Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 SilC Collaboration R&D Advances since St Malo Si-Envelope design Mechanics Electronics Future Prospects.

Slides:



Advertisements
Similar presentations
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Advertisements

J-C Brient LLR Progress report on the ECAL prototype 2 - New informations on the cost of the W-Si ECAL 3 - A proposal for a new design of the.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
DPNC Daniel La Marra Activities in 2013 for the Electronics Group « GrElec »
Long Shaping-time Silicon Readout Bruce Schumm University of California, Santa Cruz Amsterdam ECFA-DESY Workshop April
Long Shaping-time Silicon Readout Bruce Schumm UC Santa Cruz Arlington Linear Collider Workshop January
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Hervé Lebbolo, François Rossel, Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 TOPICS: Main parameters of the Si-Envelope Front-End Issues: Long shaping.
Solid StateTracking R&D activities in Europe ALCPG 2004 Winter Workshop SLAC, January 7-10, 2004 World-Wide review of Linear Collider Tracking Aurore Savoy-Navarro,
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Charged Particle Tracker for a RHIC/EIC joint detector Detector layouts based on EIC and NLC Physics drivers Silicon detector technologies Simulations.
A Silicon Disk Tracker in forward direction for STAR News since November 2000 Physics Capabilities capabilities Requirements / Potential Technologies Possible.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LC Workshop January 6-10, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Third International Conference on Frontier Science Villa Mondragone – Monteporzio Catone Physics and Astrophysics in Space June 14, 2004 Mercedes Paniccia.
28 June 2002Santa Cruz LC Retreat M. Breidenbach1 SD – Silicon Detector EM Calorimetry.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
Embedded Pitch Adapters a high-yield interconnection solution for strip sensors M. Ullán, C. Fleta, X. Fernández-Tejero, V. Benítez CNM (Barcelona)
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
SiLC (Silicon tracking for the International Linear Collider) H.J.Kim (KyungPook National U.) on behalf of the SILC R&D Collaboration.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
PRC Meeting DESY, Hamburg, May 7 and 8, 2003 SilC: an International R&D Collaboration to develop Si-tracking technologies for the LC (except microvertex)
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Cornell LC Workshop July 13-16, 2003.
ECFA-DESY Extended Studies NIKHEF, Amsterdam 1st to 4th April, 2003 Tracking session 31st March 2003 SilC: an International R&D Collaboration to develop.
Simulation Studies for a Digital Hadron Calorimeter Arthur Maciel NIU / NICADD Saint Malo, April 12-15, 2002 Introduction to the DHCal Project Simulation.
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
GLD Intermediate tracker task list Configuration & software Silicon Sensor Electronics Support structure H.J.Kim, Kyungpook U. for intermediate tracker.
Simulation Studies for a Digital Hadron Calorimeter Arthur Maciel NIU / NICADD Saint Malo, April 12-15, 2002 Introduction to the DHCal Project Simulation.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
Progress Report since last ECFA-DESY, Prague Nov ’02 Aurore Savoy-Navarro, LPNHE-Universités de Paris 6/IN2P3-CNRS  Sensor & Electronics Test bench 
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Silicon Detector Tracking ALCPG Workshop Cornell July 15, 2003 John Jaros.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
1 Performance of a CCD tracker at room temperature T. Tsukamoto (Saga Univ.) T. Kuniya, H. Watanabe (Saga Univ.); A. Miyamoto, Y. Sugimoto (KEK); S. Takahashi,
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
Aurore Savoy-Navarro 1), Albert Comerma 2), E. Deumens 3), Thanh Hung Pham 1), Rachid Sefri 1) 1) LPNHE-Université Pierre et Marie Curie/IN2P3-CNRS, Fr.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
Latest from the SiLC R&D Aurore Savoy-Navarro, LPNHE-Paris/IN2P3-CNRS On behalf of the SiLC collaboration: U. of Michigan, UCSC-Santa Cruz, IMB-CNM/CSIC,
Silicon Tracker Data Acquisition and Electronics for the Linear Collider Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3 On behalf.
Electronics of the Silicon Envelope
Hybrid Pixel R&D and Interconnect Technologies
Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Status report on the SiLC ongoing activities
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 SilC Collaboration R&D Advances since St Malo Si-Envelope design Mechanics Electronics Future Prospects

