MEGAPROJECT Case Study Basic Project Information Case compiled by: Dr. Athena Romboutsos Contact details: Project TitleAthens Ring Road.

Slides:



Advertisements
Similar presentations
EU Environmental Liability Legislation & Environmental Risk Management A Banking Sector Perspective Harry Papageorgiou Head, Environment Office, Eurobank.
Advertisements

1 University of Economics of Prague Western Bohemian University, Pilsen Actual challenges of implementation of PPP projects in Czech republic Zuzana Khendriche.
Greece: a new dynamic PPP market Despina Tomadaki Head of Financial Services Special Secretariat for Public Private Partnerships Ministry of Economy and.
[Organisation’s Title] Environmental Management System
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Mag. Martin Oder, LL.M. OECD/SIGMA Concessions and Public.
Successful PPP models for road infrastructure Various Models in different countries Prof. Dr. Markus Schmidt.
MANAGING MOTORWAYS CONSTRUCTION IN CROATIAN MOTORWAYS Goran Legac Construction Department Croatian Motorways, Ltd. Zagreb,
The Greek Experience Providing Important Lessons for Road PPP Transactions in other Cohesion Fund Countries John Deighton Director, Private Finance Halcrow.
SOUTH AFRICAN NATIONAL ROADS AGENCY LTD Pavement Research
Role of State Role of State in implementation of major PPP road projects Panagiotis Patsiadas Deputy Head of Contracts & Bids Unit, International Project.
Contractor Safety Management
Implementing ESD in Major Infrastructure Projects Jo Moss - Senior Principal.
ISO General Awareness Training
World Bank Transport Team April 16,  Background  World Bank assistance program  Opportunities and way forward 2.
Luise Lorenz Christina Mohr Niklas Wilkens Miguel Cabezudo Nicolas Laflesselle.
MEGAPROJECT Case Study Basic Project Information Case compiled by: Roland Gareis and Claudia Weninger Contact details: and
C-LIEGE Contract N°: IEE/10/154/SI Project duration: from 1 st June 2011 to 30 st November 2013 Date of creation: 4 th July 2011 Clean Last mile.
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Overview Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO.
Formulating requirements for training systems engineers in terms of a competency model STATE ATOMIC ENERGY CORPORATION “ROSATOM” June 28, 2013 St. Petersburg.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
THE ROLE OF CIVIL SOCIETY IN WELFARE MIX MODEL CREATION Best Practice Model Social Center "Home of colors"
Certificate IV in Project Management Project Management Environment Course Number Qualification Code BSB41507.
MEGAPROJECT Case Study Basic Project Information Case compiled by: Milen Baltov Contact details: Project Title Design and Development of.
MEGAPROJECT Case Study Case compiled by: Agnieszka Łukasiewicz Contact details: tel
The New Market of Public Private Partnerships (PPPs) in Greece by Alexandros Lykourezos Lykourezos Law Offices New York, November 17 th, 2006.
4.2 Develop Project Management Plan
Hinkley Point Nuclear Power Point.
The main Legal and Business Aspects of: Public Private Partnerships (PPPs) by Alexander Lykourezos Lykourezos Law Offices Belgrade, May 11 th, 2006.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Privatizing for the Public Good “Role of Professional Advisors to State DOTs” April 27, 2007 Thomas W. Bradshaw, Jr. Managing Director Co-Head of Transportation.
