MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
The MICE Target Lara Howlett University of Sheffield.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Acceptance Criteria for the Decay Solenoid Tom Bradshaw Mike Courthold Matthew Hills.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MOM’s report from G.CECCHET (abridged). MOM’s report First half of November we had normal operations with some data taking for Marco, Yordan, Maurizio.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MOM Report. Shield Wall – Gone Before During After 2.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Commissioning needs MICO meeting 30 June 2008 MOM ( Roumen Tsenov)
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
Tracker QA Test Station Status. 29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
MOM Report Galina Vankova RAL, MICE Video Conference.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
MOM Commissioning Requests [Ken mail ] Target: - Timing - Turn-key system for target operation Beam counters: - Remove BC1 - Readout BC2 Electronics: -
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
TC meeting P2 planning wks 3&4 A.Tauro
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Linda Coney MICO June 6, 2011 MICE Online Report.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Plans for this meeting Analysis of DNA setup data + improvements of setup Look into charge readout options of gas detectors (AGET/DREAM chips) Test new.
MICE Target Report Video Conference 29/11/07
Run Coordinator Report for PVDIS (E08-011)
Presentation transcript:

MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly. I believe A.Nichols has approached J. Governs wrt this – I haven’t heard anything yet. The water level appears to keep dropping – I’m assuming that it is being topped up by J.Governs. No evidence of any leaks though? Magnet Chiller controller outside of the MLCR has been fixed to prevent it crashing on a daily basis

MOM Summary MICE HALL Decay Solenoid The New collar was fitted last week, Transfer line vacuum appears to have improved as a result. Scaffold was put up for Linde last week. Servicing due this week. It will be necessary to start cooldown immediately to ensure DS is ready for machine physics. Cryo Compressers Unsure of status of these. Other Work Willie’s team are continuing to drill holes in the steelwork in preparation for the tracker solenoids.

MOM Summary Daresbury Guys came down on the 12 th 13 th Jan. Helped to install Luminosity Monitors in target Synch. Brought replacement component for target PSU Installed new interlock for target frame (will not be functional yet though) – but there is an issue with a return signal to be solved. There is still some issue with TC cabling numbers to the target to be resolved. (Fixed) an issue with the beam-on light on the upper DS Gate (I think it is now permanently off!) IM returned on Mon 18 th Look at return signal on target interlock. Wiring of power to TOF 2. Take a closer look at TC cabling to the target. Anything ELSE?

MOM Summary Luminosity Monitors Paul Soler came down Tue to Fri last week to install LM Cabling pulled through by Daresbury guys Electronics is in the bottom third of rack next to target. One PMT has failed, Paul may be able to get a replacement for machine physics but it doesn’t compromise operation. My understanding is that it may just increase the S/N ratio slightly. DAQ As far as I am aware there is no change - He plans to come 26 th to 31 st of Jan to fix CAMAC. I have requested documentation so that a non-daq expert can plug leads back in.

MOM Summary Lab 7 Helium leak developed in Lab 7, source not yet found. This emptied the cylinder Due to planned power cut in R1, Lab 7 was effectively switched off on Friday 15 th. I believe the plan is to get everything working again in preparation for the trackers moving to the MICE hall. Power Cut The power was cut in the MICE hall on Saturday morning (This was a planned cut to allow the power to be switched to a new distribution board) Unfortunately this also affected the MLCR (not forseen) and several computers were affected The DS vacuums had been previously isolated but without the computers the vacuum pumps on the turret could not be restrarted until Monday.

MOM Summary Running No running planned for January because of shutdown. Machine Physics to run from 2 nd to 14 th February. We have informally requested 5 shifts, formal confirmation and shift dates tbc I have NO plan for User run. What would we like to achieve during this period? Rehersal There will be a rehersal on the afternoon of the 28 th of Jan to ensure that all equipment appears to be functional. Simultaneously Beam Line training will be given to beam line experts This will be preceded by a meeting in the morning (10:30) to determine the ‘Beam Line Expert’ rota

MOM Summary Shift 1: Friday 5th February 16: :00 Shift 2: Sat 6th Feb OR Sun 7th Feb. This has yet TBC by Dean. This could be a 16h shift if we can utilise the time. If we can, then we have got a shift for free! Thanks Dean Shift 3: Mon 8th February 16: :00 Shift 4 & 5: Wed 10th February. This is for the 16h activation run at 2V beamloss. 09:00 - Finish There may be the possibility of additional shifts after the 10th but this is TBC.

MOM Summary NOTE : All TBC! Shift 1: Objectives: Re-establish DAQ and target operations Reset and setup all Detectors (GVA1 / TOF1 & 2/ KL) Re-establish Online Reconstruction Commission Luminosity Monitors (Parasitic) Shift 2 & 3 Commission Luminosity Monitors Calibrate FNAL1 monitor and GVA1 monitor Adams Beamloss vs rate studies

MOM Summary Shift 4 & 5 (16h Combined) Establish Target Operation at Required Beamloss of 2V Ensure all Detectors are Running Run for 16 Hours If target insertion rate is 1 every 2.56 seconds then the total number of actuations in 16h is 22,500. Therefore there will need to be at least 4 calibration runs! (One every 3.5 hours)