Watercycle 3 rd Transnational Meeting Koprivnica, January 16th 2008 Watercycle 3 rd Transnational Meeting Koprivnica, January 16th 2008.

Slides:



Advertisements
Similar presentations
Session 6 Outline Overview of program requirements. Defining your program. Program components. Overview of BMPs. Maintenance inspection. Employee education.
Advertisements

Implementation of waste management plans in Serbia 2013 workshop on Waste Policy Implementation May 2013 Copenhagen.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Methods to Estimate Costs of Environmental Prevention, Protection and Remediation Erkki Ikäheimo.
Area -10,1km2, Inhabitants – (2013) –  Shareholder – Saldus municipality  Operation area – Saldus town  Activities of Saldus Komunalserviss.
IPN-ISRAEL WATER WEEK (I2W2)
Annual Inspections of First Nation Water and Wastewater Facilities Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater.
 Waste Water Treatment Fax:
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Presented to the Connecticut Association of Water Pollution Control Authorities | April 26, 2013 Community Systems 101 Presented by Thom Knowlton, P.E.
Reflections from a World Bank Consultant Ing. Dirk Ossen 29 November 2010.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
Project of sewage system optimisation of the City of Koprivnica.
Public Utility for water supply and sewage „Naissus“ Niš City of Niš, Serbia Local governments: helping each other?
Technical Question Technical Question
Chapter # 1 Introduction To Pollution Prevention.
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
Why Water Projects Fail - Ensuring the Sustainability of Water Projects - Program: STAKEHOLDERS’ SEMINAR Organizer: AWDROP By Toheeb A. Sobowale Lagos.
The Corporation of the Town of Amherstburg Public Works Department March 21, CAPITAL BUDGET.
Structural Funds We have to act now! Javier Güemes Acting Director European Disability Forum.
04/12/04 Environmental Protection Agency/Lithuania OECD/Eurostat JQ Inland Waters Country presentation Lithuania Violeta Juozefaite.
Adour-Garonne Basin Adour-Garonne Basin Management plan and program of measures for A public debate François SIMONET Budapest, 15th October 2008.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
WATERCYCLE planning and managing water resources Adriatic New Neighbourhood Programme INTERREG/CARDS-PHARE Sisak-Moslavina County Koprivnica, 16 th January.
Economically and Environmentally Sustainable Lake Peipsi Area Helena Musthallik Project manager Estonian Ministry of the Interior.
14/10/2015European Agency for Reconstruction1 Water & environment.
1 Consultancy Assignments in Municipal & Environmental Infrastructure (MEI) (incl. water/wastewater, solid waste) European Bank for Reconstruction and.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.
Protocol on Water and Health: added value and challenges for public participation Tsvietkova Anna MAMA-86’s Water and Sanitation Program Workshop on Water.
An Overview of our Community’s Stormwater Management Program
Good investment plan from financiers' point of view Dr.sc.ing. Ilze Puriņa Chairperson of the Board Latvian Environmental Investment Fund.
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
APC-MB05 IS ADVANCED IN WASTEWATER TREATMENT SYSTEMS APC Wastewater Treatment System.
1  Research and development: a permanent priority to tackle environmental challenges and set our offer apart from the others  Sharing of key resources.
1 CONCISE UPDATE ON ACID MINE DRAINAGE IN THE WITWATERSRAND April 2012 UPDATE BY Mr. MARIUS KEET.
Veolia Water Solutions & Technologies
Green Recovery And Reconstruction: Training Toolkit For Humanitarian Aid Water and Sanitation Session 4: Case Study Analysis.
INTRODUCTION 2.EUROPEAN UNION HARMONIZATION PROCESS 3.LEGISLATION STUDIES 4.ADMINISTRATIVE STRUCTURE 5.IMPLEMENTATION PROCESS.
Waste Water Treatment Denis MOTA. Overview Waste water Treatment Treatment in LYON  Pierre Bénite.
Cost recovery study for the Seine Normandie RBMP.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
Ing. Alena Bujnová, Head of Water Policy Department Ministry of Environment of the Slovak Republic.
10 Strategy. 10. Agenda 21 in Maribor, Slovenia Maribor (German: Marburg an der Drau) is the second largest city in Slovenia. The population of Maribor.
Village of Morton Wastewater Treatment. The Village of Morton Wastewater Treatment Department duties Operate and maintain 2 treatment plants (Biosolids.
Our Water Systems
November 29th, 2013 AFD Presentation & focus on Financing of Water / IRWM projects David WILLECOMME
Meeting of the MED POL National Coordinators Barcelona, Spain, May 2005 Progress Report during and activities proposed for Capacity.
Essential Requirements of Pool Management Companies
ENVIRONMENTAL DUE DILIGENCE
Oily water treatment system Oily water treatment
LP Examples Wastewater & Water Quality
Project Management Office
Disposal of used lead batteries and accumulators
Urban planning & Infrastructure optimization
City of Noblesville Wastewater Utility
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Didanovic Snezana Head of Division for Utility Development
TCEQ, Occupational Licensing Wastewater Licensing Overview
Annual Inspections of First Nation Water and Wastewater Facilities
Mrs. Mª Francisca Olmo, R+D supervisor R+D Department, CYCLUS ID, SL
Van Wert, OH Water and Wastewater Element Training
Controlling Project Cost and Schedule
Water Infrastructure Funding and Update on the Amendment I Lawsuit
Jiří Kučera Harmonization of national legislation with Directive 91/271/EEC on urban waste water treatment Czech project of development cooperation in.
Water Pollution Lilly Nichols.
Real-Time Environmental Parameters Monitoring
Presentation transcript:

