Minutes of the 3rd EURONS PCC-Meeting Mainz, 6.-7. April 2006 Agenda: see

Slides:



Advertisements
Similar presentations
Alex C. MUELLER, NuPECC meeting, Athens, March EURONS 1st annual report: Generalities (I) With an EC contribution of 14,056,000 EURONS is.
Advertisements

GRIDS infrastructures under the 6th FP Contractual and financial modalities Christophe KOWALSKI European Commission, Information.
1 Financial Procedures in FP7 Projects Reporting and Audits Karolina Lis Research Assistant DCU, Finance Office
Training Module: The MED-Dialogue project (611433) is co-funded by the European Community's ICT Programme under FP7 6 - Resource Allocation and Budgeting.
Support and Inclusion of students with disabilities at higher education institutions in Montenegro – Procedure for collecting valid documentations.
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
Christine Rülle, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 Activity Information Sheet- JRA3 old Version, December 2005 Participant No.19.
ACCEPT project Grant Agreement FP7-SSH-2009-A.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS (ENPRODUS) Managerial Issues.
Financial, Reporting and Practical issues Per Mogensen, DASTI.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Research Infrastructures Seminar for I3 and CA Project Co-ordinators 12 November 2004, 1 Management and Implementation of I3 and CA Contracts Seminar for.
Reporting requirements (2)
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
TBTIMPACTS SIXTH FRAMEWORK PROGRAMME SPECIFIC TARGETED RESEARCH PROJECT Assessing impacts of TBT on multiple coastal uses TBTIMPACTS Contract no.: INCO-CT
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
EU-IndiaGrid (RI ) is funded by the European Commission under the Research Infrastructure Programme 1 Project Reporting in FP6:
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Management Report Annette Freibauer Management Report Annette Freibauer Max-Planck-Institute for Biogeochemistry, Jena.
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Administrative Session 15th March, 2007, Grand.
EURONS The EUROpean Integrated Infrastructure Initiative in Nuclear Structure within FP6 Present status and remarks to NuPECC Alex C. Mueller,
October 25, 2005 Pathways To Successful EU-Research Projects Financial management in FP 6 projects Praha, October 25, 2005 Claudia Labisch KoWi Office.
Ismar Financial and administrative procedures Nearest Kick-off meeting Bologna, 11 October 2006.
Information on the ANNUAL REPORT OCTOBER 18 th, 2006.
Basic principles of FP7 Grant Agreement Financial management and reporting.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Monica Pantea, MANETPCC meeting in Groningen 2006 Time Schedule of the EURONS Annual Report End of reporting period Deadline of submission.
Monica Pantea, MANETGA and PCC meeting in Vienna :30Coffee & Welcome 10:00Opening (ACM) 10:15Overview Annual Report 2007 (ACM) 11:15coffee 11:30Scientific.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
1 EUDET Status Preparation Annual Meeting Information Annual Report Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) Kick-off Meeting June 8-10.
Volvox Finance 2 How we will manage the Finance Angela Pettit – Contracts Officer.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Financial reporting Linda Wormö, MA Per Dahlström, MA 1st October,2015 Kuopio, Finland.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
Volvox Understanding the Budget Angela Pettit – Contracts Officer.
EURONS The EUROpean Integrated Infrastructure Initiative in Nuclear Structure within FP6 Present status and remarks to FINUPHY Alex C. Mueller,
Funded by the European Commission WHAT MAKES A GOOD PROPOSAL?
CARBOOCEAN Annual meeting, December 2007 Finance and administration by Hege D. Høiland SIXTH FRAMEWORK PROGRAMME PRIORITY “Global Change.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
P.Ignatiadis & Prof Vassilios Zacharopoulos ELKE TEI CRETE March 2011 FP7 Training Courses for TEI Crete 1 FP7 - FINANCIAL AND PROJECT MANAGEMENT.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Kick-Off Meeting, Brussels 22 October 2004.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
EGEE is a project funded by the European Union Overview of contract and FP6 procedures Fotis Karayannis EGEE SEE Fed. Representative in PMB, GRNET Zoi.
ONCODEATH Sensitization and resistant determinants of cancer cells to death receptor related therapies Contract No: LSHC-CT Kick off meeting.
DIRAC Phase 1 Reporting, Dec. 1 st, 2005 Reporting to the Commission Periodic Reports Interim Activity Reports Project Deliverables Final Reports.
Financial Guidelines FP6 – IST Directorate C 1 st Evaluation proposals co-ordinators Briefing 17 July 2003.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 I3 EURONS: a status report to NuPECC March 2005.
EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study Project financial status R. Battistella, PSI June 2006.
EURISOL DS Mid Term Review Orsay April 24th 2007 Management Aspects Collaboration and Interaction Administration and financial aspects with comparison.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
Budget & Finance. OUTLINESOUTLINES Part 1 : The Eden project in figures Part 2 : Financial relations within the 6th FP 2 1. Roles in the financial process.
Ismar Financial report procedures. Ismar Financial reporting For each reporting period of activity Each partner shall produce a “Periodic Management Report”
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
4th. Plenary Meeting, Edinburgh, May 2010
Project Management Financial management
SKADS Controller’s Meeting Timeline Annual Financial Report
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Presentation transcript:

