14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

EFINORD Integration of Nordic Forest Research in EFI Niels Elers Koch IUFRO Vice President, Director General, Professor Katrine Hahn Kristensen Scientific.
EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.
FP7 Design study proposal Michele Punturo Harald Lueck.
Neutrinos in CHIPP Allan Clark Neuchâtel Meeting June 2004.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
FP7 and ILIAS-NEXT Geppo Cagnoli INFN Sez. Firenze University of Glasgow 3 rd ILIAS GW Meeting – 26 th Oct. 2006, ICL.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
CHIPP Workshop on Detector R&D June - University of Geneva Common R&D for astroparticle physics: Activities of ApPEC and ASPERA Bernard Revaz and.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
EPOCA – 11. June EPOCAConsortiumOrganisation.
EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
European design study on Neutrinofacilities - Euronu within FP7.
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Proposal submitted 2 nd May 2007 “Approved” ~ beginning August 07  highest mark ever.
Draft Collaboration Model for HLLHC-DS HLLHC-DS Meeting 20th July 2010.
AIDA negotiation process AIDA NCP Meeting,
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
EuCARD Number of partners : 40 beneficiaries (12 countries) Total cost ~ 50 M€ (requested EC contribution: ~15 M€) Coordinator : J.-P. Koutchouk (CERN)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Concluding remarks R. Aleksan CERN, November 25, 2005 CARE is almost 2 year old What comes next ?
ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures Deadline May 2 nd 2007.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
CARE Governing Board R. Aleksan CERN, April 5, Meeting objectives 2.General financial overview 3.Conclusion.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
General Introduction Markus Nordberg (CERN DG-DI-DI) 1
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
AMICI WP1 – Management, coordination and dissemination
ESGARD - 19th May 06 Very brief summary! 32 LOIs received LHC Upgrade
Accelerator R&D for Future Neutrino Projects
The Way Forward ISS to IDS
EUROnu: Management Aspects
European Detector R&D: AIDA
EU Institution Board 1 representative of each participating institute
as of today 123 registered participants
AMICI WP1 – Management, coordination and dissemination
A High Intensity Neutrino Oscillation Facility in Europe
The European Consortium working on the ESSνSB project
Preliminary Project Execution Plan
Poster session: Wednesday 6 June
Presentation transcript:

14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7

14 mars 2007M. Dracos, Neutrino Design Study2 FP7 call and first discussion with EU officers DS structure Future actions Neutrino Oscillation Facility Design Study in FP7

14 mars 2007M. Dracos, Neutrino Design Study3 Work Program: Capacities

14 mars 2007M. Dracos, Neutrino Design Study4 FP7 Capacities Work Programme: Infrastructures

14 mars 2007M. Dracos, Neutrino Design Study5 Design Studies budget

14 mars 2007M. Dracos, Neutrino Design Study6 ESFRI and CERN strategy group report

14 mars 2007M. Dracos, Neutrino Design Study7 Discussion with EU officers (meeting the 05/01/07 with D. Pasini and C. Kurrer) Encouragements for a neutrino DS, not more than 5 M€ by EU, duration: 4 years, possibility to extent the DS using the 2010 call, meanwhile possible to participate to IA proposals, but very difficult to obtain funding for R&D, IA more for improving existing facilities, investigate for ERC grants (young physicists).

14 mars 2007M. Dracos, Neutrino Design Study8 Neutrino Oscillation Facility Design Study in FP7 Title:European Design Study of a High Intensity Neutrino Facility Acronym: EURO- Aim: Study and comparison (physics performances and cost) of the different options in order the neutrino European community to be ready for the particle physics decisions of Duration:4 years Cost:<5 M€ (+institutes participation ~50% with a minimum of 25%) Coordinating person:R. Edgecock Host institutes:CCLRC more details in:

14 mars 2007M. Dracos, Neutrino Design Study9 p-driver target collector  front-end  accel. stor. ring technologies  beamOverview SBBBNF  13 CPVMSW … (non-acc.  ?) LAr Cerenkov Emulsions magnetized physics detectors facilities optional or not baseline

14 mars 2007M. Dracos, Neutrino Design Study10 p-driver target collector  front-end  accel. stor. ring technologies  beam Work Packages Super-Beam Neutrino Factory Beta-Beam in order to underline synergies… Near det. Beam instr. Far det. Perform. Comparison Detectors Physics

14 mars 2007M. Dracos, Neutrino Design Study11 Work Packages 1. 1.Management (R. Edgecock, M. Lindroos, M. Dracos) 2. 2.Super-Beam (M. Zito, C. Densham) 3. 3.Neutrino Factory (K. Long, J. Pozimski) 4. 4.Beta-Beam (complementarities with EURISOL DS) (A. Fabich, M. Benedikt) 5. 5.Detectors (near, far, beam instrumentation) (P. Soler, xx) 6. 6.Physics (performances, comparisons) (P. Hernandez, A. Donini)

14 mars 2007M. Dracos, Neutrino Design Study12 Distribution of resources WPmonths% Management487.4 Super-Beam168 (78 target 36 horn 24 p-driver 30 integration) 25.9 (12.0 target 5.6 horn 3.7 p-driver 4.6 integration) Neutrino Factory Beta-Beam detectors physics TOTAL648~13.5 FTE/year

14 mars 2007M. Dracos, Neutrino Design Study13 EURO- and ESGARD ESGARD supports the DS on neutrinos with all the partners ready to contribute. It is in line with the strategy document and would enhance the EU role in this field. P-driver is studied elsewhere. Therefore, it should only be in this DS for consistency of the whole project, with a lower priority and without asking for money. Detectors should not be a large part of the DS and be only included for consistency of the project. Astrophysics community is working on detector proposals. Caveat: 1. 1.all ingredients must be part of the project so that its success does not depend on institutes external to the collaboration There must be a unique coordinator who can be helped by additional scientific coordinators if necessary.

14 mars 2007M. Dracos, Neutrino Design Study14 Proposal preparation Proposal preparation: R. Edgecock, M. Lindroos, M. Dracos (under BENE SG supervision). Identify all interested institutes: under way (summary of the project already prepared: Propose WP coordinators: finished Proposal presentation: 7 Feb. (BENE SG meeting) and 28 th March(?). Draft to be sent to the participating institutes for approval: end of March Discussion with Brussels: end of March Signature by participating institutions: beginning of April Final proposal agreed: 20 Apr. Proposal delivery: 2 nd May

14 mars 2007M. Dracos, Neutrino Design Study15 END

14 mars 2007M. Dracos, Neutrino Design Study16 Possible participants Bulgaria:Sofia France:Grenoble, Saclay, Strasbourg Germany:Julich, Rostock Italy:Bari, Genoa, LNF, LNGS, LNL, LNS, Milan Latvia:IPUL Russia:Dubna, ITEP, Novosibirsk Sweden:Uppsala Switzerland:CERN, ETH, Geneva, PSI UK:Brunel, CCLRC, IC, Oxford, Sheffield, Warwick Poland:Cracow

14 mars 2007M. Dracos, Neutrino Design Study17 Work Package Proposal 1 WP1 – Management: Coordinator: EdgecockLead lab: CCLRC Consortium Board Membership: DS coordinators WP coordinators 1 member/institute Purpose: Oversight of DS Meetings: Twice per year or as required Steering Committee Membership: DS coordinators WP coordinators IDS representatives Others ex-officio as required Purpose: Running the DS Meetings: Every two months