Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.

Slides:



Advertisements
Similar presentations
Project Overview 2010 Programme FA: 14 June 2007 Start: 2 Sept 2007 Completion: 31 June 2011 Budget: €10,155,000 (EU), €155,000 (National)
Advertisements

Project ideas for Mozambique Country Context Project 1. Integrated project of electrification using low cost technologies for rural villages and biomass.
Overview of CABURESA Project Capacity Building for Renewable Energy SMEs (and End Users) in Africa Hotel Paradise on the Nile Jinja, Uganda 22 – 23 June.
Renewable Energy in Islamic Republic Of Iran
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
Zambia Environmental Management Agency Development of NIPs for POPs in Zambia By David Kapindula Inception Workshop held at Radisson Blu Hotel, Lusaka.
The Gambia SE4ALL Action Agenda
Report presented by Working Group 1 on the capacity development plan to implement CDM in Viet Nam Task 1 : 1.1. Duration: to January Expected.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF V IETNAM R ENEWABLE E NERGY D EVELOPMENT P ROGRAM (REDP) O PERATIONS.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
PROJECT BACKGROUND & PROGRESS NIGERIA POLYCHLORINATED BIPHENYLS (PCB S ) MANAGEMENT PROJECT (P )
The Project Preparation Phase Inception Workshop and the First Steering Committee Meeting of the UNEP/GEF Project “Piloting Integrated Processes and Approaches.
Sub-Regional Workshop for GEF Focal Points in Asia Bangkok, Thailand 7-8 April 2009 Tracking national portfolios and assessing results.
NCSA Project Management Committee Meeting Yasmine Abdel Aziz Deputy Project Director 21 st January, 2006.
E8-GEF-UNDESA-UNESCAP Financing Sustainable Electrification South-East Asia Dialogues Bangkok, Thailand, September 8-10, 2009 Pro-Poor Public-Private Partnership.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Workshop for EUEI Facilitation and Policy Dialogue By Ghirmai Abraham (PhD), Ministry of National Development and Semereab Habtetsion (PhD) Department.
CTCN: Support implementation of NAMAs
Project Overview, Objectives, Components and Targeted Outcomes
Sub-regional Workshop for GEF Focal Points Eastern and Southern Africa Sandton, South Africa, 3-4 November 2010 Sub-Regional Workshop for GEF Focal Points.
Euei1. 2 Facilitation Workshop and Policy Dialogue Maputo April 2005 Enrico Strampelli European Commission DG Development.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
CDM Status in Pakistan Dr. Syed Sajidin Hussain Clean Development Mechanism Cell Ministry of Environment, Government of Pakistan
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Financing Energy Access: The GEF Experience Dimitrios Zevgolis, Climate Change Specialist Global Environment Facility.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
Poverty Alleviation through Cleaner Energy from Agro-industries In Africa - PACEAA - Introduction to the project 09 November 2007.
1 Palestinian Integrated Rural Environmental Protection Plan By Hossam Zaqoot June 2005 European Commission LIFE Third Countries Palestinian National Authority.
Ministry of Regional Development and Public works Global Environment Facility United Nations Development Programme Integrating Global Environmental Issues.
The GEF/UNDP/UNEP National Communications Programme for Climate Change United Nations Development Programme UNFCCC Workshop on the Preparation of National.
ESCAP’S Pro-Poor Public-Private Partnership (5P) Approach Presented by: Mr. Kohji Iwakami, Economic Affairs Officer, EDD, ESCAP.
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
GIS Development in Romania Vlad Trusca Head of Climate Change Unit Ministry of Environment and Sustainable Development “REC Workshop “Facilitating GIS:
Africa Health Workforce Platform & Observatory Presentation to the 1st conference of the Asia-Pacific Action Alliance on HRH (AAAH): October 2006.