Minutes of the 3rd EURONS PCC-Meeting Mainz, April 2006 Agenda: see Annual Report 2005 – Summaryhttp:// ppt13-1.ppt )Alex C. Mueller Brief summary of the annual report 2005: milestones, deliverables, spendings of EC contributions All achievements and spendings are on schedule besides minor deviations from the work plan. Money for first 12 months is meanwhile spent, awaiting next pre-financing. Remark: the administrative work of the EURONS consortium (e.g. Annex I, consortium agreement) is appreciated and will be used by other I3s.

Detailed analysis for the activitieshttp:// ppt13-2.ppt )Monica Pantea Presentation refers to the first 12 months of the project, i.e. it reflects the status as of 31. Dec Milestones are presented as far as they are known to MANET, listed per activity, updates are given during the meeting. Report of milestones to MANET not necessarily immediately after achievement (it is sufficient to report them with the next AIS) but it would be useful to keep the records up to date at any time. Financial status: overall 83% of first pre-financing 2005 are spent TA activities: GSI, KVI and JYFL spent more, LNL, ISOLDE spent less than transfered, overall balanced, calculated user fees for 2005 for GANIL and INFN need to be clarified. JRAs: some underspending (most of the underspendings is due to late hiring of personnel, as was already stated at the previous PCC meeting in Bordeaux), otherwise as scheduled. Due to the late employment also the number of person- months is a bit lower than expected. Networks: on target

AIS for summer 2006http:// ) Christine Rülle The already very useful AIS is further improved. AIS for summer 2006: a new row is added, "fulfilled months 1-12" (will be filled by MANET taking numbers from the last annual report), allows comparison of planned budget with what has been achieved. For JRAs: for person months (PM), there were figures for "EU" and "PI"-contribution. This is replaced by: "Total" and "EU" - now easier to use the AIS as basis for cost statements as numbers can be transferred directly into the form "Justification of Resources" of the Annual Report.

For FC contractors this new scheme will apply to all contributions (personnel, consumables, travel,....), for AC contractors only for the PM (remember: AC contractors state additional costs, which equals the EU contribution, whereas FC contractors declare the total costs from wich the EU contribution is 50%). FC contractors having scheduled a much higher own contribution in the original Proposal should consider that this higher contribution is not relevant towards the EC, as the contractual obligation is only the double of what is foreseen in the contract. In the AIS only what is stipulated in the contract and what is directly transferable into the report is stated. However, as the information on this extra "own contribution" should not get lost it should be declared in the TOTAL PM in brackets. Real financial dimension of the project will be monitored via an extra row “Global estimate of the total costs including the non eligible costs” in the "Justification of Resources" form.

Experiment acronyms for TA activitieshttp:// Apr-13-4.pptApr-13-4.ppt )Marjan Koopmans, Klaus Groß Problem: in database report to the Commission - list of user projects sorted according to the project (experiment) acronyms, therefore projects from different facilities are mixed – not convenient to read Solution: add a leading acronym, which indicates the facility. It is proposed, that one should approach the commission with the question whether this proposal could be applied on a more general level to other/all European facilities and/or whether user projects could be sorted first by facility in the database report. There is no easy way to control that users really fill the online questionnaire. A reminder will be sent out to the group leaders about this.

