1 Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
FREIA Facility for Research Instrumentation and Accelerator Development Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University

2 The European Spallation Source
29-Sep-2011 Roger Ruber - FREIA Test Facility

3 The European Spallation Source (ESS)
Lund, Sweden, next to MAX-IV 5 MW pulsed neutron source 14 Hz rep. rate, 4% duty factor >95% reliability for user time Cost estimates (2008 prices) 1,5 G€ / 10 years Time frame: 2 years design update (TDR) (overlap with 5y prepare-to-build) 5 years construction first neutrons 2019 High intensity allows studies of complex materials, weak signals, time dependent phenomena 29-Sep-2011 Roger Ruber - FREIA Test Facility

4 ESS Cost Estimates Investment: 1478 M€ / ~10y Operations: 89 M€ / y
Decomm. : 346 M€ (Prices per ) 29-Sep-2011 Roger Ruber - FREIA Test Facility

5 International Collaboration
Sweden, Denmark and Norway covers 50% of cost 17 Partners today The remaining ESS members states together with EIB cover the rest! 29-Sep-2011 Roger Ruber - FREIA Test Facility

6 ESS Layout and Energy Usage
Artists Impression ESS Layout and Energy Usage Klystrons ~30 MW Liquifiers 69 GWh/y Ion source 7 GWh/y Instruments 5 GWh/y Accelerator 123 GWh/y Target station 11 GWh/y 29-Sep-2011 Roger Ruber - FREIA Test Facility

7 Sustainable Energy Management
Responsible Renewable Goal: carbon neutral Recyclable 29-Sep-2011 Roger Ruber - FREIA Test Facility

8 The Master Schedule 29-Sep-2011 Roger Ruber - FREIA Test Facility

9 The Accelerator single pass linear proton accelerator
5 MW p+: 50 mA, 2.5 GeV, 14 Hz, 2.86 ms < 1 W/m losses 95% user beam time reliability normal conducting (room temperature) electron cyclotron resonance (ECR) source radio-frequency quadrupole (RFQ) drift tube linac superconducting (liquid helium temperature) double spoke resonators (DSR) elliptical cavities © CERN CDS 29-Sep-2011 Roger Ruber - FREIA Test Facility 9

10 RF Generation and Distribution System
200 cavities ( MHz) 200 RF systems: modulator, klystron, distribution, controls 5 MW beam → 20 MW RF, (losses and LLRF overhead) R&D objectives energy efficiency and operational costs reductions produce technical design, with cost estimate, to start tendering 29-Sep-2011 Roger Ruber - FREIA Test Facility 10

11 Test Stand Objectives Prototype baseline design and acceptance testing of production elements ion source RFQ, bunchers, DTLs, spokes and elliptical cavities power couplers, tuners, cryo-modules RF system including power sources, distribution and controls (LLRF) 200 Accelerating structures and RF distribution points minor fault might create a major risk must ensure low beam loss operation to prevent activation of accelerator components major part of the accelerator budget must be cost, energy and resource effective for construction & operation Training of future staff prototyping moved to 5 years P2B (in parallel to 2 years ADU) 29-Sep-2011 Roger Ruber - FREIA Test Facility

12 Examples of Issues to be Addressed
High losses in the linac Action: Comprehensive studies of beam dynamics (simulations and theory) Poor reproducibility in cavity performance Action: Quality control during manufacturing and prototyping of a sufficient large number of cavities Limits in cavity performance due to field emission Action: Comprehensive design studies, prototyping and comprehensive tests of cavities and complete cryomodules Limits in RF system performance Action: Prototyping, sufficient contingency in design Delivery and installation RF system Action: Study alternatives, staging of beam power and energy 29-Sep-2011 Roger Ruber - FREIA Test Facility

13 FREIA Test Facility at Uppsala University 4 Years development phase
prototyping of LLRF and HLRF solutions training of students and staff 4 Years development phase 2011 – 2012: design, tendering 2013 – 2014: commissioning, R&D RF systems (components & concepts) 2015 and beyond: energy efficiency, component testing Hardware: HV pulse modulator 704 MHz klystron (1.5 MW) RF distribution system LLRF system 2 SRF elliptical cavities helium liquefier 29-Sep-2011 Roger Ruber - FREIA Test Facility

14 New Experiment Hall 29-Sep-2011 Roger Ruber - FREIA Test Facility

15 FREIA RF System HV pulse modulator Klystron HLRF distribution LLRF
14 Hz, 3.5 ms Klystron 704 MHz, 1.5 MW peak 2.86 ms pulse HLRF distribution 0, 1, 2 cavities fast vector modulator LLRF RF regulation, cavity tuning 29-Sep-2011 Roger Ruber - FREIA Test Facility

16 FREIA Cryogenic System
Multiple users transport dewar filling horizontal test cryostat future vertical test cryostat Liquid helium ~140 l/h peak load at 4 K ~2000 l storage dewar ~8 g/s, 80 W peak load at 2 K Recovery system 30 m3/h average 50 m3/h peak load (minutes) 29-Sep-2011 Roger Ruber - FREIA Test Facility

17 FREIA Test Cryostat internal volume for 2x 704 MHz cavities (3.5 m x Φ 1.1 m) to test two-cavities-per-klystron concept operation temperature range 1.5 – 2.2 and 4.2 – 4.6 K base on existing designs: CHECHIA, CryoHoLab, HoBiCat or prototype ESS cryostat design? 29-Sep-2011 Roger Ruber - FREIA Test Facility

18 HoBiCaT (HZ Berlin, BESSY)
J. Knobloch et al., HoBiCaT – A test facility for superconducting RF systems, Proc. SRF’03. internal volume 3.5 m x Φ 1.1 m range 1.5 – 2.2 K, 4.2 K stability ±0.1 mbar (1.8K), 1mbar (4.2K) integrated 2K cold box supply: 180 l/h at 4.2 K (Linde TCF50) pumps for 80W at 1.8K LN2 thermal shield cooling 50 l 2K cold box 29-Sep-2011 Roger Ruber - FREIA Test Facility

19 CryHoLab (Orsay, CEA Saclay)
H. Saugnac et al., “CryHoLab”, a new horizontal test cryostat for SCRF cavities, Proc. SRF’99, Santa Fe, New Mexico, USA 29-Sep-2011 Roger Ruber - FREIA Test Facility

20 CHECHIA Cryostat (CEA Saclay, DESY)
P. Clay et al., Cryogenic and electrical test cryostat for instrumented superconductive RF cavities (CHECHIA) Proc. CEC/ICMC’95, Columbus, Ohio, USA (TESTLA-95-21) one horizontal positioned TTF cavity 29-Sep-2011 Roger Ruber - FREIA Test Facility