SiLC COLLABORATION Status: International Collaboration started early 2002 [ChicagoWorkshop] Aim: To pursue R&D on Si detectors for tracking at future LC Who: Santa Cruz (Dorfan et al), SLAC (Jaros et al), Colorado, Tokyo, Wayne(Bellwied et al), MIT (Fisher), LPNHE, BNL; Several European & Asian (Japan, Korea and Taiwan) Institutes are also joining Most of these groups have already a large or even sometime proeminent expertise in this R&D domain. Two detectors are considered:  The all-Si-tracker (SD)  The Si-envelope (LD or TESLA) See:

Si-Tracking concepts: All-Si-tracker (SD) Si-envelope

The SiLC Collaboration is pursuing independently of the detector concept, a generic R&D that focuses on:  Various sensor technologies Short µstrips, long µstrips, SDD (contacts with Canberra, Hamamatsu, ST Microelectronics)  R&D on Electronics FEE for each sensor case Digitization, trigger logic, Timing info(SDD) Cabling & packaging Power cycling issues  R&D on Mechanics Transparency, hermeticity, architecture, support modularity, rigidity, deformation studies, cabling, cooling, alignement  Simulation studies Developing the necessary tools: Full simulation (GEANT4-based) Fast simulation, Pattern recognition, Tracking reconstruction algorithm(s) Studies on Physics issues and needs (precision, dE/dX…), Detector performance studies, including comparisons between different detector techniques and concepts. A lot is underway in the Collaboration, with many different tools available (legacy from previous experiments)

WE BENEFIT FROM: WE BENEFIT FROM: the already existing expertise gained by: the already existing expertise gained by: Precursors: Precursors: The LEP Microvertex detectors (6 µstrip sensors/ladder) STAR (SDD µvertex)  ALICE Larger area Si-tracking: CDF at Run II: 3.5 m2 µstrip detectors AMS with about 6 m2 µstrip ladders [up to 15x4.2cm length] ATLAS and CMS very large area Si-trackers [the next generation: ~ 200 m2] Working in collaboration with these experiments. OUR PURPOSE is to start from the present state-of-the-art to push further this R&D for outcomes not only for the LC, but also for:  upgrades of the LHC experiments  developments of trackers for astro particle experiments

!!!!!!!!!!!!!THINNESS!!!!!!!!!!! Long µstrips/ladders Long shaping time FEE Power cycling Passive cooling (ultimate?!) Fine granularity (pitch size) high precision (centroid) Thin detectors (<or = 300µm) ratio width/pitch! Reduced cost Sadrozinsky ‘s law Thin mechanical structure If B-field = 5 T (compact detector), demanding magnet design

R&D ADVANCES since St MALO J.E Augustin,M. Baubillier, M. Berggren, B. Canton, C. Carimalo, C. Chapron, W. DaSilva, D. Imbault, F. Kapusta, H. Lebbolo, F. Rossel, A. Savoy- Navarro, D. Vincent [LPNHE-Paris] 1)Setting up the Lab Test bench: Contacts with AMS and CMS Collaboration and Hamamatsu 2) Pursuing R&D on mechanics:  EUCLID  CATIA (Detailed design)  Progress on the Si-FCH design  Studies of cooling issues: on a mechanical prototype of the drawer with appropriate software packages  First realizations of C-fiber prototypes, to test feasibility of drawers & honeycomb structure

1)TEST BENCH for Si-SENSORS & FEE SCIPP+SLAC: Currently developing the simu of the Si-detector pulse development to begin to understand questions associated with high B-field, diffusion, pulse sharing etc… that will affect the design of the FEE chip. Present scope: to demonstrate low-noise and power switching for the FEE amplifier of a long shaping time readout system. Testing a 2m long ladder made with 10cm long sensors, 250µm pitch (GLAST) LPNHE Paris: Currently installing the test bench: 1st ladder prototype = 5 AMS sensors (4.2 cm long, 56 µm pitch, 200 µm width, bonding allowing to test: 20, 40, 60, 80 cm… long µstrips and various RO pitch sizes) 2nd ladder prototype = 6 CMS-TOB sensors, > or = 9.45 x 6 cm long µstrips (183 µm pitch, 500 µm width)