Watercycle 3 rd Transnational Meeting Koprivnica, January 16th 2008 Watercycle 3 rd Transnational Meeting Koprivnica, January 16th 2008

Town of Velika Gorica Main activity of partner on the project Watercycle: Working out the environmental impact study for the reconstruction of the municipal waste-water treatment plant of Velika Gorica Main activity of partner on the project Watercycle: Working out the environmental impact study for the reconstruction of the municipal waste-water treatment plant of Velika Gorica Environmental impact study is an obligation in the process of acquiring the site-permit for the reconstruction. It shall propose measures for environment protection during the building phase and working lifetime of the waste-water treatment plant.

Why the reconstruction of the waste-water treatment plant is needed: The plant is designed for a total of cca inhabitants, while today Town of Velika Gorica counts over The plant is designed for a total of cca inhabitants, while today Town of Velika Gorica counts over The plant should have been built in phases, but some of the phases have never been finished.The plant should have been built in phases, but some of the phases have never been finished. The plant is designed for a total of cca inhabitants, while today Town of Velika Gorica counts over The plant is designed for a total of cca inhabitants, while today Town of Velika Gorica counts over The plant should have been built in phases, but some of the phases have never been finished.The plant should have been built in phases, but some of the phases have never been finished.

Why the reconstruction of the waste-water treatment plant is needed: The residual sludge is usually dumped on a nearby meadow, which gradually became a marsh, because the equipment for sludge treatment was never installedThe residual sludge is usually dumped on a nearby meadow, which gradually became a marsh, because the equipment for sludge treatment was never installed

Some parts of the plant have never been finished or started working...Some parts of the plant have never been finished or started working... Why the reconstruction of the waste-water treatment plant is needed:

… while the others, due to ageing and limited maintenance, became useless.… while the others, due to ageing and limited maintenance, became useless. Why the reconstruction of the waste-water treatment plant is needed:

Working out an environmental impact study for the reconstruction of municipal waste-water treatment plant of Velika Gorica is the first step towards the solution of many long-term problems in plant’s management. Taking into account that one of the most important natural resources in the area occupied by the Town of Velika Gorica is a large underground drinking water basin, this should be the way towards ensuring its long-term protection. Working out an environmental impact study for the reconstruction of municipal waste-water treatment plant of Velika Gorica is the first step towards the solution of many long-term problems in plant’s management. Taking into account that one of the most important natural resources in the area occupied by the Town of Velika Gorica is a large underground drinking water basin, this should be the way towards ensuring its long-term protection.

Current state of progress: collecting documentation needed for the environmental impact study – existing technical documentation acquired and copied working out the documentation for the bidding, terms of reference – in progress solving the problem of resignation of the project supervisor for Town of Velika Gorica – consultations needed with contracting authoritiy Current state of progress: collecting documentation needed for the environmental impact study – existing technical documentation acquired and copied working out the documentation for the bidding, terms of reference – in progress solving the problem of resignation of the project supervisor for Town of Velika Gorica – consultations needed with contracting authoritiy

Thank you!