Constructing Telescopes in Antarctica John W.V. Storey Image: Tony Travouillon.

Slides:



Advertisements
Similar presentations
Earning Money  What is income and what are 3 possible sources?  Income is money that you have available to you to spend  3 sources: babysitting,
Advertisements

County Road Administration Board Presenters: Mike Hasslbauer Technology Solutions Manager Western States Equipment Company
Virtual Arrival means reduced emission Greening Logistics European Parliament Brussels 28 April 2010 Manager Research and Projects.
Shelley Knuth June 8, 2004 AWS Annual Meeting An Analysis of Surface Wind Speeds at Dome C, Antarctica C. Meyer and J.W.V. Storey School of Physics/Univ.
Super Seeing from the AAT Peter Gillingham 26 th March 2003.
PILOT—Pathfinder for an International Large Optical Telescope John Storey With Jon Lawrence, Michael Ashley and Michael Burton Image: John Storey.
Deployment, logistics and systems engineering. PILOT Design Study Main functions of conceptual design study for PILOT for feasibility, costing and risk.
The Post- Copenhagen Food Challenge Mark Barthel Special Adviser WRAP 27 January 2010.
Alistair Murdoch Key Account Manager Finning UK Ltd.
CONCORDIA Logistics issues JB. Daban (LUAN) Thanks to Eric Fossat (LUAN) and Chiara Montanari (PNRA)
Turbulence and Seeing measurements at Dome C A collaboration UNSW, CTIO and the University of Nice.
GENS4001-X1Observing the Universe / Antarctic Astronomy 1 Lecture 4: Observing the Universe and Astronomy in Antarctica Dr Michael Burton.
A Voyage To Antarctica Grade 6 Created by: Miss Adrianne Shultis.
Dynamics of a car/airplane and fuel economy. Energy in Transportation All transportation systems need energy to –accelerate up to speed. –Make up for.
Antarctic Logistics Blue Ribbon Panel Site Visit to USAP Port Hueneme Facility Monday, 26 March 2012 Visit team: Norm Augustine, Chair, BRP Kelly Falkner,
CONSTRUCTION BLUEPRINT READING
Calculating Gross Earnings with Differing Methods of Compensation.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
Geometric & Pavement Design Example Problems
Tour of Antarctica! Mrs. Swanson 2 nd grade Spring 2005.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
Road Trip! Holidays are almost here. Your family has decided to go on a road trip for two weeks and are letting you decide where you will go! You will.
CEO Guide to Controlling CFOs, Controllers and other Accounting Department Misfits.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Radiation & Telescopes ____________ radiation: Transmission of energy through space without physical connection through varying electric and magnetic fields.
Emergency Equipment Use Invoice Common Errors 1. Time Under Hire Per the IIBMH: “The time under hire shall start at the time the resource begins traveling.
Week 3 Sr. Design. Important Things we Know You will be doing heavy haulage by Barge on the Yukon River for $5 per tonne to Nennana – There will be no.
Special Session 2 April 12,13 Topics Section 10.7 Intro to Ch 11 (11.1 – 11.2) Aggregate Planning Section 11.3 Intro to MRP Section 11.4.
1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 8 Accounting for Inventory.
Lecture 2 Introduction to Earthmoving
U.S. Antarctic Program Resupply Perspectives Brian Stone Antarctic Infrastructure & Logistics.
Whitelaw & Pearson The Costs of Increasing a Basic Shrimp Vessel from 65 to 85 FEET A Case Study.
May 25th, 2013ProEfficiency - Egomotion ProEfficiency Concept E-gomotion 2013 Team: The talent challenge in electro mobility…
Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.
Dumont d’Urville Concordia Station Dome C Mario Zucchelli Station Baia Terra Nova McMurdo Mid Point D-85 D-10 C-3 Concordia Station.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 7: Present Worth Analysis Dave Ludwick Dept. of Mechanical Engineering University.
Transport and handling at CERN for FAIR
By Kyle bentler Construction worker. Why I chosed this job Its outside Get to run equipment Meet different people.
Polar prediction services provided by the Bureau of Meteorology in support of the Australian Antarctic program. Dr Neil Adams, Centre for Australian Weather.
SIRTF and SOFIA Spaced out, or simply on a higher plane? John Storey UNSW.
Costco RTV. How long have you been at Costco? 19 years.
FLOODS.
Telescopes. Light Hitting a Telescope Mirror huge mirror near a star * * * small mirror far from 2 stars In the second case (reality), light rays from.
MTWTHFS Week of 9/ Week of 9/ Straight Time Pay? Overtime Pay? Double Time Pay? Gross Pay?
Floods Chapter 17 Sections 2 & 3 Pages Chapter 17 Sections 2 & 3 Pages
Commercial Obligations Community Obligations Integrity Innovation Accountability Collaboration Individual Community Business Infrastructure Energy & Resources.
Supplying the best to those who expect the best Presentation to Savunma Sanayii Müsteşarhiği February 2010.
Antarctic astronomy Emeritus Professor John Storey Image: John Storey.
Telescopes Telescopes only have a few jobs: 1)Point to a particular point on the sky 2)Collect lots of light and focus it onto a detector 3)Follow the.
Why should the Sydney Harbour Bridge be inscribed to the UNESCO World Heritage List ? It is an important part of Sydney It has lots of history to it The.
Garvey School District Financial Update April 19, 2012.
“RUST TO MACHINES YOU CAN TRUST” Entrant: Grafton Quarry – Boral Awards: IQA Submission Category: ‘Sandvik Best Technical Paper Award’ By BRAD DOYLE.
FEBRUARY DO YOU KNOW HOW TO WOW? Strider the walk to school mascot.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Telescopes. Light Hitting a Telescope Mirror huge mirror near a star * * small mirror far from a star In the second case (reality), light rays from any.
+ Budgeted Hourly Rates Creating your own cost centers and BHRs.
The Transportation Logistics Company Indiana Logistics Summit Infrastructure Needs and Opportunities September 26, 2007.
HFT 2401 Chapter 10 - Inventory. Inventory  Goods that a firm holds for resale to its guests  As a percentage of total assets, it should be low for.
1 1 Modeling Inventory (Deterministic View) John H. Vande Vate Spring 2008.
CALCULATING GROSS EARNINGS WITH DIFFERING METHODS OF COMPENSATION.
Construction of the Antarctic 10-m THz Telescope
Presentation Heading Subheading.
Chapter 22 Exploring Space
Time Entry.
HFT 2401 Chapter 10 Inventory.
Integration & Commissioning
PASSIONATE ABOUT YOUR PRODUCT AVAILABILITY
MATH UNIT #7 Measurement
Instruments Shielding Project Installation
Chapter 2 Vocabulary Words.
Presentation transcript:

