Small Form-factor Versatile Transceiver (SF-VTRx)

Slides:



Advertisements
Similar presentations
The Versatile Link Feasibility Demonstration (Project phase II)
Advertisements

DC/DC Converters Markus Friedl (HEPHY Vienna) B2GM, 14 March 2012.
1 The World’s Leading Provider of Silicon Photonic Solutions BLAZAR 40 Gigabit QSFP Optical Active Cable Marek Tlalka VP of Marketing
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
1 Tell10 Guido Haefeli, Lausanne Electronics upgrade meeting 10.February 2011.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
Niko Neufeld CERN PH/LBC. Detector front-end electronics Eventbuilder network Eventbuilder PCs (software LLT) Eventfilter Farm up to 4000 servers Eventfilter.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
16 Sep 2008 Versatile Link Status Report F. Vasey on behalf of the project steering board With input from C. Issever J. Troska.
Versatile Link Project Description
On behalf of the GBT team
Versatile Link The Versatile Transceiver Towards Production Readiness Csaba Soos on behalf of Manoel Barros Marin, Stéphane Détraz, Lauri Olanterä, Christophe.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Ken Wyllie, CERN LHCb electronics, 3rd September LHCb Upgrade Electronics Meetings in 2015 (Thursday, 2pm, ): 8 th October 3 rd December.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
Hardware status GOLD Generic Opto Link Demonstrator Assess the use of optical backplane connectivity for use on L1Calo Uli Schäfer 1.
Versatile Link The Versatile Transceiver Development Status Csaba Soos, Vincent Bobillier, Stéphane Détraz, Spyros Papadopoulos, Christophe Sigaud, Pavel.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Optical Links CERN Versatile Link Project VL – Oxford involvement CERN VL+ for ATLAS/CMS phase II upgrade – Introduction and aims – Oxford workpackage:
MICROMEGAS CONNECTICS Electronics Boards And Readout Panels 25 JUNE 2013.
Versatile Link The Versatile Transceiver Feasibility Demonstration (Project phase II update) Csaba Soos, Jan Troska, Stéphane Détraz, Spyros Papadopoulos,
HF Front-end status Tullio Grassi 11 Dec Overview The HF FEE will change entirely, including the backplane. Only the cable plant (fiber, copper)
4 March 2009 Versatile Link Project Status F. Vasey on behalf of the project steering board With input from C. Issever J. Troska.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
03-Aug-10 ACEOLE Mid Term Review Hans Versmissen.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Level-1 Data Driver Card (L1DDC) HEP May 2014 Naxos 08/05/2014HEP 2014, NAXOS Panagiotis Gkountoumis National Technical University of Athens.
1 The Link-On-Chip (LOC) Project at SMU 1.Overview. 2.Status 3.Current work on LOCs6. 4.Plan and summary Jingbo Ye Department of Physics SMU Dallas, Texas.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
The Versatile Link System-level Component Tests
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
Opto Working Group Meeting Summary Tuesday 8 March 2011 Tobias Flick and Francois Vasey.
Standard electronics for CLIC module. Sébastien Vilalte CTC
11 Apr The Versatile Link Project CERN CERN Jan Troska, Francois Vasey, et al. Jan Troska, Francois Vasey, et al. Oxford Oxford.
1 Back-Of-Crate : BOC Status Oct, 2002 BOC is the optical fibre interface for the ROD Receives module control data from ROD, performs clock-data encoding,
Evaluation of Emerging Parallel Optical Link Technology for High Energy Physics John Chramowicz, Simon Kwan, Alan Prosser, Melissa Winchell Fermi National.
New ATCA compute node Design for PXD Zhen-An Liu TrigLab, IHEP Beijing Feb , 6th International Workshop on DEPFET Detectors and Applications.
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
Optical Communications for Future Trackers ANL/FNAL/UC/VWS Meeting Nov., 2011 Alan Prosser CD/ESE Fermilab 1.
Jitter and BER measurements on the CuOF prototype G. Dellacasa, G. Mazza – INFN Torino CMS Muom Barrel Workshop CERN, February 25th, 2011.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Current STS Readout Concept 1 FEB 8 STS-XYTER Electrical Interface SLVS/LVDS pairs/FEB ROB GBTx / VL Optical Interface 4 MM fibers /ROB DPB.
CMS HCAL optical links Eric Hazen (BU), Tullio Grassi (UMD) OptoWG - 28 Sept 2011.
OTMB Development and Upgrade Plan for LS2
The Jülich Digital Readout System for PANDA Developments
CSC Hardware Upgrade Status
On-detector electronics for the LHCb VELO Upgrade
sTGC Router Optical Transceiver options
Next generation rad-hard links
Update of MVD services and requests
S. Baron - BE/BI-PH-ESE GBT/VL meeting
Multiplexing Level for the PANDA MVD
ACEOLE WP4 Status Report
Large Area Endplate Prototype for the LC TPC
uTCA A Common Hardware Platform for CMS Trigger Upgrades
MicroTCA Common Platform For CMS Working Group
J.L. Sirvent1,2, B. Dehning1, J.Emery1, A. Diéguez2
TPC Large Prototype Toward 7 Micromegas modules
The DHCAL for the m2 and m3 prototype
GEM for CMS Electronics Overview
First thoughts on DIF functionality
Presentation transcript:

Small Form-factor Versatile Transceiver (SF-VTRx) Csaba Soos CERN PH-ESE-BE

Opto Working Group Mini Workshop, 8 June 2012 Motivation CMS tracker Phase II upgrade Need low profile optical interface for the new front-end hybrid Footprint constraint 45 x 15 x 8 mm3 Must include serializer (GBTX, 10 x 10 mm2) Keep stand-alone module concept Easier prototyping and maintenance Reuse work done in the framework of the VL project SF-VTRx Opto Working Group Mini Workshop, 8 June 2012

Opto Working Group Mini Workshop, 8 June 2012 VTRx real estate Current VTRx is based on the SFP+ standard Designed for board edge Connectors use lot of space Optical connection is not flexible as it is now Board space under VTRx is lost T/ROSA GBLD GBTX SF-VTRx Opto Working Group Mini Workshop, 8 June 2012

Opto Working Group Mini Workshop, 8 June 2012 Proposal 45 mm GBLD 7 mm GBTX SF-VTRx Opto Working Group Mini Workshop, 8 June 2012

Proposal Mezzanine connector, Samtec LSS family LC TOSA clip (plastic version) SF-VTRx Opto Working Group Mini Workshop, 8 June 2012

Opto Working Group Mini Workshop, 8 June 2012 Optical connector LC TOSA clip and connector Metal spring guarantees reliable optical connection Can be tailored for different TOSA packages SF-VTRx Opto Working Group Mini Workshop, 8 June 2012

Front-end module with SF-VTRx Opto Working Group Mini Workshop, 8 June 2012

Opto Working Group Mini Workshop, 8 June 2012 Status Concept demonstrator Prototypes SF-VTRx (MM) and test board are being manufactured LC TOSA/ROSA clip Can we use a commercial TOSA clip? Can we design (and 3D print) our own TOSA/ROSA clip? Test board SF-VTRx SF-VTRx Opto Working Group Mini Workshop, 8 June 2012