ACS 567: Software Project Management Spring 2009 Instructor: Dr. John Tanik.

Slides:



Advertisements
Similar presentations
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Advertisements

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Project Management.
Project Scope Management
Project Scope Management
Project Cost Management Estimation Budget Cost Control
What is a project? Project Management Institute definition
Chapter 5: Project Scope Management
Project Management Session 7
Chapter 5: Project Scope Management
Business Intelligence Dr. Mahdi Esmaeili 1. Technical Infrastructure Evaluation Hardware Network Middleware Database Management Systems Tools and Standards.
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Chapter 5: Project Scope Management J. S. Chou, P.E., PhD.
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Project Scope Management
Project Scope Management J. S. Chou, P.E., PhD.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Project Management and Scheduling
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Project Management An Overview John Mulhall MIICM; LIB International Credit & Process Management Professional.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Computer System Analysis
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Project Scope Management Process
Chapter Extension 18 Large-Scale Systems Development © 2008 Pearson Prentice Hall, Experiencing MIS, David Kroenke.
Chapter 5: Project Scope Management Information Technology Project Management.
Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
Basic of Project and Project Management Presentation.
Agenda  Purpose  Definition  Processes  Performance Reports  Quality Control  Risk Monitoring & Control  Change Requests 5.3.
Software Project Management (SPM)
STUDENT ACADEMIC PLAN BY TEAM NETINFOTECH April 30, 2013.
OPMA 5364 Project Management Part 0 – Course Overview Dr. Edmund Prater The University of Texas at Arlington.
SacProNet An Overview of Project Management Techniques.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
REAL TIME GPS TRACKING SYSTEM MSE PROJECT PHASE I PRESENTATION Bakor Kamal CIS 895.
Develop Project Charter
Project Management Methodology
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
The Project Plan Plan Your Work, then Work Your Plan
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
PMP Study Guide Chapter 11: Controlling Work Results.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
V. 2. © Copyright and all rights reserved 4. Project Integration Management PMP Prep Course Based on the PMBOK ® Guide 3 rd Edition.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Introduction to Project Management Project Monitoring and Control Lecture a This material (Comp19_Unit9a) was developed by Johns Hopkins University, funded.
Configuration Control (Aliases: change control, change management )
Information Technology Project Management, Seventh Edition.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Project Management PTM721S
Chapter 11 Project Management.
IF 3507 Manajemen Proyek Perangkat Lunak
Managing the Project Lifecycle
Software Planning Guidelines
Project Management and Information Security
Chapter 3 Managing the Information Systems Project
Part II Project Planning © 2012 John Wiley & Sons Inc.
InLoox PM Web App product presentation
Project Management Chapter 11.
Managing Project Work, Scope, Schedules, and Cost
Chapter 3 Managing the Information Systems Project
Presentation transcript:

ACS 567: Software Project Management Spring 2009 Instructor: Dr. John Tanik

Assumptions and Constraints Project is completed on an academic level Only best estimate (not accurate) of the schedule and cost required No coding is required Project will not be implemented into the production phase Project supposed to follow guidelines specified by the instructor All the deliverables are supposed to be completed before the semester end date.

Contents A statement of what our project is The project organization. The project management, estimation and control procedures. The activities, schedule, and budget. The risk management plan. The test plan and web security plan. The Quality assurance and verification and validation plan.

Project Organization Kal GovinduDeep RauniyarTyson Maxwell -Project Manager - Programmer / Backend Engineer - Art Director/ Visual Designer -Assistant Project Manager -Quality Assurance Lead - Usability Lead - Production Lead / Production Designer - Content Manager - Information Designer **Responsibilities details are outlined in our PMP

Project Estimation Effort Estimation – Based on initial architecture, requirements, constraints and scope of the web project – Outlined in Work Breakdown Structure Cost Estimation – Research into similar project of same size and complexity – Major Cost Drivers: Employee salary, Services Utilized, Materials and Administrative Expenses

Project Estimation (Continued …) Schedule Estimation – Based on research into similar project – Assumes the project will be taken into production phase and will be commercially launched. – PERT estimation technique(Microsoft Office Tools) Resource Estimation – Staff members and Materials

Work Plan - WBS WBS – Defines the Scope of work Next Step : WBS Dictionary and RAM ( Responsibility Assignment Matrix)

Work Plan – Schedule Dependencies Detailed Schedule Dependencies is included in our PMP or Refer to our Project Web Site

Work Plan – Gantt Chart *For detail view & the Microsoft Office file refer to our Project Web Site

Work Plan – Gantt Chart ( Phase I - Zoomed)

Work Plan – Budget Allocation

Project Control Plan - Requirements Control plan to manage the requirements process and procedures – Identification of Requirements Identify structure, functionality and performance issue of the project. – Recording Requirements tracking matrix – Modification of Requirements Requires consent and approval of the design team under the authority of the project manager.

Project Control Plan - Schedule Earned Value Management System (EVMS) – Schedule Variance (SV), SPI – Microsoft Project Tools Critical Path Method – Control activities most crucial to completion of the project. Milestones – Major milestone at the end of each phase. Weekly examination against the baseline project schedule

Project Control Plan - Budget Set aside 15% of development cost as reserve. Considering the size and complexity of the project extensive budget plan not required. Earned Value Management System (EVMS) – Cost Variance (CV), CPI – Microsoft Project Tools

Risk Management Plan Risk Management Process for ‘ShareIT.com’

Risk Management Plan – Risk Register Elements Risk ID Number (24 Project risks identified) Risk Description and Consequences – Project Risk, Product Risk, Business Risk & External Risk Risk probability and severity (Scale 1-5) Risk Response – Mitigate, Transfer, Avoid and Accept Risk Trigger Residual Risk probability and severity Secondary Risk

Risk Register – Shareit.com *For complete table of risk register refer to our Project Web Site

Technical Process – Project Test Plan Test Plan major elements: – List of all faults and failures modes – Test selection criteria – Testing effectiveness and objectives – Theoretical and practical limitations Use of standardized method Testing will be conducted on multiple stages Alpha and Beta testing

Technical Process – Web Security Plan Site security features: Security questions – 3 security questions CAPTCHA Expiring passwords User Categories – user controls the items they want to share SSL encryption – encrypted user sessions

Technical Process - Verification and Validation Formal verification and validation will be performed on following work products: – Web design requirements – Web design architecture – Web design interface design – Database design – Implemented web site interface Verification and Validation activities includes: – Inspections – Review by the design team

Technical Process – Quality Assurance Quality assurance model based on ISO 9000 Major quality focus area: – Usability – Browser and OS compatibility – Functionality – Internal Standards – Performance / Load handling – Content and Security – Bug free site QA activities performed throughout the lifecycle of the project

References Educational References Web Redesign: 2.0 Workflow that Works, 1st Edition, Kelly Goto and Emily Cotler. Berkeley, CA: Peachpit Press, Real Web Project Management: Case Studies and Best Practices, 1st Edition, Thomas Shelford and Gregory Remillard. Boston: Addison Wesley Professional, Software Engineering, 8th Edition, Ian Sommerville. Boston: Addison Wesley Professional, A Guide to the Project Management Body of Knowledge. 3rd Edition, ANSI/PMI Newton Square, PA: Project Management Institute, Guide to the Software Engineering Body of Knowledge Version. IEEE Computer Society. Los Alamitos, CA Advisor Reference Dr. John Tanik