MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.

Slides:



Advertisements
Similar presentations
(Systems Analysis INTerface Board)
Advertisements

MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
In this presentation you will:
Motherboard Further Information Click on the image for details about each component.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
Target Status Report Lara Howlett University of Sheffield.
The MICE target and the ISIS BPS system By Edward Overton 1.
PH4705 ET4305 Interface Standards A number of standard digital data interfaces are used in measurement systems to connect instruments and computers for.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009.
MICE Target Electronics & DAQ Update P J Smith University of Sheffield 2 nd December 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Electronics & DAQ P J Smith University of Sheffield.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Interrupts (contd..) Multiple I/O devices may be connected to the processor and the memory via a bus. Some or all of these devices may be capable of generating.
Handheld TFTP Server with USB Andrew Pangborn Michael Nusinov RIT Computer Engineering – CE Design 03/20/2008.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
1 Design For Debug Using DAFCA system Gadi Glikberg 15/6/06.
Basic Input/Output Operations
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Target Online Software J. Leaver 01/12/ /06/2015Imperial College 2 Target Controller Software Software for Stage 1 upgrade nearing completion –Hardware.
Target Control Electronics Upgrade 08/01/2009 J. Leaver P. Smith.
USB Mass-Storage Implementation on an Embedded System (D0113) Supervisor: Dimitry Sokolik Performed by: Yoav Gershoni Shachar Faigenblat Final Presentation.
Target Electronics 27 th November Overview Current System is composed of many discrete units with separate processors that do not talk to each other.
Click to add text Introduction to z/OS Basics © 2006 IBM Corporation Chapter 15: WebSphere MQ.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Check Disk. Disk Defragmenter Using Disk Defragmenter Effectively Run Disk Defragmenter when the computer will receive the least usage. Educate users.
Computer Hardware The Basics. Overview Why is this important? To be able to recognize each of the main parts of a computer As a professional in digital.
TUSB3210 Product Overview.
Chapter 8 Input/Output. Busses l Group of electrical conductors suitable for carrying computer signals from one location to another l Each conductor in.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
COMP201 Computer Systems Exceptions and Interrupts.
AS Computing F451 F451 Data Transmission. What data is transmitted? Phone SMS Radio TV Internet.
12/09/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Input/OUTPUT [I/O Module structure].
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
1 Computer System Overview Chapter 1. 2 n An Operating System makes the computing power available to users by controlling the hardware n Let us review.
1 Lecture 20: I/O n I/O hardware n I/O structure n communication with controllers n device interrupts n device drivers n streams.
I/O Example: Disk Drives To access data: — seek: position head over the proper track (8 to 20 ms. avg.) — rotational latency: wait for desired sector (.5.
GBT Interface Card for a Linux Computer Carson Teale 1.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
Input/Output 2 What is I/O? How we get the CPU to communicate with devices From the computer’s point of view, it’s just 1’s and 0’s Gets interpreted.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Designing An Electronic Trigger For A Paintball Marker To Allow User Selectable Firing Rates Team WTR.
SEABAS DAQ development for T3MAPS Readout Abhijeet Sohni (with – Max Golub, Raymond Mui and Sean Zhu) Fall Quarter 2014.
CHAPTER 4 The Central Processing Unit. Chapter Overview Microprocessors Replacing and Upgrading a CPU.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Online Reconstruction 1M.Ellis - CM th October 2008.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
Proposal for an Open Source Flash Failure Analysis Platform (FLAP) By Michael Tomer, Cory Shirts, SzeHsiang Harper, Jake Johns
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
WHAT’S IN A PC, and How Does It Do What It Does. ON THE INSIDE… Power Supply CD/DVD Drive Hard Drive (ROM) Mother BoardMemory (RAM) Central Processing.
Lesson 2 Component Overview Core Hardware Fundamentals.
11 th April 2003L1 DCT Upgrade FDR – TSF SessionMarc Kelly University Of Bristol On behalf of the TSF team Firmware and Testing on the TSF Upgrade Marc.
Back-end Electronics Upgrade TileCal Meeting 23/10/2009.
CLAS12 DAQ & Trigger Status
Smart Ethernet I/O P2P and GCL Introduction
MICE Target Report Video Conference 29/11/07
Serial Data Hub (Proj Dec13-13).
Presentation transcript:

MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009

MICE Overview Brief overview of the work that is being undertaken in the target control electronics upgrade Interlocks into the target control system For Discussion: Signals to be sent to ISIS Fault Conditions with the target controller 17/6/20092P J Smith - University of Sheffield

MICE Current Upgrade We are currently working through a 3 stage plan to upgrade the target electronics 1.Replace the current controller with a system that allows more flexibility and can be controlled via a PC interface. Electronics can also be queried via the PC. 2.Replace much of the peripheral circuitry with circuitry that also can be brought under the control of the PC interface/target controller 3.Replace the targets third party DAQ with our own custom target DAQ. – Tailor it to our own needs –No integration problems due to third party closed source drivers Estimate that the complete upgrade will take about  18 months with stage 1 being ready shortly after the new target is installed in the summer of /6/20093P J Smith - University of Sheffield

MICE Current Upgrade The current PIC based system is being replaced with a USBDAQ board. A general purpose I/O board tied to a Spartan FPGA. As the name suggests the board has a USB controller that allows it to communicate with a host PC. – Built peripheral boards that communicate with outside world based on old circuit designs. –An interface board has been designed that connects the peripheral boards to the USBDAQ board –Firmware that was programmed into the PIC is being transferred to the FPGA. However this is a ground-up reprogram as code from PIC is not transferable (completely different technologies) 17/6/2009P J Smith - University of Sheffield4

MICE 17/6/2009P J Smith - University of Sheffield5

MICE Interlocks There are 2 ‘levels’ of interlocks here. 1) Internal control interlocks to prevent the user from performing certain tasks in an incorrect order (logical) 2) External signals that enter the system In reality the correct functioning of the system is dependent upon both of these Currently the only hard wired external interlock is the target frame position and enable key. Under normal functioning we intend to implement : (-> Target Frame cannot be lowered until the target is in its hold position) -> Target Frame has to be raised before the target can be parked Ability to add up to 8 external interlocks to the target controller Controller response to a given interlock can be programmed into the FPGA (requires firmware update and a reprogram) 17/6/20096P J Smith - University of Sheffield

MICE Signals to ISIS 15 RG178 Signal Cables were installed last summer between MICE LCR and ISIS LCR. These were put in place to allow signals to pass between these 2 locations. For MICE Cleaner Beamloss signals Cleaner Trigger Signals For ISIS (5 spare) Intention is to send ISIS various signals pertaining to the status of the target system. After discussion with Dean Adams the decision was to send the following signals: Target Position Frame Position (Actuation Signal)? (Particle Rate Signal) – Jean Sebastian? (Target System Cannot Provide) 17/6/20097P J Smith - University of Sheffield

MICE Fault Conditions What to do in the case of a fault condition? (For Discussion) Two conditions that I’m concerned about: A fault condition that is picked up by the controller –This means that it is reportable… …but means that the target is non-functional and cannot be held out of the beam – I could send you an error signal - Although this feature has not currently been designed into the upgraded system (but it could be during stage 2 upgrade) – How do you view that signal in the MLCR? –The system could be made so that the control PC automatically raises the frame in the case of an error condition. ( James and myself discussing how we can implement this) Major failure, such as the power supply is interrupted to the target controller electronics. –It is hard to see how this can be signalled. –Control PC could raise the frame if that system is still ok This suggests that a protocol system may be useful… but we have already witnessed such a system break down –Requires formalising and some thought. 17/6/20098P J Smith - University of Sheffield