Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Advertisements

Miniature Modular Rack Launcher Combo Senior Design Group 3 Casey Brown Cyril John Keith Kirkpatrick Bryan Rickards.
Preliminary Design Review. Rocket & Payload Schematic.
Tailwinds Flying Club Spring Safety Session Engine Takeoff Lake Elmo Airport (21D)
JET PROPULSION Part 3 The Jet Engine.
Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
Team #2 Solar Car Project Senior Design
AEROSONDE UAV Propulsion system
Architecture Team Industry Day Briefing 17 January, 2002.
Illinois Space Society Tech Team USLI CDR Presentation.
Miniature Modular Rack Launcher Combo Senior Design Group 3 Casey Brown Cyril John Keith Kirkpatrick Bryan Rickards.
1 Air Launch System Project Proposal February 11, 2008 Dan Poniatowski (Team Lead) Matt Campbell Dan Cipera Pierre Dumas Boris Kaganovich Jason LaDoucer.
Vertical Launch UAV Project Plan. ∞ Construct an unmanned aerial vehicle (UAV) with a camera payload ∞ UAV must autonomously navigate with real-time video.
GPS Vehicle Tracking/Payload Release System For Small UAV Project Team
Alex Funiciello Dan Graves Mike Hardbarger Jim Reepmeyer Brian Smaszcz May 14, 2010.
P11213: Modular Student Attachment to the Land Vehicle for Education Jared Wolff, Andrew Komendat, Oyetunde Jolaoye, Dylan Rider.
A Sled System for Motor Vehicle Crash Simulation and Forensic Biomechanics Group Members: Joshua Booren Travis Deason Steve Savas Max Brunhart Customer:
Daniel Graves (ME). Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems  Primary Customer: RIT College of Imaging Science ○ Currently.
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
1 Design Group 2 Kat Donovan - Team Leader Andrew DeBerry Mike Kinder John Mack Jeff Newcamp Andrew Prisbell Nick Schumacher Conceptual Design for AME.
Daimler Chrysler Car Transport Upgrade Team #3 John Barr Aladrian Crowder Hilary Goldman Matt Reber.
PROJECT ICARUS by Noah Michael, Student Project Manager & Dr. Nikos Mourtos, Faculty Project Manager AE 170A/B Course Instructor.
COMPACT MOBILE LIFTING DEVICE Team 3 Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Customer: FraunhoferAdvisor: Dr. Michael Keefe Mission: To design.
P09651 – Visible Spectrum Imaging System Lead: Dave Lewis Brian Russell Aditi Khare.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Miniature Modular Rack Launcher Combo Senior Design Group 3 Casey Brown Cyril John Keith Kirkpatrick Bryan Rickards.
Christopher Barrett (ME) Daniel Graves (ME). Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems Primary Customer: ○ Currently.
Overview of Chapter 6 Douglas S. Cairns Lysle A. Wood Distinguished Professor.
Critical Design Review Team Name University/Institution Team Members Date.
Intercollegiate Rocket Engineering Competition Spring 2015 EML Ethics and Design Project Organization.
 The word "rocket" can mean different things. Most people think of a tall, thin, round vehicle. They think of a rocket that launches into space. "Rocket"
AIAA Hybrid Airliner Competition 2013 The Transporters.
Tropos-1 Hybrid rocket Project
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
Mentors Workshop Pneumatic Sub-System Mark McLeod Team 358 Festo/Hauppauge H.S. F For I Inspiration and R Recognition of S Science and T Technology.
Team Gun Show Final Presentation December 1, 2004 Group Members: Nate Griggs Clay Hamlin Marc Manning Jon Megahy Van Vo Joel Williamson.
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
CanSat Mid-Term Presentation Group Members: Samuel Rustan,Yasmin Belhaj, Andrew Grant, Andrew Guerr, Maxwell Sandler Technical Advisors: Dr. David Cartes,
John Reinhardt FAA Fire Safety Section, AAR-422. BULK LOAD FIRESCONTAINERIZED FIRES FLAMMABLE LIQUIDS FIRE AEROSOL CAN EXPLOSION SIMULATION “Minimum Performance.
Team 6: “Soldier Portable UAV” David Neira TJ Worden Matthew Martin Joshua Mellen Ona Okonkwo Josiah Shearon A IR HERCULES 1.
BRU-38 Bomb Racks TW-1 Stan 1 June BRU-38/A As of 5 June 2009, BRU-38/A bomb racks have replaced PMBRs Differences: –BRU-38/A is shorter and 14.
BQM-167A Advanced UAV System Architecture
Aviation Seminars1 #3661. Which items are included in the empty weight of an aircraft? A- Unusable fuel and undrainable oil. B- Only the airframe, powerplant,
Final report and briefing
Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
ME4182 Midterm Progress Report Team: Future Crew Technologies Chris Biggers Simon Cole Ray Cortés Chuck DeVane Victor Renteria TeJuan Rowe Professor: Dr.
Preliminary Design Review.  Completed practice launch  New motor selection  Corrected simulations  Improved payload construction  Increased.
Final Design Team 6 December 2 nd, UAV Team Specializations David Neira – Power & Propulsion Josiah Shearon – Materials Selection & Fabrication.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
R15901: Student-Initiated-Project SAE Aero Aircaft.
Randy Draeger Grant Stockton David Upp
Detailed Design Review Group P16228: Mike, Zach, Joe, Elijah & Bernie.
Senior Project – Electrical Engineering – 2009 THE WINGMAN: SELF-SPOTTING BENCH PRESS Chris Potts (EE) & Lane Caffaro (ME) Advisors: John Spinelli (EE)
P08452: Reciprocating Compressor Install, Revamp, and Interface Dr. Margaret BaileyFaculty Guide Garry StudleyProject Manager Dave Rigolo Lead Engineer.
Southeast Engineering Center University of Illinois at Urbana-Champaign BENTLEY Handi-Gator Wheel chair storage team Brian Mullen Kyle Kremer Dan Santos.
Planetary Lander PDR Team Name
Voice of Customer Presentation
FINAL REVIEW UAV AIRFRAME B
TOPIC- PNEUMATIC LOCOMOTIVE (Presented by- Group 8 th ) M.B.M ENGINEERING COLLEGE Submitted to- Prof. Shailendra Chawla.
Fuel Cell UAV 2016 PROJECT ADVISORS DR. ZHANG AND DR. DEMUREN
SAE Aero East 2017 MAE 435 Mid-Term Progress Presentation
Lockheed Martin Challenge
Sounding Rocket PDR Team Name
Sounding Rocket CDR Team Name
Mars Rover CDR Team Name
Managerial REVIEW UAV AIRFRAME B
The Ultimate Slider Game
Compressor Operating Instructions
Presentation transcript:

Miniature Modular Rack Launcher Combo Senior Design Group 3 Casey Brown Cyril John Keith Kirkpatrick Bryan Rickards

Overview Problem Statement Product Specifications Concept Generation Final Design Project Status Parts Received Potential Issues Gantt Chart 1

Problem Statement Design and develop a Bomb Rack Unit (BRU) that is attached to the Tigershark UAV capable of housing and launching a cylindrical payload. BRU must contain an electrical box which will allow space for an electrical team to design and integrate an electrical interface to control in-flight operation of the BRU. Provide budget analysis for BRU Design and construction of a prototype 2

Tigershark UAV Platform Specifications: Wing span 21 feet Propulsion - 372cc two stroke 20 gallon fuel tank Empty airframe weight lbs. Gross take off weight lbs. Payload capacity – 50 lbs. One hard-point location per wing for launcher attachment 3

Constraints BRU must not exceed 5 lbs. Capable of holding a payload that is 10lbs Operation in temperature range -20 to 60 degrees C and during rain exposure Retain payload during aircraft maneuvers up to 2GS lateral load and 1G landing shock. 4

Concept Generation 5

Final Design 6

7

8

Project Status Majority of parts have been received Submitted Purchase Orders – Raw Materials – Air Storage Tank – Solenoid Valve – Exhaust Valve Once raw materials received, submit part drawing to machine shop Purchase Items PartVenderPart NumberPriceQuantityTotal Price Air CylinderMcMaster6498K211$ Air TankClippardAVT-24-4$ Check ValveMcMaster3208K22$ RegulatorMcMaster99045K48$ SolenoidcylvalSA31NC$ Exhaust ValveMcMaster4149T41$ Guide_rollerGrainger1ZGT7$48.254$ Ejector_bushingMcMaster6377K114$20.272$40.54 Ejector_springGrainger1NCT2$7.691 PushspringMcMaster9657K48$6.291 ServoFutabaFUTM0513$1251$ Limit SwitchMcMaster7090K37$7.911 RBF PINMcMaster90293A139$ lock nutGrainger3HDT6$ x 1/2 screwGrainger1MU14$ x 1 1/2 screwMcMaster91251A157$6.981 Leveling FootMcMaster2531k61$7.304$29.20 air connectoromega OM-AIR- C PK$5.502$11.00 air hoseomega TYUTH TRBL$ female connectoromega OM-AIR- C PK$ deg elbowomega OM-AIR- C PK$8.251 Raw Materialonlinemetals $ Total $

Parts Received Pneumatic System Solenoid Servo Motor Roller Bearing Sway Brace10

Potential Issues Receiving remaining parts Proper machining BRU overweight Parts with incorrect dimensions Pneumatic system failure – Hook Release – Ejector Time constraint Material Weight AssemblyTotal Hook Eject Mech Safety Ejector Pylon Attach BRU Casing Push Spring Pneumatic System Sway Brace Other Total

12

Questions ???? 13