Physics highlights from EURONS activities Recent results from ISOLDE DOC-2006-Apr-13-5.ppt Karsten Riisager First feasibility studies from EXL OC-2006-Apr ppt Nasser Kalantar New results from tagging, cooling and trapping experiments at JYFL DOC-2006-Apr-13-6.ppt Rauno Julin Report on DLEP activityhttp:// DOC-2006-Apr-13-7.ppt Olof Tengblad CARINA and demand from EURISOL DOC-2006-Apr-13-8.ppt Carmen Angulo Status of the AGATA project and future plans DOC-2006-Apr-13-9.ppt Wolfram Korten Recent scientific activities at ECT*: highlights and conclusions from projects DOC-2006-Apr ppt Renzo Leonardi Progress from RHIBhttp:// DOC-2006-Apr ppt Thomas Aumann Recent results with the GAMMAPOOL campaigns DOC-2006-Apr ppt Silvia Lenzi EWON: mapping studies of nuclear physics in south-east and north-east Europe DOC-2006-Apr ppt Sotirios Harissopulos

Financial plan (next 18 months) 13.ppt13.ppt Monica Pantea Presentation of the overall financial plan for 2006 and the sum requests for months of the project The proposed next money transfer to the projects is 100% of the requested money for 2006 for12 months minus reserves as of 31. Dec This is agreed. Christian Kurrer confirms that the presented requested budget is reasonable. The pre-financing will proceed as expected. The analysis of the cost statements as handed in with the annual report is ongoing. Meanwhile, ISIBHI money is already spent (necessary to launch some orders), "reserve" still at MANET will be used for such instances. Table on next money transfer in full detail is found at figures are based on December 2005 AIS. The "third money transfer" is calculated from the 18-months-request (AIS), scaled down to 12 months, and subtracted the individual "reserve" (=previous transfers minus previous spendings).

C. Angulo asks to increase the CARINA budget by ~15.000€ (see her talk The request is unanimously accepted. It is generally possible to shift some budget within EURONS without the EC's approval (compared to FP5, where the budget could be shifted within up to 20% with the permission of the Commission). C. Kurrer: amendments for such budget changes are no longer necessary, can be agreed within the consortium. The available flexibility should be used, however, sum rules can of course not be broken. Project co-ordinators should be aware that the total sums for an activity or respectively institution can not necessarily be spent up to the very last cent. M. Harakeh reports from experience in the past FP5, where budget shifts were dependent on the progress of a project. Remark: people should receive an information in the 3rd year how much they can still spend. With the next annual report everybody has to go through an audit. C. Kurrer: auditing follows the local rules, EU standards are not superimposed.

The user fee was accepted by the contract, but can be a matter of auditing itself (if the auditor feels the user fee should be cross checked). More important is that they follow and are in agreement with the local rules and standards. Money transfer to the new EWON members will be done first, others still have reserves left. The third money transfer will take place as soon as the managing will have received money from Brussels. Status of FP7http:// Christianhttp:// Kurrer Presentation of overview of FP7 ( ): specific programmes and novelties (e.g. "ideas programme"). Further information can be found at andhttp://

Report on NuPECC meetings in Brussels and Athens, general discussion and further stepshttp:// Alex C. Mueller Based on the minutes of the latest NuPECC meetings. Timescale of the next call for new EURONS activities earliest end of 2007, project start to be expected mid/end Duration of the projects in next FP not yet decided, according to ACM 4-5 years reasonable. Collaborations should be formed early, new JRAs and networking activities need to be developed. Clear results and conclusions of an activity are appreciated ("concept works" or "does not work"), continuation of JRAs should not be the rule, but certain developments may lead to follow-up JRAs.

The refereeing process will be similar to previous FPs. It is still under discussion how the money will be distributed between different EC instruments and different calls. The outcome from CARINA (astrophysics needs) should be considered at the next NuPECC town meeting, where also ECOS will be presented. There is some overlap (e.g. stable beams) between ECOS and CARINA. New ideas and suggestions should be addressed at the next general EURONS meeting. Next PCC and GA meeting: and in Groningen.

EURONS EC contract sum: € First Transfer from EC: € Transferred budget in 2005: € Reserve MANET: € Spendings up to 31 st December 2005: € Reserve at the contractors: € Financial Status 2005

Request for months € (from annual report 2005) assumption: needs according to AIS have not been corrected for reserves of 2005 still unspent Reserves (MANET + Contractors): € Expected second pre-financing from EC: € (80% request – reserves) Scaled request for 12 months: € Proposal: MANET transfers 12 months request minus reserves at contractors: € Financial Plan 2006

Expected second Transfer from EC: € (80% request – reserves) Scaled request for 12 months: € Proposal: MANET transfers 12 months request minus reserves at contractors: € MANET Reserves : € Financial Plan 2006

Financial Status 2005: Transnational Access

Financial Status 2005: Joint Research Activities

Financial Status 2005: Networks