March 2007, Smolyan Angelos SANOPOULOS, Euroconsultants SA CROSS BORDER COOPERATION Bulgaria-Greece Greek State Structure and Partner Identification.
TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström Contact.
INTEGRATING SUSTAINABILITY INTO BUSINESS Session 2: “Supporting internal learning and change through stakeholder engagement” Kyiv, Ukraine,
National Smartcard Project Work Package 8 – Corporate Structures Report.
PUBLIC PRIVATE PARTNERSHIP – CROATIAN EXPERIENCE Kamilo Vrana, B.Sc.E.E. Managing Director Beograd, November 18, 2010.
Diploma of Project Management Project Management Environment Course Number Qualification Code BSB51507.
Building Capability.  In order to successfully operate an architecture function within an enterprise, it is necessary to put in place appropriate organization.
WORKSHOP ON INVESTMENT, FINANCIAL AND TECHNOLOGICAL ISSUES OF MODEL HIGHWAY INITIATIVE (MHI) IMPLEMENTATION 6-8 March 2012, Thessaloniki, Greece SESSION.
DEPARTMENT OF ENVIRONMENT & SUSTAINABLE DEVELOPMENT Konstadinos Konstadakopoulos Head of Department Lefteris Alexopoulos Environmental Consultant 2 nd.
Knowledge Platform for Assessing the Costs and Benefits of Flood Prevention Measures (FLOOD CBA) FLOOD CBA Task B: Building the Stakeholders’ Capacity.
 PPP Department within the Ministry of Economy and Transport  Government Decree in May 2003 to set up an Interdepartmental Committee – Ministry of Economy.
Legal Aspects Related to Brownfield Regenerations Prof. Maros Finka, M.arch., Ph.D. „This project has been funded with support from the European Commission.
The basic Legal Aspects of Public Private Partnerships (PPPs) by Alexander Lykourezos Lykourezos Law Offices 1 st ARAB-GREEK ECONOMIC FORUM Athens, September.
MEGAPROJECT Case Study Basic Project Information Case compiled by: Milen Baltov, Kostadin Kostadinov Contact details: Project Title Design.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
The Basic Policy Issues of Public Private Partnerships (PPPs) by Alexandros Lykourezos Lykourezos Law Offices World Bank Conference Athens, December 19.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
A project implemented by the HTSPE consortium This project is funded by the European Union SECURITY AND CITIZENSHIP RIGHT AND CITIZENSHIP
43rd ASECAP Study & Information Days 2015
Defending dignity. Fighting poverty. Managing Risk in Shelter Programming.
Kathy Corbiere Service Delivery and Performance Commission
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION Portfolio Committee on Water Affairs and Forestry 22 June 2005 V.227.
International Safety Rating System
CAR WASH SHE PRESENTATION 19 September SHE Document for Evaluation SHE Policy signed by CEO SHE Plan aligned to Kusile SHE Specification and mostly.
Part II Project Planning.
Minimum Set of Requirements for Suppliers
Minimum Set of Requirements for Suppliers
Environmental & Social Compliance in PROJECT FINANCING
Legal Aspects Related to Brownfield Regeneration
Environmental & Social Compliance in PROJECT FINANCING
European Investment Bank
European Investment Bank Group
Introduction DEFINATION :-
MEGAPROJECT Case Study
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Presentation transcript:

