Advanced Auditing with Deltek wInsight Banded Reports

Slides:



Advertisements
Similar presentations
Requirements Engineering Processes – 2
Advertisements

Chapter 1: The Database Environment
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
OvidSP Flexible. Innovative. Precise. Introducing OvidSP Resources.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
6 Copyright © 2005, Oracle. All rights reserved. Building Applications with Oracle JDeveloper 10g.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
Create an Application Title 1A - Adult Chapter 3.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Introduction Lesson 1 Microsoft Office 2010 and the Internet
Computer Literacy BASICS
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S.A.F. 1 Commodity Councils 101 NAME (S) SAF/AQCDATE.
Electric Bus Management System
Configuration management
Selecting an Advanced Energy Management System May 2007 Chris Greenwell – Director Energy Markets Scott Muench - Manager Technical Sales © 2007 Tridium,
Information Systems Today: Managing in the Digital World
Campaign Overview Mailers Mailing Lists
1 DARTBOARD Tutorial: DARTBOARD Access and Use for Faculty and Staff Tutorial: DARTBOARD Access and Use for Faculty and Staff.
1 AirWare : urban and industrial air quality assessment and management Release R5.3 beta DDr. Kurt Fedra Environmental Software & Services GmbH A-2352.
Microsoft Office Illustrated Fundamentals Unit K: Working with Data.
Microsoft Access.
Vanderbilt Business Objects Users Group 1 Reporting Techniques & Formatting Beginning & Advanced.
“The Honeywell Web-based Corrective Action Solution”
ECATS RCCA CAMP PROCESS ENHANCEMENTS
© 2005 AT&T, All Rights Reserved. 11 July 2005 AT&T Enhanced VPN Services Performance Reporting and Web Tools Presenter : Sam Levine x111.
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the OWASP License. The OWASP.
Project Management from Simple to Complex
Advanced Project Schedule Risk Analysis
M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
VOORBLAD.
Benchmark Series Microsoft Excel 2013 Level 2
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
1 Welcome to SAPS Webmail. 2 Things we will learn about: 1. Login to mail.
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Student Plans v New for Plans & Evaluations! Revised transition elements per MDE Nov 08, including document templates RTE capability added to Description.
Presented by Douglas Greer Creating and Maintaining Business Objects Universes.
Macromedia Dreamweaver MX 2004 – Design Professional Dreamweaver GETTING STARTED WITH.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Monitoring and Controlling the Project
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
12 January 2009SDS batch generation, distribution and web interface 1 ExESS IT tool for SDS batch generation, distribution and web interface ExESS IT tool.
Intracellular Compartments and Transport
PSSA Preparation.
Module 8: Government Required Reports
A lesson approach © 2011 The McGraw-Hill Companies, Inc. All rights reserved. a lesson approach Microsoft® PowerPoint 2010 © 2011 The McGraw-Hill Companies,
© Paradigm Publishing, Inc Access 2010 Level 2 Unit 2Advanced Reports, Access Tools, and Customizing Access Chapter 8Integrating Access Data.
1 Earned Value Management (EVM) with SDSI Toolset Utilities Powerful tools for achieving true Cost/Schedule (C/S) Integration using Microsoft Project and.
Benchmark Series Microsoft Excel 2013 Level 2
Management Information Systems, 10/e
1 Distributed Agents for User-Friendly Access of Digital Libraries DAFFODIL Effective Support for Using Digital Libraries Norbert Fuhr University of Duisburg-Essen,
Exony Reports User Guide Estimated Timings:
South Dakota Library Network MetaLib User Interface South Dakota Library Network 1200 University, Unit 9672 Spearfish, SD © South Dakota.
Benchmark Series Microsoft Excel 2013 Level 2
Dave Bachman DAU / CDSC September 9, 2004
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
IEVMC Lesson 8 FY14 Analysis Case Study Performance Management Analysis Tools Student guide page 8-5.
EVM 202—Lesson 7 Tools Analysis Case Study
EVM 202—Lesson 7 Tools Analysis Case Study
Presentation transcript:

1402 - Advanced Auditing with Deltek wInsight Banded Reports Presented by: Mitch Mueller, Lockheed Martin Systems Integration

 2007 Lockheed Martin Corporation Abstract wInsight Banded Reports offer many new options that enhance advanced auditing. Learn how to create reports, such as Statistics by element VARs, status, owners and other attributes; Data integrity across wInsight units (EOC) and structures (WBS vs IPT); Automating E-mail lists; ETC Projection Stability and Validity; and Earned Value Margin of Error.  2007 Lockheed Martin Corporation

 2007 Lockheed Martin Corporation Agenda Lockheed Martin Systems Integration – Owego Goal: Efficient Reporting for Management by Exception Managing by Exception Report Examples Across Historical Periods Across Future Periods For the Current Element, or for all Selected Elements Across Units Performing Simple Calculations and Highlighting Performing Complex Calculations, Evaluations and Formatting Summary  2007 Lockheed Martin Corporation

