1 SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)

2 ATCA-SRS Status First systems delivered – IFIN-HH – UPV and – CERN (MAMMA Group) Beta firmware released New firmware will be released soon Integration with software under way 2

3 3 SRS ATCA card overview RTM I/O card: 2 x 8 SFP+ ports 2 x Rj45 (DTCC) 2 x NIM (SMA) Blade main board: 2 x Virtex 6 FPGA (LX130/240) 2 x DDR3 2 x mezzanine ports 2 x Mezzanines ATCA Zone 2 backplane connectors ATCA zone 1 power connector ATCA Zone 3 RTM connector RTM I/O card v2: (under design) 2 x 10GbE (SFP+) 2 x 4 SFP+ ports 2 x Rj45 (DTCC) 2 x NIM (SMA)

4 4 ATCA-SRS Specifications Full-mesh backplane connectivity Board-to-board connections 14 x 8 LVDS (13 x 9,6 Gbps – low latency)) Rear Transition Module Optional connection to outside world 2 x 8 GTX (2 x 40(50)Gbps) – Ethernet, Infiniband, Slink,… – 2 x 10 GbE + 4 x SFP+ under design 2 x DTCC link (4xLVDS - RD51 specific data, trigger, clock and control link) Hub Backplane Connection (CH0) 4 x GTX versatile connection – 2 x each FPGA – 4 x 1 (Master) FPGA Custom protocol (eg. HS-DTCC), 10GbE, Infiniband, … 40 GbE possible with V7 upgrade

5 8 8 GTX 50 LVDS I/O 16 SE 2 LVDS CLKS (from PLL) Power: 2.5V 3.3V 12V Management Low Latency Links Mezzanine Interface Samtec QTE/QSE Connector 5

6 6 Low Latency Links Overview Inter-FPGA link 8 x LVDS (upgradable) 2 x GTX Full-mesh backplane connectivity Board-to-board connections 14 x 8 LVDS Mezzanine interface 50 x LVDS 8 x GTX Mezzanine interface 50 x LVDS 8 x GTX

7 7 Low Latency Links Timings Inter-FPGA link 8 x LVDS (upgradable) ~ 15 ns (using SelectIO circuitry) Full-mesh backplane connectivity 15 x 8 LVDS ~ 15 ns (using SelectIO circuitry) Mezzanine interface 50 x LVDS ~ 3 ns (eg. 320 MHz) Mezzanine interface 50 x LVDS ~ 3 ns *Measurements under way at IFIN-HH

8 ATCA-SRS Upgrade Path EicSys Gmbh is already working on an upgrade design driven by RD51 members applications (deadline Sept.-Oct. 14) Discussions with Eicsys on going regarding NSW application Two possible upgrade scenarios for NSW Trigger Processor application: – A) Replace V6 on blade with V7 – B) Put V7 on mezzanine and upgrade V6 on blade to K7 or a smaller V7 8

9 ATCA-SRS Trigger Processor OPTO OPO OPTO MEZZANINE (V7) FPGA OPTO OPO OPTO MEZZANINE (V7) FPGA Track results To/from neighbor card To monitoring switch (eg. 10GbE) V7 – Track finding algorithm K7/V7 – combine sTGC/MM results + Monitoring, Management, etc,. To Sector Logic OPTO OPO OPTO MEZZANINE (V7) FPGA OPTO OPO OPTO MEZZANINE (V7) FPGA Track results To/from neighbor card To monitoring switch (eg. 10GbE) V7 – Track finding algorithm & combine results + To Sector Logic 9

10 ATCA-SRS Upgrade Schedule and cost Current cost/blade: ~3k EUR (based on one full crate order, i.e. 14 blades) Upgrade cost driven mainly by the FPGA cost Variant B – Schedule ~ 12 weeks delivery for prototypes (Eicsys) – V7 mezzanine proto design by IFIN-HH (see backup) – Discussion: perhaps we may find a way to integrate the LAr AMC design Variant A may take longer 10

11 Backup 11

12 Related developments at IFIN-HH 12 SFP+ Mezzanine advanced design at IFIN-HH/CERN 8 x SFP+ up to 25 Gbps (RX/TX) High Density Optical Mezzanine Under definition at IFIN-HH MiniPods V7 (?)