ENABLING ACTIVITIES FOR THE PREPARATION OF THE KINGDOM OF CAMBODIA’S SECOND NATIONAL COMMUNCIATION TO THE UNFCCC (SNC Project) Presented by Long Rithirak.
FOURTH CABINET RETREAT 20 – 21 DECEMBER 2011 PRESENTATION BY MOTIE.
Copyright Reserved GreenTech Malaysia 1 Project Brief/Summary  Project goal is to ensure realization of national green technology policy aspiration and.
Sub-regional Workshop for GEF Focal Points Nairobi, Kenya May 2007.
Country Support Programme GEF Expanded Constituency Workshop March 22 – 24, 2011 Kyiv, Ukraine.
China-Zambia South-South Cooperation on Renewable Energy Technology Transfer PROJECT DETAILS APUA MEETING 8 th April 2015 Annie Banda Chandipo (Dept of.
1 Improvement of Industrial Energy Efficiency in Nigeria Presented by UNIDO.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Piloting Integrated Processes and Approaches To Facilitate National Reporting to Rio Conventions – a GEF/UNEP project CBD SBSTTA 14 May 2010, Nairobi,
Observatories for the Health Workforce in Africa VIII REGIONAL MEETING OF THE OBSERVATORIES OF HUMAN RESOURCES FOR HEALTH IN THE AMERICAS LIMA, PERU
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December Capacity Development for.
INTERNATIONAL RENEWABLE ENERGY AGENCY IRENA Renewables Readiness Assessment Comparative Analysis Silia Kilepoa Ualesi Suva, Fiji Islands 13 November 2015.
BRIEFING SEQUENCE a) MEA FOCAL POINT AGENCIES b) COMMITTEES CREATED FOR THE THREE UN CONVENTIONS c)COMPOSITION OF MEA FOCAL POINT AGENCY COMMITTEE AND.
VANUATU Renewables Readiness Assessment Report November 2015.
Implementation of PRTRs as a tool for POPs reporting, dissemination and awareness raising Steering Committee meeting Madrid November 26.
The Project Workplan and Budget Inception Workshop and the First Steering Committee Meeting of the UNEP/GEF Project “Piloting Integrated Processes and.
1 Stockholm Convention on Persistent Organic Pollutants Clearing-house Mechanism for Information on POPs. Role of Regional Centres.
BRIEF ON RE PROGRAMMES STATUS AND REFITS IN TANZANIA. For International seminar on Global Renewable Energy Support Programme focusing on Globally funded.
Workshop and Steering Committee Meeting Globally-important Ingenious Agricultural Heritage Systems (GIAHS) Project Rome, 7-9 June 2004 Components and Processes.
UNDP/GEF Monitoring and Evaluation Energy Efficiency of Buildings in Bulgaria Inception Workshop.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
IPCC Key challenges facing communities, and approaches to solutions that enhance resilience: through NAPs Climate and Health Summit 2014 Investing.
Environmental Land Management and Rural Livelihoods Project (2013 – 2018) Project Overview Zafar Mahmudov, Project Coordinator.
Energy and Environment Partnership with the Mekong Region Dr. Ludovic LACROSSE EEP Mekong Chief Technical Advisor Vietnam-Finland Aid for Trade Forum Hanoi,
National workshop Pilot testing of Guidelines for updating of national implementation plans to address the new persistent organic pollutants in Abuja,
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
PROGRAMME FOR COUNTRY PARTNERSHIP: Ethiopia 14 April 2016.
THE 6 TH PROGRAM EXECUTIVE COMMITTEE MEETING PROGRESS REVIEW AND WORK PLAN FOR: TDF-2, JSDF, AND EIF By Mr. Sengphanomchone Inthasane, Director, Foreign.
CURRENT STATUS - ENERGY TRANSITION
Cambodia National Work Plan
SACREEE FOR MARKET-BASED ADOPTION OF RENEWABLE ENERGY AND ENERGY EFFICIENCY SADC Renewable Energy Entrepreneurship Support Facility Workshop 27 April.
GIZ MATA Bad Lauterberg, 06 July 2015
IMPROVING JSR PRACTICES AT COUNTRY LEVEL: ACHIEVEMENTS AND GAPS
Ministry of the Environment
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
REC Country Office Macedonia
Presentation transcript:

Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO

Project objective To promote renewable energy (biomass) based on mini-grid as an alternative to diesel based energy generation systems in Nigeria

