EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.

Similar presentations


Presentation on theme: "EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies."— Presentation transcript:

1 EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies to be appointed

2 Status of Negotiations Status of Negotiations Documents required by EC:  Draft Annex1 to GA  GPFs Sent middle October 2007 See http://hepwww.rl.ac.uk/euro-neutrino/EUROnu-annex1.doc No comments received so far Project officer has been in contact Possible reasons:  No particular problems with EURO  Concentration on other projects  UK funding crisis

3 Status of Negotiations Status of Negotiations GA: specific mods for CNRS, CSIC Annex 1: same as proposal, but with additional info GPFs:  A’s – info provided by you  B’s – from proposal Possible areas for comment:  Funding request from EC  Deliverables  WPs

4 Status of Negotiations Status of Negotiations >4M€

5 Status of Negotiations Status of Negotiations [1][1] Deliverable numbers in order of delivery dates: D1 – Dn [2][2] Please indicate the nature of the deliverable using one of the following codes: R = Report, P = Prototype, D = Demonstrator, O = Other [3][3] Please indicate the dissemination level using one of the following codes: PU = Public PP = Restricted to other programme participants (including the Commission Services) RE = Restricted to a group specified by the consortium (including the Commission Services) CO = Confidential, only for members of the consortium (including the Commission Services) [4][4] Month in which the deliverables will be available. Month 1 marking the start date of the project, and all delivery dates being relative to this start date.

6 Status of Negotiations Status of Negotiations Del. no. [1] [1] Deliverable nameWP no. Lead beneficiaryEstimated indicative person-months Nature [2] [2] Dissemination level [3] [3] Delivery date [4] [4] (proj. month) D1Requirements for proton driver 2212RPU6 D2Report on 1 st year activitiesAll147RPU12 D3Review detector performance of baseline scenarios 5436RPU12 D4Review physics of baseline scenarios and optimisation 6624RPU12 D5Review of baseline muon front end and large aperture acceleration 3356RPU15 D6Comparison criteria139RPU18 D7Collection device construction 41540PPU18 D8Bunching performance evaluation 4740RPU18 D9Interim reportAll194RPU24 D10Target and collection design report 21175RPU30 D11Cost and performance evaluation for reference muon front-end 3756RPU30 D12Report on the experimental validation of the collection device for Li-8 41590PPU30 D13Project review documentation All1122RPU36 D14Target & collector integration 2850RPU36 D15Beam characteristics2231RPU36 D16Optimisation of baseline detectors 5459RPU36 D17Recommendation of the reference Neutrino Factory design 3556RPU38 D18Performance and cost evaluation of the facility 3256RPU42 D19Physics comparison between the facilities 6689RPU43 D20Comparison between facilities 1125RPU46 D21Final reportAll1240RPU48 TOTAL1407 [1][1] Deliverable numbers in order of delivery dates: D1 – Dn [2][2] Please indicate the nature of the deliverable using one of the following codes: R = Report, P = Prototype, D = Demonstrator, O = Other [3][3] Please indicate the dissemination level using one of the following codes: PU = Public PP = Restricted to other programme participants (including the Commission Services) RE = Restricted to a group specified by the consortium (including the Commission Services) CO = Confidential, only for members of the consortium (including the Commission Services) [4][4] Month in which the deliverables will be available. Month 1 marking the start date of the project, and all delivery dates being relative to this start date.

7 Status of Negotiations Status of Negotiations [1][1] Deliverable numbers in order of delivery dates: D1 – Dn [2][2] Please indicate the nature of the deliverable using one of the following codes: R = Report, P = Prototype, D = Demonstrator, O = Other [3][3] Please indicate the dissemination level using one of the following codes: PU = Public PP = Restricted to other programme participants (including the Commission Services) RE = Restricted to a group specified by the consortium (including the Commission Services) CO = Confidential, only for members of the consortium (including the Commission Services) [4][4] Month in which the deliverables will be available. Month 1 marking the start date of the project, and all delivery dates being relative to this start date. Work package No Work package titleType of activity Lead participant No Person- months Start month End month 1Management and Knowledge Dissemination MGT192148 2Super-BeamRTD2333148 3Neutrino FactoryRTD5282148 4Beta BeamRTD3295148 5Detector Performance RTD4178148 6Physics ReachRTD6206148 TOTAL1386

8 Status of Negotiations Status of Negotiations GA: specific mods for CNRS, CSIC Annex 1: same as proposal, but with additional info GPFs:  A’s – info provided by you  B’s – from proposal Possible areas for comment:  Funding request from EC  Deliverables  WPs Future modifications: updated Associates list

