1 6th FP Coordination Action SPREEX Spill Response Experience Project Conclusions 1 EU-MOP Workshop ETSIN Madrid January 25, 2008 SPREEX Technical Coordinator:

Slides:



Advertisements
Similar presentations
TVET working group contributions. What are the possible options for obtaining decent living and working conditions without joining the informal economy?
Advertisements

Irish Coast Guard Local Authority oil spill Contingency Plans.
Progress Toward Impact Overall Performance Study of the GEF Aaron Zazueta GEF Evaluation Office Hanoi, March 10, 2010.
R&D in statistics An Update. R&D in statistics DOSIS SUP.COM 5th Framework Programme 1st Call Tools & Methods Applications.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
S3 Project aim The main goal, thus expected result, of the S3 project would be to strengthen tools used for Structural Fund policies (SF), through the.
Funding by the Australian Government represented by the Department of Climate Change and Energy Efficiency. Coastal Adaptation.
Provisional FP7-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 2. The Funding schemes.
ISO General Awareness Training
ATC/EMSA/F2 Research&InnovationVertimar Vigo - Spain 1 EMSA: Its role in preventing accidental marine pollution and improving response systems Ana.
SEA-IT Dynamic contingency information system for maritime transportation Presented by Øyvind Endresen & Gjermund Gravir.
Estonian experience in Horizon 2020 Ülle Must
Ship Recycling Facility Management System IMO Guideline A.962
WP1 presentation Christian Jagersma Bucharest, 1-4 March 2010 Agentschap NL (NL Agency)
INTOSAI Public Debt Working Group Updating of the Strategic Plan Richard Domingue Office of the Auditor General of Canada June 14, 2010.
Contributions to Exchange of Experience Initiatives by IMO, EMSA and Regional Organisations Michel Girin Director of Cedre. SaferSeas / Management of Accidental.
SOUTH EAST PLAN South East Plan ESPACE - reminder Aim Incorporation of adaptation to climate change within spatial planning mechanisms at local, regional,
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
1 THE CITY OF TOMORROW AND CULTURAL HERITAGE Thierry PROST EUROPEAN COMMISSION - DG RTD Directorate I - Preserving the Ecosystem Tel: +32/2/ Fax:
Practical aspects Dr. Ir Matthijs Soede Senter/EG-Liaison “Practical Aspects of Preparation FP6 projects Poznan - 21 November 2002 Dr. Ir.
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Managing the Natura 2000 network: state of play, challenges and opportunities.
Title: Climate change impacts on Arctic economy and society Acronym: CLIMARES Coordinator: Ola M. Johannessen, Deputy Coordinator: Stein Sandven Project.
OPRC-HNS Technical Group International Maritime Organization.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
TERRITORIAL EMPLOYMENT PACT OF VALLÈS OCCIDENTAL DESCRIPTION OBJECTIVES OUTLINE THE VALLÈS EXPERIENCE EQUAL SEMINAR.GREECE, September 2002.
SPREEX 6FP CA SPREEX project conclusions on preventive and emergency interventions in response to oil spills oil spills Presentation at EU-MOP Workshop.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
The partnership principle and the European Code of Conduct on Partnership.
Eco-innovation Action Plan Meeting of the High Level Working Group The Eco-innovation Action Plan (EcoAP) review Brussels, 24 March 2015.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
MarNIS Maritime Navigation and Information Services FP6 - Integrated Project.
Accessible and Inclusive ICT European Commission, DG Information Society and Media ICT for Inclusion Unit (H3) Challenge 7 ICT Call 2 Information day Brussels,
Under construction SPANISH PRESIDENCY OF THE EU 2010 FRAMEWORK CONDITIONS ROADMAP 4-May-2010.
Horizon 2020 Overview Jerome de Barros NCP Health.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport policy Bilateral screening:
June 2005 How can satellite data support environmental management in ports? Lheon- A European Space Agency Project by Ana Maiques.
EU policy measures for food waste prevention through social innovation Silvia Gaiani (UNIBO) FUSIONS RPM in Budapest Budapest, June 3rd.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
"The role of Rural Networks as effective tools to promote rural development" TAIEX/Local Administration Facility Seminar on Rural Development Brussels,
Agenda item 4: Draft Offshore Action Plan Gabino Gonzalez, Programme Officer 4th Meeting of the EcAp Coordination Group Athens, Greece, 9-10 October 2014.
OPRC Level 3 Spill Management Roles & Responsibilities.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
WG 2.B Integrated River Basin Management
Presentation to Islands Trust Council December 6, 2017 – Victoria, BC
Preparatory Action 2011 European Voluntary Humanitarian Aid Corps Call for proposal
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
ARCOPOL & ARCOPOL+ projects Atlantic Regions Coastal Pollution Response Interspill - 14th March London Patricia Pérez. ARCOPOL+ technical.
The evaluation process
Juan Gonzalez eGovernment & CIP operations
Information on projects
Coordination and Support Actions
Background CRiteria for the IDentification of Groundwater thrEsholds: BRIDGE Co-ordinator: BRGM (Fr) Groundwater Characterisation workshop, 25 June 2004.
ECONOMICS IN THE WFD PROCESS
Fitness Check of EU Freshwater Policy
A Sea for Life MSFD related projects under Integrated Maritime Policy
WG C – Groundwater Activity WGC-3 Integrated Risk Assessment and Management Wouter GEVAERTS Thomas TRACK Dietmar MÜLLER.
European Commission, DG Environment, Marine Unit
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

1 6th FP Coordination Action SPREEX Spill Response Experience Project Conclusions 1 EU-MOP Workshop ETSIN Madrid January 25, 2008 SPREEX Technical Coordinator: Juan B. Pérez Prat, CIT S.L:

2 The 6FP Post-Prestige call  On March , ERASTAR-ROBMAR TN organised, a 2nd FP6 call for proposals preparation meeting in Brussels, titled “ROBOTICS and POLLUTION”  STREPS RTD projects 1.OSR ships (OS HARVESTER) 2.Wreck interventions (DIFIS) 3.Coastal protection (EU-MOP) Coordination Actions OSR Coordination Action (SPREEX)

3 SPREEX main objectives I  The first SPREEX main objective has been to identify R&D gaps on European Oil Spill Response research and synergies  This implies to start by the identification and prioritization of the main OSR issues impairing an effective OSR and building the updated State of the Art reports on the main affecting issues.