Objectives: Objectives: 6 ‘’  12 ‘’ wafers 500 µm  300 µm width 183 µm  50 to 100 µm pitch Double-sided (double metalisation) Better yield (> 50%) & cheaper Preliminary FEE studies: Preliminary FEE studies: characterizing output signals on test bench, looking for low noise preamp on the market & developing one.

2) R&D on Mechanics: Basic elements of the detector design Ladder drawer Honeycomb structure

Moving from EUCLID to CATIA The long drawer is made of 5 ladders; each ladder is made of 6 CMS-TOB sensors. The drawer is about 2.5 m long. Ladder: 6 sensors

R&D on Mechanics con’td: Si-FCH DESIGN Modularity: ladders with 4,5or 6 sensors 4 Quadrants 4 XUV made of 6 2-sided sensors: 4 XU & 2 VV XUVVUXXUVVUX

The Si-Envelope, CATIA- CAD design

CATIA design of the outside central part of the Si-Envelope: SET CATIA design of the Si-FCH honeycomb structure

The Si-envelope components in a few numbers: Si-envelope Component Items Total Number Si-FCH (XUV)Nb of layers Nb of ladders, 4 sensors Nb of ladders, 5 sensors Nb of ladders, 6 sensors Nb of RO channels/endcap Power dissipation 4 XU + 2 VV , Watts SETNb of layers Nb of ladders Nb of RO channels Power dissipation 2 1-sided sided ,293, Watts SITNb of layers Nb of ladders Nb of RO channels Power dissipation 2 2-sided = , Watts

R&D on Mechanics cont’d: C-FIBER PROTOTYPES Honeycomb structure: Several French firms contacted  No pb foreseen to realize the proposed honeycomb structure within the required dimensions C-fiber structure for drawers: Mechanical studies, design and fabrication of tools + cast of C-fiber structure drawer section done at LPNHE-PCC 1st prototype drawer structure: 2 mm thick & 20 cm long. Need to go to 1 mm thick & 2.5m long  Doable but easier by cutting structure into 2 pieces.

R&D on Mechanics cont’d: COOLING STUDIES & TESTS on PROTOS Aim: Test if water cooling at end of the 2.5 m long drawer OK vs FEE power dissipation (0.2watt/ladder) Modelling of 2.5 m drawer with C-fiber board, made of 5 parts, each one =60cm ladder. FEE = resistor (0.8 or 1.4 Watt). Higher power dissipation & very localized so much worse than anticipated. Natural air convection: T°C varies at most 8°C

A simple water cooling at the edge of the drawer looks sufficient Measuring temperature decrease in the resistor neighbourhood  rapid decrease Measuring Temperature without natural convection (~80% suppressed), T(cooling water=19degC)  results similar to natural convection, so Grad T<<10 degC

Simulation studies: developing full GEANT4-based simu. The detailed CAD mechanical design = instrumental to define the geometry DB = 1st step Tokyo is developing a full GEANT4 simu for the SD tracker  So full simulation work is really starting now.

All these issues are underway. A lot has been achieved since the first ECFA-DESY Extended Studies Workshop at Cracow in September ‘01  First results on long ladder characterization & FEE developments (next ECFA-DESY Workshop)  R&D on Mechanics aiming on: Detailed CAD Design, CATIA-based of the Si-Envelope. Building realistic prototypes of: a long ladder (Lab), a long drawer(Lab) a piece of honeycomb support structure(Industry)  Cooling tests on realistic mechanical proto & comparison with software computations (ACORD, SAMCEF)  Simulation studies: Main aim = developing a GEANT4-based detailed simulation (including pattern recognition)  Further developments of the SiLC Collaboration