Constructing Telescopes in Antarctica John W.V. Storey Image: Tony Travouillon

Getting the components there, building the telescope, and operating it. Image: John Storey

Davis Mawson Casey Hobart Dome C is a French/Italian station that will be open year-round from 2005 Dome C Image: Australian Antarctic Division

Logistic support of Dome C is via Hobart. Image: John Storey

L’Astrolabe brings heavy items from Hobart to Dumont d’Urville in 6 days... Image: John Storey

...thence by tractor-traverse to Dome C. Image: Patrik Kaufmann

The tractor-traverse takes 11 days to get from the coast to Dome C. Three traverses/year (currently) Each traverse delivers ~150 tonnes Fuel consumption 600 litres/tonne Twelve-metre sleds – essentially no size or weight restrictions

Image: Australian Antarctic Division From 2005, the Australian Antarctic Division air-link will be in place. Dome C 3.9 hrs

The AASTINO was assembled by 3 people in 10 hours, at -30C.

Image: Patrik Kaufmann Let’s assume that things take twice at long at Dome C...

Image: Geanpiero Venturi...because some people just can’t resist goofing off.

Image: Karim Agabi

Image: Patrik Kaufmann

Image: John Storey

Image: EOST EOST estimate for construction times (temperate site) for 2-metre telescope. Mech Eng3 – 4 weeks Mech Tech2 – 3 weeks Elec Eng2 weeks Optical Eng1 week SW Eng2 week Total (worst case): 14 person-weeks 6 weeks elapsed time 5 personnel

Image: EOST Let’s double these times (to account for the goofing off). Total (worst case): 28 person-weeks 12 weeks elapsed time 5 personnel This represents less than the combined UNSW and University of Nice deployment at Dome C for a single summer.

Construction costs Image: John Storey

What did it cost us to build the AASTINO at Dome C, and what would it have cost if we’d done it at Siding Spring?

Dome C (actual costs)$ Road transport, Sydney – Hobart, 4 tonnes (includes separate “dangerous goods” shipping)5185 Return airfare Sydney – Hobart, three $5001,860 Accommodation in Hobart, 2 nights x 3 people720 Hire of bulldozer, 8 hrs 0 Hire of crane, 2 x 1/2 day0 Connection to power grid0 Hire of three 2-way radios, 4 weeks 0 Hire of container during construction0 Jet A1 fuel; 2,300 litres Total Dome C$7,765 Siding Spring (estimated costs based on quotes)$ Road transport, Sydney – SSO, 4 tonnes2,000 Hire of car, 4 $300/week1,200 Accommodation at Lodge, 28 nights x 3 $ ,593 Hire of bulldozer, 8 $150/hr1,200 Hire of crane, 2 x 1/2 $900 per 1/2 day1,800 Connection to power grid (including pole)950 Hire of three 2-way radios, 4 weeks 300 Hire of container during construction2,500 Jet A1 fuel; 2,300 litres2, Total Siding Spring$20,843

PILOT: Pathfinder for an International Large Optical Telescope

Image: Patrik Kaufmann For PILOT (15 tonnes gross weight), let’s ignore the possible savings, take the worst case and double it, and assume we have to pay for all the transport...

We’ll pay for our share of the icebreaker charter, and our share of its operating costs... Image: John Storey

...we’ll pay for our share of the tractor-traverse to Dome C. Image: Patrik Kaufmann

Then that all comes to % of an Astrolabe voyage, plus 10% of a traverse... = A$54k....plus GST

Of course, there are also the violent storms that dump metres of snow in just a few hours......but fortunately they only occur on Mauna Kea. (Image courtesy Keck Observatory)