Cihangir Gençoğlu 08.03.2011, Joint Transmission System Operator – Utility Regulator Renewable Energy Workshop, Istanbul Integrating Intermittent Renewable.

Slides:



Advertisements
Similar presentations
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
Advertisements

Black Sea Regional Transmission Planning Project - renewables integration - By Predrag Mikša EKC - Electricity Coordinating Center Simferopol, June 2011.
RES-E Impact on Transmission Grid and Power System Reserves
Edge Debate, April 2005 Joe Short
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
1 By: Mr. Zafar Mahmood Chairman, Water and Power Development Authority OCTOBER 2014.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Bob Green Garland Power and Light
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
Experience you can trust. 1 Solutions for large-scale wind power integration in the European system EWEC2009 Energy and power management Frits VerheijMarch.
NovEnergia II Technical Bureau - Sep08 THE OPPORTUNITIES OF HUNGARIAN WIND ENERGY Álvaro Rodrigues September 2008.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Mahmut Erkut Cebeci , Amman Integrating Intermittent Renewable Energy Resources.
Dr. Yüksel MALKOÇ TWEA Vice President. Turkey’s current financial outlook, Demand growth and supply development, Wind potential and capacity development,
PRESENTATION FREQUENCY CONTROL
Methodologies for Quantifying Energy Security in the Power Sector William Blyth 24 th April 2005.
Introduction to the EnergyPLAN model Henrik Lund Aalborg University Denmark Aalborg University, September October 2005 PhD-course: Energy System Analysis.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
Governor Response Sequence Bob Green Garland Power and Light ERCOT Future AS Workshop January 20, 2014.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Novel Strategies to Reduce Variation of Wind and Solar Generation at its Source Stephen Rose Eric Hittinger.
Energy and Low Carbon Society Policy in Taiwan Chen Li-chun Faculty of Economics Yamaguchi University Tel/Fax:
Demand Response – A New Option for Wind Integration ?
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Dr. Osman Bülent TÖR Power System Planning and Analyse Group Jordan, 2012 Responses of IPPs against Incentive Mechanisms for Renewable Generation in Turkey.
Turkish Power System Overview March 2012
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
1 The Tres Amigas SuperStation VLPGO November 2011.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
Conclusions Innovative application of induction and synchronous generators in autonomous small hydropower plant Prof. M.T.E. Kahn NeuroMorphoGenics/NMG.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
FREQUENCY CONTROL AND AUTOMATIC GENERATION CONTROL
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation UN Climate Change Conference June 2011 Bonn, Germany, 7.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
© Copyright 2013, First Solar, Inc. Establishing Accurate Power Generation Cost Assumptions for ERCOT Planning Colin Meehan – Director, Regulatory and.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Steady State Analysis Of A Microgrid Connected To A Power System
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Smart Grid Schneider Electric Javier Orellana
Goran Majstrovic Davor Bajs Energy Institute HRVOJE POŽAR Croatia PREPARATION FOR LARGE SCALE WIND INTEGRATION IN SOUTH EAST EUROPE Joint TSO.
The Impact of Intermittent Renewable Energy Sources on Wholesale Electricity Prices Prof. Dr. Felix Müsgens, Thomas Möbius USAEE-Conference Pittsburgh,
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Energy Storage Modeling for Distribution Planning Roger C. Dugan Jason A. Taylor Davis Montenegro EPRI.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
This project has received funding from the European Union’s Horizon2020 research and Innovation programme under grant agreement No
Operation of power systems with high shares of wind power
Challenges of integrating Variable Renewable Energy Sources (V-RES)
Economic Operation of Power Systems
STATE ENERGY AND WATER REGULATORY COMMISSION
Automatic Generation Control (AGC)
EU-IPA12/CS02 Development of the Renewable Energy Sector
Additional clarifications on economic and adequacy running hours
NS4960 Spring Term, 2018 China: Expanded Renewables
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
FREQUENCY CONTROL-THE UNEXPLOITED GOLD
RE Grid Integration Study with India
Svetlana Rybina, Lauri Holopainen
July update JANUARY 2019.
Presentation transcript:

Cihangir Gençoğlu , Joint Transmission System Operator – Utility Regulator Renewable Energy Workshop, Istanbul Integrating Intermittent Renewable Energy Resources: TSO Operational Challenges and Solutions

Outline 1)The present Turkish Electricity Transmission System 1)ENTSO-E CESA trial parallel operation and frequency control performance indices 1)The possible effects of rapid growing intermittent generation on Turkish Electricity Transmission System a) Geographical distribution of renewable generation b) The expected challenges 1)Conclusions

Part 1 The Present Turkish Electricity Transmission System (Before Synchronization)

Some Facts about Turkish Grid ~50 GW installed capacity More than 32 GW of peak demand (summer) Annual increase in demand 7–8 % Hydro, coal and combined cycle power plants Deregulated generation sector Privatized distribution sector TEIAS is natural monopoly in transmission business (regulated by EMRA)

CESA System

Organization Chart of the Project Rehabilitation of the Frequency Control Performance of TPS for Synchronous Operation with UCTE Survey of Power Plants Site Tests & Studies Design of Governor Control and Parameter Optimization Secondary Control Design and Optimization of AVR/PSS Special Protection Scheme Restoration Plan Training