Lockheed Martin Systems Integration - Owego Kanata, Ontario Owego, NY Systems Integration - Owego Headquarters Havant, UK UK Integrated Systems Pax River, MD Approximately 4,000 Employees  2007 Lockheed Martin Corporation

Lockheed Martin Systems Integration - Owego Ground Based Systems Land-Based IEW Systems for RF Direction Finding and Situational Awareness Tactical Wheeled Vehicles for Cargo and Personnel Transport IEW - integrated electronic warfare  2007 Lockheed Martin Corporation

Lockheed Martin Systems Integration - Owego Distribution Systems Advanced Technological Solutions and Integrated Networks for Postal Authorities World Wide Automated Postal Solutions to Expedite Package Distribution Address and Character Recognition Threat Detection Integration Material Movement and Management  2007 Lockheed Martin Corporation

Lockheed Martin Systems Integration - Owego of Systems Systems Integration Platform Integration Integrated Systems Family of Systems Cross Domain Integration Networked Platforms Subsystems Prime Contractor TSPR TSPI RTOC Avionics Suites Integrated Electronic Warfare Electronic Surveillance Targeting Processing  2007 Lockheed Martin Corporation

Business Systems Modernization My Task: Optimize and Integrate Program Management Tools Scope: Legacy Cost Engine Earned Value Management Systems (WBS, EVM, RAM, SOW) Project Schedule Tools (IMP, Critical Path Management) Risk Management Tools (Managing the Known Risks) Risk Modeling (The Known and Unknown Risks, Correlations) and later: Resource Management / Capacity Planning Requirements Management / TPMs IMP - Integrated Management Plan / Integrated Master Plan RAM – Responsibility Assignment Matrix SOW - Scope Of Work / Statement of Work TPM - Technical Performance Measurements WBS - Work Breakdown Structure  2007 Lockheed Martin Corporation

Program Management Systems Schedule Tool Cost Engine EVM System Risk Management Risk Modeling Microsoft Project Legacy Web IDE/Portal Deltek GlueViewer wInsight Admin Legacy Cost Engine REMS Risk+ Web IDE - Integrated Digital Environment REMS – Risk Management / Enhancement System Performance Analysis  2007 Lockheed Martin Corporation

 2007 Lockheed Martin Corporation The Goal Efficient Reporting for Management by Exception What is Management by Exception? Common Responses: But I already have Earned Value Management requirements! (EVM VARs is a Management by Exception Process) Request to print all Earned Value fields for all WBS elements. Request to copy all the values of all elements and periods to Excel  2007 Lockheed Martin Corporation

Management By Exception A specific evaluation of Program reality (or a Program Forecast), compared to a Current and Stable Program Baseline (a Plan under CM). Determine What to Manage (Cost, Schedule, …) Document the Exception Condition: Title and Description Document the Exception Metrics, Criteria and Thresholds Note: Exceptions without Thresholds are just Variances Document all Actions / Management Response (The Purpose) To be useful, measurements must provide a basis for action Measurement without Management Response is only Reporting Document and Create Filters, Views, Reports with Highlighting  2007 Lockheed Martin Corporation

The Value of Metrics and Reports Essentially, all models are wrong, but some are useful. George E.P. Box There are no facts, only interpretations. Frederick Nietzsche An approximate answer to the right question is worth a good deal more than the exact answer to an approximate problem. John W. Tukey The only useful function of a statistician is to make predictions, and thus to provide a basis for action. William Edwards Deming  2007 Lockheed Martin Corporation

Evaluate and Validate all Metrics and Forecasts Metric Definition Documentation Metric Purpose Management Response Metric Category Performance Metrics (EVM, …) Composition or Health Metrics Process Compliance Metrics Metric Criteria and Thresholds Collection Methods and Frequency Margin of Error Display Historical Trends Use and Criteria Phase Differences Beginning, Middle, Near End Completed, In-progress, Near Term, Long Term Rejection Criteria and Thresholds Forecast Definition Documentation Forecast Purpose Management Response Forecast or Estimate Forecast Algorithms CPI Forecast CPI*SPI Forecast Monte Carlo Completion Dates Margin of Error Display Historical Trends Use and Criteria Phase Differences Beginning, Middle, Near End Completed, In-progress, Near Term, Long Term Rejection Criteria and Thresholds Forecast - to calculate or predict as a result of study and analysis of available pertinent data Projection - an estimate of future possibilities based on a current trend Estimate - estimate implies a judgment, considered or casual, that precedes or takes the place of actual measuring or counting Merriam-Webster  2007 Lockheed Martin Corporation

Creating wInsight Exception Reports Starting with a report request or issue: Review the Exception Purpose and Criteria for validity Select Elements Using Exception Criteria and Thresholds Display Requested Attributes of the selected Elements Calculate and Display Requested Attributes of the selected Elements Highlight the Exception Fields (Positive/Negative, H/M/L, Trend↑↓↔) Sort to Prioritize the Exceptions (Ex: Top 10 CV, Top 10 SV, …) Document all criteria and display in the report legend when possible Note: Acquire a Programmer and/or Web Developer proficient in JavaScript  2007 Lockheed Martin Corporation