Project outcomes Preparatory works completed for facilitating replication in the identified potential sites Acceptance by stakeholders on the technical and financial viability of selected site for setting up the biomass based mini-grid for rural electrification Conducive financing and policy environment for promoting investments in rural mini-grids in place Capacity of local planners, institutions and experts for RE based mini-grid enhanced

Outcome 1: Preparatory works completed for facilitating replication in the identified potential sites Project inception workshop organized Project Steering Committee (PSC) inaugurated Project Management Unit (PMU) established National Project Manager recruited Detailed Engineering studies, TOR for EPC contract prepared

Outcome 2: Acceptance by stakeholders on the technical and financial viability of selected site for setting up the biomass based mini- grid for rural electrification Full-scale feasibility study with business plan conducted Investment forum organized Project stakeholders/financiers identified and organized with established Board Project stakeholders agreement developed and endorsed by project owners Project stakeholders exposed to biomass technology through trainings and study tours Project bid documents prepared and launched Bidders have been selected and evaluated Preferred bidder selected for the Engineering, Procurement and Construction (EPC) EPC Contract signed Project equity finance determined and agreed by project owners Project debt finance being processed under the Power and Aviation Intervention Fund (PAIF)

Outcome 3: Conducive financing and policy environment for promoting investments in rural mini- grids in place Consultation and arrangements ongoing with Energy Commission of Nigeria (ECN) and the National Electricity Regulatory Commission (NERC) for the review of policies and documents

Outcome 4: Capacity of local planners, institutions and experts for RE based mini-grid enhanced Training of staff of project owners on Renewable Energy Technologies (RETs) conducted Capacity building for key project stakeholders planned and awaiting approval by Federal Ministry of Finance for implementation

Project budget GEF: 2,681,800USD Co-financing: 11,935,00USD

Enabling Activities to Review and Update the National Implementation Plan for the Stockholm Convention on Persistent Organic Pollutants (POPs) Implemented by UNIDO

Project objectives Update and review the National Implementation Plan (NIP), have it endorsed and submitted to the Stockholm Convention Conference of Parties (COP); and Enable participating stakeholders to manage the additional POPs with newly developed technical skills, expertise and awareness

Project components Coordination mechanism and awareness raising Inventories of new POPs and NIP review National capacities assessment and priority setting for management of new POPs NIP formulation, endorsement and submission Monitoring and evaluation

Project partners and budget Federal Ministry of Environment Federal Ministry of Finance (FMF) Federal Ministry of Health (FMoH) Federal Ministry of Agriculture and Rural Development (FM A&RD) Nigeria Customs Service (NCS) National Planning Commission (NPC) PHCN now Transmission Company of Nigeria (TCN) Basel Convention Regional Coordinating Centre (BCRCC) The Academia Project budget: $225,016

Project progress Steering committee to be inaugurated in April 2014 NIP inventory training to take place in May 2014

Scaling up Small Hydro Power (SHP) in Nigeria Implemented by UNIDO

The project Project objective Promote investment in Renewable Energy Technologies (RETs) Expected focal area outcome: Investments in RETs increased Expected focal area output: 5.9MW RE capacity Installed Project Implementation Cost: 23,267,917.72USD

Project components Human and institutional capacity building Upgrading the capacity for local fabrication of SHP turbines and control systems in Nigeria Promoting investment in SHP sector M&E and knowledge management

Lessons of experience Completed sites WAYA Dam, Bauchi State Capacity: 2x75kW Ezioha – Mgbowo, Enugu State Capacity: 35 kW Kakara Tea Factory, Taraba State Capacity: 2x200kW Local fabrication of SHP turbines and control systems

Lessons of experience (cont’d) Ongoing sites Amoke, Benue State Capacity: 3x40 kW Ikeji-Ile, Osun State Capacity: 2x35kW OOPL Complex, Ogun State Capacity: 15 kW and 2 kW

Progress made CEO endorsement document ready Working on the co-financing letters from partners

Project partners Federal Ministry of Environment Federal Ministry of Power Federal Ministry of Water Resources Energy Commission of Nigeria Bank of Industry State Governments Private Investor