9 Status of Negotiations Status of Negotiations Next steps:  Comments from EC  Final modifications from us  Final comments from EC???  Signing of A2.5’s  Signing of GA agreement by EC and me  Funds from Brussels

10 Consortium Agreement Consortium Agreement First draft – almost ready  This week, if not already Fairly standard, with no particular difficulties Please check and make sure admins are happy

11 Website, etc Website, etc Website  http://www.euronu.org exists http://www.euronu.org  Currently points to http://hepwww.rl.ac.uk/euro-neutrino/ http://hepwww.rl.ac.uk/euro-neutrino/  Plan to copy EURISOL site  INFN agreement given  Security issues still being checked Logo!  Need one!  Volunteer?

12 Mailing Lists Mailing Lists Only private lists at the moment Proposed lists:  EURO list – everybody in DS – I’ll need contact details  GB list  WP lists – to be created by WPM Comments?

13 Management Structure Management Structure

14 Responsibilities in EURO Responsibilities in EURO Governing Board:  Ultimate authority in EURO  Oversees the operation of the DS  Make sure other boards are doing they’re jobs  1 member per partner  1 meeting/year, during annual meeting  Chair to be elected from members (see later)  Ex-officio members to be decided (see later)

15 Responsibilities in EURO Responsibilities in EURO Management Board:  Ensure contract execution  “ all obligations (deliverables, milestones) met  Meet as required  Membership: project coordinator 1 each for SB, NF and BB  Latter need to be elected (see later)

16 Responsibilities in EURO Responsibilities in EURO Coordination Board:  Monitoring of all tasks  Integration with international activities  Identification of synergies with other projects  Meet ≥ 3 times a year  Membership: MB WP coordinators and/or deputies Others ex-officio, as required

17 Responsibilities in EURO Responsibilities in EURO Coordination Board: WPCoordinatorDeputy 1Edgecock (STFC)tbc 2Zito (CEA)Densham (STFC) 3Pozimski (ICL)Meddahi (CERN) 4Wildner (CERN)tbc 5Soler (Glasgow)Cervera (Valencia) 6Hernandez (Valencia)Donini (Madrid)

18 Responsibilities in EURO Responsibilities in EURO International Advisory Panel:  Activities of WPs  Technical choices  Distribution of resources  Activity planning  1 meeting/year, during annual meeting  Membership: 3 people, not from partners to be proposed by GB (see later)

19 Appointments Appointments Chair of GB Must be a member of GB Willing to stand  Steve Myers (CERN)

20 Appointments Appointments Ex-officio members of GB Organisations that should be approached for names From proposal  ECFA representative  IDS representative  MEGLIO representative (if approved)  Others?

21 Appointments Appointments Members of MB Project leader must be a member Others:  1 each for SB, NF and BB  Not coordinators or deputies  Interim board: Marcos Dracos (SB) Mats Lindroos (BB) Ken Long (NF)

22 Appointments Appointments Members of IAP Not from partners 1 each from Asia, Europe, US From accelerator, experiment, theory background Knowledge of SB, NF and BB Proposed so far:  Mike Zisman (US)  Alexander Olshevski (Russia)  Sandhya Choubey (India)  Takaaki Kajita (Japan)  Others?

23 Objectives Objectives Basic philosophy  SB, NF and BB in the same project  Collaboration rather than competition Need to meet DS requirements  CDR(s)  Documents to be presented to appropriate EU bodies  Prepare for next step  CERN Council in our case

24 Objectives Objectives Plus dissemination Independent comparison

25 Objectives Objectives ObjectiveDelivery date Define facility comparison criteria18 Undertake interim facility performance for Project Review36 Produce reference design of each facility42 Undertake physics and cost comparison46 Write a CDR for each facility and publish outcome48

26 Planning Planning Annual meetings:  Plenary meeting for EURO  “Parallel” meetings for WPs  GB meeting, with input from IAP  (Same time as IDS meeting) Proposed dates: November 2008: CERN November 2009: USA November 2010: RAL (Project review) November 2011: Paris

27 Planning Planning MB: meet as required Dissemination Board: ditto CB: meet ≥3 times a year WPs:  meet as required (but often!)  clearly, phone meetings regularly  organised by WPM All meeting announcements, slides, minutes: website

28 Publication Policy Publication Policy All publications (internal & external) on website All external publications refereed:  journals – DB member + consortium expert  proceedings – expert Referees responsible for getting comments Making sure they’re implemented Reporting to DB DB authorisation required before publication