 2007 Lockheed Martin Corporation Report Examples The following were created for evaluation, education and/or use. Reference: Custom Reports, see Appendix C of “wInsight 63 UM.PDF” Reports to display attributes from the current element. Banded Reports, “Customizing wInsight Reports” Deltek Web #36189 Reports to display attributes of elements from the current filter. (|Meta|BeginLoop|ce|SyncSortWnd|) Reports to display attributes of elements from a query. (|Meta|BeginLoop|ce|IDSelect|SELECT Element … Warning: These reports are DB specific (Access, Oracle, SQL)  2007 Lockheed Martin Corporation

Report: Future Period Summary Custom Report: Add PctSpentEAC Add Security Banner for the current element  2007 Lockheed Martin Corporation

Report: Future Period Summary Adding PctSpentEAC <TR><TD CLASS=WRTD>% SPENT(EAC)</TD> <TD CLASS=WRTD ALIGN=right><SCRIPT LANGUAGE="Javascript"> document.write(pctval((|AcwpCum|(-2)|[z3]|),(|Lre|(-2)|[z3]|),"c2")); </SCRIPT></TD> document.write(pctval((|AcwpCum|(-1)|[z3]|),(|Lre|(-1)|[z3]|),"c2")); document.write(pctval((|AcwpCum|(-0)|[z3]|),(|Lre|(-0)|[z3]|),"c2")); </SCRIPT></TD></TR>  2007 Lockheed Martin Corporation

Report: Prior Period User Narrative Custom Report: Reporting historical fields for the current element with simple highlighting  2007 Lockheed Martin Corporation

Report: Future Period All Rows Banded Report: Reporting historical fields and future fields for all selected elements  2007 Lockheed Martin Corporation

Report: BAC/EAC/VAC Delta between Periods Banded Report: Calculating the difference between two periods with simple formatting  2007 Lockheed Martin Corporation

Report: EOC (Units) vs Total Dollars Delta Modify existing EOC Report to highlight differences  2007 Lockheed Martin Corporation

Report: VAR Analysis Tiering Elements Banded Report by Query* Selection of Tiering (Children) Elements of the Current Element  2007 Lockheed Martin Corporation

Report: Percent Thermometer Complex Formatting for “graph” Complex Evaluations of SV in accounting months  2007 Lockheed Martin Corporation

Report: Quick Status with Schedule Variance in Accounting Months Complex Evaluations of SV in accounting months for all selected elements  2007 Lockheed Martin Corporation

 2007 Lockheed Martin Corporation Report: 30/60/90 Day Outlook Evaluating Historical and Future Data and highlighting exceptions for the Current Element  2007 Lockheed Martin Corporation

Report: 30/60/90 Day Outlook All Rows Evaluation of Historical and Future Data for all selected Elements  2007 Lockheed Martin Corporation

Report: Future BCWS and ETC Trend Audit  2007 Lockheed Martin Corporation

Report: VAR Statistics and Email Distribution Lists  2007 Lockheed Martin Corporation

Report: Element Start Finish Dates Example 1 – On plan (On schedule) Example 2 – The CAM changed the purchase from a single payment, to two payments separated by over 3 months. Example 3 – Started late, projected to finish early, but significantly behind schedule!? Time to investigate. Example 4 - VAC includes ETC on completed elements, the concern is when ETCs (NOCs) extend significantly through the future and that they might grow.  2007 Lockheed Martin Corporation

Report: Element Start Finish Dates – SQL Query Find the first Budget Period in the Historical data for the current element: (|Meta|BeginLoop|cd|IDSelect|Select TOP 1 Period.PeriodID FROM Period INNER JOIN Contract ON (Period.ContrId = Contract.ContrId) INNER JOIN EarnedValue ON ((Period.PeriodID = EarnedValue.PeriodID) and (EarnedValue.UnitID = un_id)) INNER JOIN Element ON ((Element.ElemID = EarnedValue.ElemID) AND (Element.StruID = st_id)) WHERE (Contract.ContrID = cc_id) AND (Element.ElemID = ce_id) AND (EarnedValue.BcwsCum > 0.05) ORDER BY Period.EndDate ASC|) The Budget Plan Started on (|Period|EndDate|#cd#|[!%b %y]|) (|Meta|EndLoop|cd|) Note: For some reports a Database/SQL Programmer is required.  2007 Lockheed Martin Corporation

Report: EV Margin-of-Error  2007 Lockheed Martin Corporation

 2007 Lockheed Martin Corporation Summary Evaluate current reporting capabilities and efficiency Identify reporting gaps Design, create/modify Reports, Filters and Views to address the gap Follow Management by Exception guidelines Find a programmer or web developer that knows HTML and JavaScript Peer review, user review, and benchmark Iterate Share and discuss gaps and solutions with other users mailto:Mitch.Mueller@LMCo.Com?subject=Deltek 1402  2007 Lockheed Martin Corporation

Questions

 2007 Lockheed Martin Corporation The End  2007 Lockheed Martin Corporation