Presentation is loading. Please wait.

Presentation is loading. Please wait.

recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA

Similar presentations


Presentation on theme: "recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA"— Presentation transcript:

1 recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Orsay 06/05/2014 (updated Feb. 6th, 2015) ACS, Orsay 06/05/2014 Tomas JUNQUERA

2 installation at IncubAlliance : beginning of 2010
History: creation of ACS : July installation at IncubAlliance : beginning of 2010 Cooperation agreement with CNRS - Univ. Paris Sud Orsay: April CNRS agreement for Scientific associates in the board of ACS: April Our expertise: General accelerators and cryogenics systems conceptual studies SC cavities and ancillary equipment design (e.m. and thermo-mechanical) Cryogenic systems detailed studies (thermal and mechanical) Engineering FE studies (structural, EM, RF) Prototyping (follow-up, controls, tests, …) First contracts: CIEMAT Madrid ESS Bilbao GANIL Caen EU-FP7 (MAX) (more …) ACS, Orsay 06/05/2014 Tomas JUNQUERA

3 Technofusion Facility
Contracts Feasibility Study of a Multi-ion Cyclotron for the Technofusion Facility Technical Support for the establishment of Technical Specifications for the TechnoFusion Facility Cyclotron study ACS, Orsay 06/05/2014 Tomas JUNQUERA

4 for the study and construction of the first cryomodule
Contracts 2010 Technical Support contract with the ESS-Bilbao laboratory for the study and construction of the first cryomodule ACS, Orsay 06/05/2014 Tomas JUNQUERA

5 Design of 352 MHz Double-Spoke Resonator (DSR)
Contracts Design of 352 MHz Double-Spoke Resonator (DSR) prototypes Call for Tenders: September 2011 Contract Signature: December 2011 Kick off meeting: Bilbao 19/12/2011 Duration : 6 months Electromagnetic and mechanical design. Specifications of Niobium material Proposals for prototyping and new test facility ACS, Orsay 06/05/2014 Tomas JUNQUERA

6 MYRRHA Accelerator eXperiment, research and development program (MAX)
Contracts 2011 MYRRHA Accelerator eXperiment, research and development program (MAX) Projet Leader: CNRS (IN2P3) Jean Luc Biarrotte Participants: 11 partners (laboratories and industry) Project kick-off: 01/02/2011 Project duration: 36 months Total Budget : € EU Contribution : € ACS, Orsay 06/05/2014 Tomas JUNQUERA

7 MYRRHA Accelerator eXperiment, research and development programme
Contracts 2011 ACS Activities: WP4 (Task 4.1): Analysis of the optimal temperature of the MYRRHA superconducting linac (report: 1/02/2012) WP4 (Task 4.2): Reliability model of an existing accelerator. WP4 (Task 4.4): Preliminary reliability study of the MYRRHA accelerator WP1 (Task 1.3): Preliminary buildings and infrastructures definition → Contributions to Reports in 2013 ACS, Orsay 06/05/2014 Tomas JUNQUERA

8 Technical Support to the MYRRHA project
Contracts 2012 Technical Support to the MYRRHA project (SCK CEN, Mol, Belgium) Preliminary study of the MYRRHA Linac cryogenic systems. Buildings interfaces and installation, cryofluids distribution. Contract signature: 04/2012 Deliverables: 2012 Followed by new contract in 2014: costs and planning studies and preparation of technical reviews ACS, Orsay 06/05/2014 Tomas JUNQUERA

9 Preliminary LINAC Tunnel Dimensions
Preliminary design of MYRRHA Cryogenic distribution, buildings and tunnel 240 m Preliminary LINAC Tunnel Dimensions ACS, Orsay 06/05/2014 Tomas JUNQUERA

10 Superconducting Cavities,
Contract: Sept 2012:University of Uppsala FREIA facility: Design of a Test Cryostat and associated cryogenic systems FREIA facility (cryostat bunker) Test of High Intensity Linear Accelerators components: Superconducting Cavities, RF couplers, RF amplifiers complete cryomodules, Test of spoke cryomodules for the European Spallation Source, to be constructed in Lund, Sweden) will be tested in a final configuration, prior to be installed into the final accelerator ACS, Orsay 06/05/2014 Tomas JUNQUERA

11 Contract (2013-2014): construction follow up and commissioning
Contract ( ): detailed study and preparation of call for tenders Contract ( ): construction follow up and commissioning 2K Tank cooldown 4K mode JT coupler cavity 4K Tank SHe 5K He 250K HXa HXb ACS, Orsay 06/05/2014 Tomas JUNQUERA

12 Construction contractor
Magnetic shield at MecaMagnetics, 16/04/2014 Vacuum test at Sominex, 24/03/2014 Controls and instrumentation Isii-Tech, 22/04/2014 Installation at Uppsala University: August – November 2014 Commissioning tests : December 2014 – January 2015 ACS, Orsay 06/05/2014 Tomas JUNQUERA

13 Electromagnetic analysis
Call No F4E-OFC-433 December 2012 INTEGRATION DESIGN OF DIAGNOSTICS INTO ITER PORTS framework contract (attributed to IDOM Spain in January 2014) 4 years – 4 specific contracts Instituto Fusion Nuclear (Spain) Nuclear analysis Electromagnetic analysis Activity started in Sept. 2014 Culham Centre for Fusion Energy (UK) Remote Handling ACS, Orsay 06/05/2014 Tomas JUNQUERA


Download ppt "recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA"

Similar presentations


Ads by Google