Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25, 2014 1.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Advertisements

County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2013 to 2016 Board Transportation Committee June 12, 2012.
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Spotsylvania County Public-Private Transportation Act Spotsylvania County Infrastructure, LLC (SCI) June 2008.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Environmental Assessment Public Meeting
Public Open House February 6, Study Overview - Study Area South North.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Regional Priority Bus Transit Conference June 24, 2009.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
July 4 th Operation Fast Forward Safarian, Kaz, PM.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
STA Safety Project PID #76439 December 12, 2006.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Fehr & Peers | December 13 th, 2011 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
Fehr & Peers | March 13 th, 2012 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Pedestrian Facility Improvement Program
Integrating Transit and Highway Solutions In High Volume Corridors
Four Winds Condominium Association August 2, 2017
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Management Team Meeting #3
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Board Transportation Committee October 13, 2015
FM 518 By-pass Traffic Review
Traffic Study Presented by Keith Wenners, pe, ptoe
Harbour Island Force Main Replacement
Presentation transcript:

Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,

Agenda Introductions Please sign in Study Overview Phase 1 – Short term improvements Phase 2 – Long term improvements Data Collection Activities Initial Observations Agency Meeting Summaries Schedule & Next Steps Steering Committee Meeting Guidance 2

Overall Corridor Activities Study –Phase 1 – Short term Current study effort Discussed in detail in this presentation –Phase 2 – Long term Currently on hold Subject to HB2 prioritization process 3

Study Area Route 28 – Centreville Rd –From South of I-66 –To Liberia Ave Mathis Ave –From Manassas Dr –To Liberia Ave Agencies Included: –Fairfax County –Prince William County –City of Manassas Park –City of Manassas –Virginia Department of Transportation 4

Phase 1 Study Overview Scope of Work Data collection Evaluate existing conditions Develop candidate solutions (under $2M) Develop traffic model Screen candidate solutions Model & evaluate recommended solutions Make recommendations Public involvement Overall Schedule Completed Spring

Data Collection Effort Data collection includes: – Turning movement counts at 33 locations AM and PM peak periods –24 hour tube counts 8 locations –Two-Way Left Turn Section 81 driveways –Intersection Queuing 10 locations –Travel Time Runs Northbound and Southbound AM peak and PM peak periods 6

Data Collection Turning Movement Count Locations –33 locations –Rt 28 (Centreville Rd) –Mathis Ave 7

Data Collection 24-Hour Count Locations –8 locations 8

Data Collection Effort Field data collection is complete –Time frame for collection Prior to end of school year Data summaries being completed –All collection summaries to be completed by July 3, 2014 –Data will be summarized in Tech Memo With raw data on CD Due to VDOT mid July –Data available to agencies and future studies 9

Observed Peak Periods AM Peak –7:30 am to 8:30 am –Heavier congestion when compared to PM –Truck 7% –Directional Flow – NB PM Peak –4:45 pm to 5:45 pm –Truck 3% –Directional Flow – SB 10

Initial Observations Three distinct roadways –Northern Section More expressway like, higher speed Wide median Pedestrian facilities –Middle section More commercial Less access control –Southern portion More urban Divided thoroughfare 11

Initial Observations Approximate Travel Times –Between south of I-66 to Liberia Ave AM Peak –Northbound = 60 minutes –Southbound = 10 minutes PM Peak –Northbound = 15 minutes –Southbound = 20 minutes 12

Initial Observations Queuing Summary –Northbound queues extend from New Braddock Road to Manassas Drive during AM peak period –Southbound queues extend from Compton Road to Upperridge Drive –Area of study focus 13

Initial Observations Two-way left lane volumes - driveway peaks –Very low volumes, out of 81 driveways -24 driveways had zero volume -32 driveways had volume of less than 5 vph -19 driveways had volume between 5-10 vph -6 driveways had volume more than 10 vph (maximum observed was 24 vph) Pedestrians –People walk in street –Pedestrian fatalities 14

Agency Meetings Meetings and highlights –Prince Williams County (June 16) ROW constrained Pedestrian safety –City of Manassas Park (June 17) PM peak - bypass for Route 28 - Old Centreville Road Consider “limited one-way couplet” –Fairfax County (June 19) Neighborhood cut-through traffic (northbound to eastbound) Future plan for express bus service –City of Manassas (June 24) Signal coordination Corridor capacity helps all traffic 15

Scheduled Activities Six month look-ahead –Submit data collection memo, mid-July –Develop website –Steering Committee Meeting –Existing condition evaluation –September Technical Committee Meeting –Begin development of traffic model –Begin development of candidate solutions 16

Schedule of Activities –October Steering Committee –November Citizens Information Meeting –December – Combined Technical/Steering Committee Meeting 17

Next Steps Web Page –Set up project informational page –Will develop content for Tech Committee Review –Load page onto VDOT web site –Available end of July 18

Steering Committee Guidance Steering Committee Meeting –July 21, 2014 Develop agenda items –Project overview –Study area –Two phases – short and long term actions –Scope of Work –Data collection Analysis Alternatives development and screening –Traffic Model –Recommendations –Public involvement –Schedule –Steering Committee actions –Next steps 19

Next Steps Existing Condition Analysis – end of August –Level of Service –Hot spots –Bottlenecks –Crash Analysis Improvement screening process defined Begin development of traffic model 20

Next Technical Committee Next meeting in about 2 months –Likely September 10 (Wednesday) –Agenda Working Meeting Existing condition analysis summary Discuss list of solutions for consideration –Buildable/Affordable –Acceptable to local agencies 21

Next Steps Begin development of traffic model –Obtain VDOT/COG base model –Obtain Prince William County model –Obtain VISSIM model from City of Manassas Park –Create existing conditions plus 5 year land use look-ahead –Use model to evaluate proposed solutions 22

Next Steps Develop initial candidate improvements –List of candidate solutions –Screening Criteria Level-of-service Cost R.O.W impacts Utility impacts Maintenance & Protection of Traffic (MOT) Construction duration Delay Safety Local acceptability 23

Steering Committee October Meeting –Review candidate solutions Construction impacts –Provide input Constructible Concerns –Approve candidate alternatives for additional evaluation 24

Public Involvement Citizen Information Meeting (CIM) –November timeframe –Recommendations for initial meeting Open format Stations for observed problems Recorder, brochure, comment sheet –Discuss existing conditions –Initial observations and issues –Obtain comments Other problems Input on candidate solutions 25

Combined Committee Meeting Technical & Steering Committee Meeting –December timeframe –Review CIM feedback –Discuss candidate alternatives –Generate alternative selection guidance 26

Additional Input Questions / Comments? 27