4 SPREEX main objectives II  The second main objective was to provide State of the Art reports and R&D basis on support of the organisations with OSR responsibilities Project Officer kick-off address : –The main customers of SPREEX shall be the OSR related organisations that may find on SPREEX a value for contingency plans, training programs, preparedness and R&D.

5 SPREEX DEPLOYMENT  1 Define 4 pillars or groups of issues influencing OSR performance  2 Draw a list of 6/10 issues on each pillar  3 Appoint 4 WP/pillar leaders at the kick-off meeting  4 Select at the kick-off 4/6 issues per pillar  5 Extend collaborations and  6 Discussion outside the partnership by consultations and workshop

6 The four SPREEX pillars (WP)  WP 1 Lead by SASEMAR-Jovellanos: The organisation of the OSR, includes organisative schemes and information tools and flow, training for all personnel levels (skills and simulation), the legal aspects and identification of responsibilities, and the option of refuge places  WP 2 Lead by Le Cedre OSR operations action means, ships, equipment and their combinations as systems, including pre-outfitting of occasional OSR vessels, the use of robotics and lately we added the use of dispersants, and aerial support means.  WP 3 Lead by SINTEF: ICT detection, tracking and communication technologies, meteorological and oceanographic data acquisition and transmission, aiming at real time tracking and modelling trajectories, providing the data to alert and emergency systems and to decision support systems and operations control.  WP 4 Lead by HDI The fourth pillar covers the socio-economic aspects, the methodologies for the assessment of socio-economic impact, operational risk assessment tools and decision support, biodegradation and remedial actions, clean-up methodologies, and completeness of legislation and liability aspects. Including those of places of refugee.

7 The rapporteur role  The rapporteur is expected to produce in due time (initially three months) the State of the Art report  The WG leader has previously consensuated within his WP the scope of the subject covered, and guides and support the rapporteur work.

8 Contributors and followers roles  The contributors are expected to identify at the beginning the subject and extent of their intended contributions, that may be chapters of the report  The followers will receive the drafts for information and they can send comments and participate actively in the WG meetings and discussions.

9 Pillar/WP 1 Organisation and Communications Partner short name PdELCHICOCTIMMPMSRSACX 1 A Spill response information and communication tools; Protocols; Information flow; Relevant information; Record and reporting; Communication procedures FRCFC 1 B Spill response crisis management and command. Contribution VTMIS. C CRCFC 1 C Places of refuge in crisis situations. C F C F R 5 OSR crisis management training, and use of simulators C CF CR 8 Legal aspects of waste management. Legal aspects of use of dispersants. OSR Contract (Bonn agreement) Completness of liability legislation (lsee also WP 4 4b) RCCCF

10 Pillar /WP 2 Spill Response systems and use of Dispersants Partner short name CEDR E SSP A KEA B CETMA R MARINTE K CSI C ANA M STC/MS R SINTE F 1 VESSELS OPTIMISATION (ORV/VO; compatibility with other activities; operations in adverse conditions; innovations; assistance to OR operations (guidance, night op., …) RCC C C 2 EQUIPMENT OPTIMISATION (booms, skimmers, pumps, settling; evaluation of performances and limitations; innovations) RCF FCC 3 ROBOTICS OPTIMISATION (spill detection and guidance of operations, in wrecks, for sunken spills; innovation) RCC FCC 6 OS Dispersants. Product types. Criteria for application. OS Experiences. Long term effects R C CC

11 Pillar /WP 3 Technologies for Real time detection, tracking Partner short name PdEHIDTMA, SLDHIAURENSISCETMARCSICSTC/MSRSINTEFTHABINTA 1 Real time OS detection and tracking based on airborn & satelite remote sensing technologies CRFC CC 2 Real time metrological and oceanographic data acquisition and transfer - Relevant for oil spill contingency operations CCCC R FC 3 Real time tracking of vessels and OS equipment C C FCCRF 4 Real time Oil Spill modelling of marine oil spills CCRCFF C F 5 Real time computer aided decision support tools and alert/emergency call systems RCCCC F F

12 Pillar /WP 4 Partner short name PdEDHICOCTCSIMCX 1 Methodologies for the integrated assessment of environmental and socio-economic impact RFCCF 2 Knowledge and current research on biodegradation of oil spills and bioremediation technologies C R 3 Clean up and regeneration methodologies of affected areas C R 4 A Places of refuge risk and acceptance criteria plus socio- economic impact. DSS for asignment of a place of refuge CFCC CR 4 B Completness of liability legislation (Who pollutes pays) Places of refuge compensation, liability, insurance issues and OSR funding. FFRC CF

13 Partner participation overview Leader Issues/ reports Contributi ons Active partners WP 1 OSR Organisation and managment SASEMAR Jovellanos WP2 Technical resourcesCEDRE413 8 WP 3 OS Real time InformationSINTEF WP 4 Socio-economic aspectsDHI514 8