Accelerator Support and Maintenance Run 14. Maintenance/Changeover Day Major efforts RHIC: Major efforts RHIC: Access 0800-1300hrs. Access 0800-1300hrs.

Slides:



Advertisements
Similar presentations
12GeV Project CD-4 Leigh Harwood Associate Project Manager Accelerator Systems.
Advertisements

Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
RHIC Status Time Meeting 2/10/2015 Then said to us: "You can no farther go Forward upon this crag, because is lying All shattered, at the bottom, the sixth.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Outages During the Run Coping with the Power Company August 9, 2012.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
Problem The basic cells of eRHIC’s two stacked FFAG accelerators are designed for the ~380m radius of curvature of the RHIC tunnel arcs. However, RHIC’s.
Software Tools for Operations and Maintenance Planning Theo Larrieu, Steve Suhring.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
RHIC Status Time Meeting 2/3/2015 He is fixed into the ice at the center to which flow all the rivers of guilt; and as he beats his great wings as if to.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12.
Maintenance and Accelerator Support RHIC Start Up 12.
Maintenance and Accelerator Support RHIC StartUp10.
Maintenance and Accelerator Support RHIC Start Up 12.
Luminosity expectations for the first years of CLIC operation CTC MJ.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RHIC pp 500 GeV development M. Bai C-A Department.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
Acceleration Overview J. Scott Berg Brookhaven National Laboratory January 8, 2014.
Starting cost discussion Vladimir N. Litvinenko Brookhaven National Laboratory, Upton, NY, USA Stony Brook University, Stony Brook, NY, USA Center for.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Accelerator Support and Maintenance Startup for Run 13.
ApEx needs for CeC PoP Experiment December 11, 2015.
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
Maintenance and Efficiency
Cost Optimization Models for SRF Linacs
How to Download, Install, and Update AVG Antivirus?
G0 Backward Angle Accelerator Preparations
Friday 31st August & night
Monday – Morning Fill 3265 stable beams since 1:31
Electron Beam Systems ETC and Methodology
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Presentation transcript:

Accelerator Support and Maintenance Run 14

Maintenance/Changeover Day Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA and CA in the tunnel. RA and CA in the tunnel. Polarity swap for BDH0 magnets. Polarity swap for BDH0 magnets. CeC installation all day (1500 sweep). CeC installation all day (1500 sweep). Sweep 4 o’clock RF at 1300hrs. Sweep 4 o’clock RF at 1300hrs. Ramp tests starting Ramp tests starting Setup with beam ~1800hrs. Setup with beam ~1800hrs. Injectors remain on for development. Injectors remain on for development.

Schedule 0730 Dump, download PASS code Dump, download PASS code. Access to RHIC zone 2 promptly at 0800, all but kicker and RF areas. Access to RHIC zone 2 promptly at 0800, all but kicker and RF areas. RHIC sweeps early afternoon in tunnel. RHIC sweeps early afternoon in tunnel. Zone 2: Final tunnel sweep. Zone 2: Final tunnel sweep. Experiments can stay opened during ramp tests. Experiments can stay opened during ramp tests.

Details, plans and discussion here at 1430hrs Details, plans and discussion here at 1430hrs