MEGAPROJECT Case Study Basic Project Information Case compiled by: Dr. Athena Romboutsos Contact details: Project TitleAthens Ring Road LocationAthens, Greece PurposeTo develop the inner ring and integrate a full road network for fast and safe transport in the entire Attika region, to provide connection from / to Athens International Airport, to connect the Patras – Athens and Athens – Thessaloniki highways Scope65km Motorway Contractual FrameworkPublic-Private Partnerships (PPP’s) Relevant Physical Dimensions 65km urban motorway, 24 intercharges, 125 Overpasses/Underpasses, 38 railroad grade seperated crossings, 12 pedestrian overpasses, 56 no of bored &cut & cover sections, 15,4 km length of tunnels &cut & cover sections, Length of flood protection works, 3 lanes per direction + Emergency lane SECTION 1 - BASIC PROJECT INFORMATION

Stakeholder CategoryCase-Study Comments (e.g. maturity, previous experiences of stakeholders, skills, influence on project) Internal Supply-SideClientGreek State (Ministry of Environment, Physical Planning and Civil Works) Equity joint venture specifically formed for this project FinanciersGrant, E.U, EIB loan, EIF guarantees, Commercial loans and guarantees, Contractor company Attiki Odos SA SponsorsConcession Company Attiki Odos SA Client’s Customersn/a Client’s Ownersn/a Other internal supply-side categories ( please specify) CategoryCase-Study Site OwnerGreek State ATTIKI ODOS CONSTRUCTION JOINT VENTURE construction company for the project ATTIKES DIADROMES S.A. company which has undertaken the operation and maintenance of Attica Tollway The Greek Parliament The Parliament has the legislative duties of the Greek state. The concession contract and the EIA have been ratified by the parliament as Laws of the Greek state. Demand Side)Principal Contractor Concession Company Attiki Odos SA is the company has undertaken the design, construction, financing, operation and maintenance of the motorway Group of Companies Attiki Odos First Tier ContractorsGroup Pella (First candidate temporary contractor) Group CONCIF (Second candidate temporary contractor) Second Tier Consultants n/a Professional Services Providers Jacobs Gibb Ltd. and SGI – Trademco were appointed as the Independent Engineer with their main duties being to supervise and monitor the works, provide certifications of progress and quality control, approve engineering plans and approve the necessity of any additional works required outside the concessioned object. Halcrow Bank Tech. Advisor Other internal supply-side categories ( please specify) CategoryCase-Study MEGAPROJECT Stakeholder Identification (Internal) SECTION 2 - PROJECT STAKEHOLDERS

Stakeholder CategoryCase-Study Comments (e.g. maturity, previous experiences of stakeholders, skills, influence on project) External PublicRegulatory AgenciesTraffic Police, Fire Brigade, Ambulance Local GovernmentThirty-three local, municipal and regional authorities in Attiki region provide permits, authorizations and plans that were essential for the planning and progress of the works National GovernmentGreek Government Other internal supply-side categories ( please specify) CategoryCase-study Archaeology Approximately 200 specialised archaeologists, conservators and technicians worked on all aspects of the project, in order to investigate, detect, register and promote elements of cultural heritage PrivateLocal residentsAttica Residents Local Landownersn/a EnvironmentalistsThe Environmental Terms for the ESSM section of Attiki Odos The EIA of the Immitos Western Peripheral Motorway Conservationistsn/a Archaeologistsn/a Other External Private stakeholders (please specify) CategoryCase study Activists I won’t pay movement (appeared in year 2009) MEGAPROJECT Stakeholder Identification (External) SECTION 2 - PROJECT STAKEHOLDERS

MEGAPROJECT Stakeholder Relationship Maps Key: - Project Actor - Project Relationship Name of Actor Description of relationship

SECTION 2 -PROJECT STAKEHOLDERS MEGAPROJECT Stakeholder Relationship Maps 1996 Key: - Project Actor - Project Relationship Name of Actor Description of relationship Attiki odos S.A ABAX S.A ACTOR T.S.A ATTIKI ODOS CONSTRUCTION J.V ALTEA T.S.A ATTI-KAT T.S.A Attikes Diadromes S.A Greek state Concession contract J&P (Hellas) S.A ETETH S.A TEGA S.A. ELLAKTOR S.A K.I SARANTOPOYLOS S.A TEB S.A. EGIS PROJECTS S.A. PANTEHNIKI S.A %8,47%8,22% 9,82% 8,58% 8,47% 4,91% 9,82% 7,62% 8,47% 0,07% Project delivery

SECTION 2 -PROJECT STAKEHOLDERS MEGAPROJECT Stakeholder Relationship Maps 2011 Key: - Project Actor - Project Relationship Name of Actor Description of relationship ELLAKTOR S.A Greek State Attikes Diadromes S.A Attiki odos S.A ATE BANK S.A ATTIKI ODOS CONSTRUCTION J.V J.&P. AVAX S.A ETETH S.A. EGIS PROJECTS S.A J.&P. AVAX S.A.Group AKTOR CONCESSION S S.A Concession contract 80% stake 20% stake 9.88% stake 59.25% stake leading 0.04% stake 21.00% stake 9.82%, stake

