

Project Management Tools Scope Management Schedule Managment Communication Plan Risk Analysis Cost Management Earned Value Management (EVM)

Planning Process for ESS DU and P2B projectsSub-ProjectWPSub-Projects Create high level WBS Create Milestone Plan Create detailed WBS Estimate tasks (work) Define logic Compile budget Compile time phased budget Analyze Risks Iterate plans Create Project Specifications Define resources Decomposition High level task Detailed tasks MSMS Estimate = ( Optimistic + 4 x Most Likely + Pessimistic ) 6 Sub- Project Charter Objectives High level Deliverables Define and Categorize Deliverables

ADU Project Plan 1139 lines, ~350 deliverables

Communication Technical Board – Decision making body for ADU and P2B – Meets every month. – Forum to discuss technical issues and project status – Published agenda regular agenda items Project Group Leader’s meeting – Meets weekly in Lund – Discusses project issues – Notes are distributed to all WPL’s

WPWP leaderStat us 1. ManagementMats LindroosG 2. Acc. ScienceSteve PeggsG 3. IntegrationPeter RådahlR 4. SCRF SpokeSebastien Bousson G 5. SCRF EllipticalGuillaume Devanz Y 6. NC Front-endSanto GamminoY 7. HEBTSøren Pape- Møller G 8. RF systemsRoger RuberY Reporting and tracking Each Work Package Leader submits every month 1.a status report and presents it at the Technical Board meeting. 2. progress on project plan tasks. Compile overall status. AD reports once a quarter to the ESS Project Office

Quarterly Risk Analysis ESS has started to use formal Risk Analysis for construction and the design upgrade project. 1.Collect risks from Work Package Leaders (using a template) 2.Agree on the goal and assumption 3.Review the risks and select only risks relative to the agreed goal 4.Assign a probablility and impact rating to each risk (0-5) 5.Multiply the probability and impact and sort ascending order 6.Review the resulting top 5 risks 7.Select a mitigation strategy 8.Track the progress of the mitigation 9.Repeat every quarter 10.(do not recycle the risks from last quarter)

Content Management System Version Control Workflows Relevant Links Document repository Alfresco hosted by IDOM in Spain Moving to Enovia Integrated with CATIA (CAD system) Activity Log Recently changed documents

Thanks for your time

t0