Preliminary Studies Site Survey –Power Plant Dynamical Data Generator Parameters AVR, PSS, Speed Governor Models and Parameters Reliability of the data is very important!!! Identification of the Problems –Very Low Frequency Periodical Frequency Oscillations (b/w sec, depending on the state of the system) Governor Rehabilitation and Retuning Studies (mostly concentrated on HPPs) –Poor Quality of Frequency Control Coordination with PPs, Balancing & Settlement Market –Expected Low Frequency Inter Area Oscillations (caused by static excitation systems and longitidunal structure of the system) PSS Rehabilitation and Retuning Studies Innovative Measures

Periodical Frequency Oscillations Major HPPs out of Service

Periodical Frequency Oscillations Major HPPs in Service

Basic Problem (Challenging !!!) Periodical frequency oscillations have been resolved by rehabilitation of Ataturk & Karakaya HPPs. According to the simulation studies, the expected inter area mode after interconnection of Turkey is ~0.15Hz. ~0.15Hz oscillations are inside the control bandwidth of: –PSSs –Governors Conclusion: The speed governing structures of power plants (Governors and Turbines) should not contribute to inter area power swings of ~0.15Hz.

Primary Frequency Control – TPPs & NGCCPPs TPPs –Site specific problems Quality of coal Old power plants (rehabilitation !!!) –Boiler follows turbine !!! –Pressure control !!! NGCCPPs –No problems as far as there is sufficient reserve for all conditions Base load ~ f(temperature, pressure, humidity) –Temperature control !!! HPPs –Designed according to the site specific geographic conditions –High nonlinearity –Every HPP is a small kingdom having its own rules

Part 2 ENTSO-E CESA Trial Parallel Operation and Frequency Control Performance Indices (After Synchronization)

Inter Area Oscillations – After Interconnection Expected mode shape after interconnection of Turkish Power System to ENTSO-E CESA system.

Simulation Studies - Time Domain Analysis

Stability Related Issues Low frequency modes (~0.15 Hz) are present in the system!!!

Dynamic Stability - Solution Methodology Road map for enhancing the steady state stability of the interconnected system

Interconnected System Frequency δf ~ 25 mHz f average ~ Hz Total 30 sec reserve (i.e., primary reserve) of the CESA system including Turkey is ~3000 MW Turkey as a control area provides ~300 MW of this reserve

Performance Indices 1)The hourly integral of ACE should not exceed ±60 MWhrs –To limit unintended energy exchanges 2)Number of cases with ACE > ±175 MW (measured per 2 seconds, evaluated per 4 seconds) over an hour should not exceed 10% of the cases in normal operation –To prevent overloads in the electricity transmission systems of the neighboring Balkan countries 3)The amount of sum of tie line flows due to inter area oscillations should not exceed 30 MWs in normal operation –To prevent overloads due to inter area power oscillations in the CESA countries

Frequency Control Problems High standard deviation of ACE due to –Intermittent loads –Hourly load variations up to 2500 MW/hr (annual peak load is ~32000 MW) –Balancing and settlement market problems (mostly related to market regulations) –IT infrastructure of TEIAS Solution –Effective management of tertiary reserve (long term, not possible with the current market regulations) –Increased amount of secondary reserve under the influence of the AGC system (short term) for certain periods of the day.

Frequency Control Problems

Present State Frequency Stability (1&2) Rotor Angle Stability (3) Operational Issues –On progress

Part 3 The Possible Effects of Rapid Growing Intermittent Generation on Turkish Electricity Transmission System

Current Situation in Turkey Incentive mechanism for renewable generation TechnologyFirst 10 years of operationSecond 10 years of operation (€cent/kWh)(€cent/kWh) Hydro 7- Wind 8- Wind (offshore)12- Geotermal 9- Solar – PV 2520 Solar – SMES 2018 Biomass (incl. LFG) Wave, tidal 16- –90 % discount in system usage tariff & 99% discount in license fees –Extra incentives in the case of usage of domestic equipment –Technical previleges (ancillary services & market regulations) –Priority in system interconnection –Land usage incentives –For further details see Turkish Law #5346

Characteristics of Wind Generation

Geographical Distribution of Renewable Generation

The Expected Challenges Increased standard deviation of ACE due to –Intermittent generation in short term (turbulent peaks/dips) –Balancing and settlement market problems due to bad prediction of wind capacity in long term –IT infrastructure of TEIAS Special monitoring/control system requirement especially for wind power Solution –Effective management of tertiary reserve (current market regulations do not encourage generation curtailment) –Increased amount of secondary reserve under the influence of the AGC system (short term) for the entire day.

Part 4 Conclusions

The frequency stability of TETS has been drastically enhanced with the ENTSO-E CESA Interconnection Intermittent generation characteristics in short term, together with balancing and settlement market problems due to the stochastic nature of renewable resources will definitely have adverse effects on this issue. Possible solution: –Effective management of tertiary reserve (current market regulations do not encourage generation curtailment) –Increased amount of secondary reserve under the influence of the AGC system (short term) for the entire day. –Monitoring and control infrastructure investments (both hardware and software)