SECTION 2 - PROJECT STAKEHOLDERS MEGAPROJECT External Stakeholder Attitude Analysis External StakeholderExternal Stakeholder’s Attitude to this Project External Stakeholder’s Influence on project Impact of Project on External Stakeholder Greek Government Archaeology Attica Residents The EIA of the Immitos Western Peripheral Motorway Thirty-three municipals Activists

SECTION 2 - PROJECT STAKEHOLDERS MEGAPROJECT Internal Stakeholder Attitude Analysis Internal StakeholderInternal Stakeholder’s Attitude to this Project Internal Stakeholder’s Influence on project Impact of Project on Internal Stakeholder Greek State Concession Company Attiki Odos SA ATTIKI ODOS CONSTRUCTION JOINT VENTURE ATTIKES DIADROMES S.A. Halcrow Bank Tech. Advisor Jacobs Gibb Ltd. and SGI – Trademco

MEGAPROJECT Project Management Project Organisation Client Project Team Size & Structure n/a Contractor Project Team Size and Structure 5000 employees Sub-Contractor Project Team Involvement n/a Project Tools and Techniques Please √ if present, x if absent, leave blank if unknown Life-Cycle Costing Approaches X Stakeholder Involvement □ Building Information Modelling (BIM) □ Project Management Software X Relationship Management Tools □ Project Knowledge Management Tools X Lessons Learnt Transfers □ Team Building Tools □ Competency framework □ Other Tools and Techniques or More Information SECTION 3 - PROJECT MANAGEMENT

Risk Management ProcessesPresent (describe below) □Not Present □ No Information X HR Management ProcessesPresent (describe below) □Not Present □ No Information X Procurement Management ProcessesPresent (describe below) □Not Present □ No Information X Integration Management ProcessesPresent (describe below) □Not Present □ No Information X Scope Management ProcessesPresent (describe below) □Not Present □ No Information X Time Management ProcessesPresent (describe below) □Not Present □ No Information X Cost Management ProcessesPresent (describe below) □Not Present □ No Information X Quality management ProcessesPresent (describe below) □Not Present □ No Information X Communications Management Processes Present (describe below) □Not Present □ No Information X Project Processes SECTION 3 - PROJECT MANAGEMENT

MEGAPROJECT Project Performance Aspects of Performance Concerned with Doing the Project Right Original Targets and changes to targets Actual Achievements Against Targets Performance relating to timeConstruction completed 2003 Concession hand over 2004 Performance relating to costOriginal Target cost approx. 1.2bn€ Project matched the Original Target cost Performance related to achieving specification SECTION 4 - PROJECT PERFORMANCE

Aspects of Performance Concerned with Doing the Right Project Stakeholder or Stakeholder Grouping Original Aims of Project Involvement and Changes to these Aims Achievement of these Aims SECTION 4 - PROJECT PERFORMANCE

MEGAPROJECT Project Environment Legal and Regulatory Environment Legal and Regulatory Project Environment (regionally, nationally and Europe wide) Specific Legal and Regulatory events impacting on the project Olympics Games Political Environment Political Project Environment N/a Specific Political Events impacting on the project Olympics Games SECTION 5 - PROJECT ENVIRONMENT

MEGAPROJECT Project Environment Economic Environment Economic Project Environment Positive Specific Economic Events impacting on the project Olympics Games SECTION 5 - PROJECT ENVIRONMENT

Events and activities relating to project stakeholders Events and activities relating to project management Events and activities relating to project performance Events and activities relating to project environment MEGAPROJECT Project Key Events and Activities Timeline TIME SECTION 6 - PROJECT TIMELINE

MEGAPROJECT Project Key Events and Activities Timeline SECTION 6 - PROJECT TIMELINE