Presentation is loading. Please wait.

Presentation is loading. Please wait.

EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.

Similar presentations


Presentation on theme: "EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos."— Presentation transcript:

1 EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos for providing materials!

2 EuroNu CERN February 5, 2008 Marco Zito Outline About this workpackage Focusing on the most challenging/crucial problems : –The target - talk by C. Densham –The collector –The target/collector integration –Neutrino beam simulation Participating institutes: IN2P3, CEA/IRFU(previously Dapnia), CCLRC, Cracow U. of Technology Deliverables and milestones -> a CDR for the Superbeam!

3 EuroNu CERN February 5, 2008 Marco Zito What Euro ν DS Superbeam is about-1 Consider as baseline the SPL to Frejus concept MEMPHYS Far detector feasibility, excavation, engineering is covered by the Laguna DS

4 EuroNu CERN February 5, 2008 Marco Zito What Euro ν DS Superbeam is about-2 Proton driver and target : many issues in common between Super-Beam and NF Decide to join forces and tackle these problems in this WP The NF WP will focus on the muon front-end The conclusion of this WP will then be incorporated in the SB and NF CDRs

5 EuroNu CERN February 5, 2008 Marco Zito SPL Important and very positive recent news (see next slides from R. Garoby and F. Gerigk) CDR for SPL available Ongoing work by dedicated team Refinements, R/D, further studies in other frameworks (HIPPI, IA …) Changes to this proton-driver design only from the optimization of the target and collection or from the physics and detector studies

6 EuroNu CERN February 5, 2008 Marco Zito CERN-AB-2007-014-PAF

7 EuroNu CERN February 5, 2008 Marco Zito

8 EuroNu CERN February 5, 2008 Marco Zito

9 EuroNu CERN February 5, 2008 Marco Zito

10 EuroNu CERN February 5, 2008 Marco Zito Collector Main challenges: design of a high current pulsed power supply (300 kA/100 μs/50 Hz), cooling system in order to maintain the integrity of the horn despite of the heat amount generated by the energy deposition of the secondary particles provided by the impact of the primary proton beam onto the target, definition of the radiation tolerance, integration of the target.

11 EuroNu CERN February 5, 2008 Marco ZitoCollectors horns Or solenoid In operation completed built MiniBooNE CNGSK2K (SB) NUMI In operation M. Dracos

12 EuroNu CERN February 5, 2008 Marco Zito Focusing system: magnetic horn Protons Current of 300 kA To decay channel Hg Target B 1/R B = 0 M. Dracos

13 EuroNu CERN February 5, 2008 Marco Zito Horn prototype ready for tests M. Dracos

14 EuroNu CERN February 5, 2008 Marco Zito The power supply Due to the high price go to a modular system and increase small by small the current M. Dracos

15 EuroNu CERN February 5, 2008 Marco Zito Neutrino Beam simulation Needed to optimize the target, collector, decay tunnel Use modern tools (GEANT 4) and recent data (HARP) Input to the physics work package for the performance evaluation Need to develop in synergy with similar studies in existing SB and in the IDS community

16 EuroNu CERN February 5, 2008 Marco Zito "Physics" studies to be restarted energy deposition z (cm) P (kW) z (cm) corne corne 2 M. Dracos

17 EuroNu CERN February 5, 2008 Marco Zito Sensitivity 3.5GeV sin 2 2 13 10 -1 10 -2 10 -3 m 2 23 10 -3 10 -2 10 -4 90%CL 95%CL 99%CL Minimum: 13 = 1.2° (90%CL) Preliminary A.Cazes thesis

18 EuroNu CERN February 5, 2008 Marco Zito Deliverables DeliverableDelivery date (months) Requirements for proton driver 6 Target and Collection design report 30 Target and Collection integration 36 Beam characteristics36 Final report48

19 EuroNu CERN February 5, 2008 Marco Zito Milestones MilestoneDelivery date (months) Proton driver report12 Prel. Design of Target and Collection 24 1st Target and Collection integration drawings 24 1st Est. of Nu Beam Intensity 24 Final Target and Collection integration drawings 36 Design of target station40 Report on Nu Beam Intensity 42

20 EuroNu CERN February 5, 2008 Marco Zito Conclusions SuperBeam work package of the Euro ν DS is focusing on the key issues for this project The SPL to Fréjus project is the baseline Excellent news from SPL side Feasibility and conceptual solutions for the target and collector (horn) will be studied A strong European collaboration is ready to contribute to this field


Download ppt "EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos."

Similar presentations


Ads by Google