802.1 Motions for EC - 03/2009. Motion n Forward draft PAR for 802.3bd Amendment: MAC Control Frame for Priority-based Flow Control to the EC for approval.

Slides:



Advertisements
Similar presentations
802.16m Closing Report November 11, 2010 Dallas, Tx Session # IEEE m-10/0035.
Advertisements

EC Closing Slides and Motions November 2009 Atlanta, GA.
Doc.: IEEE Submission March 2015 Motions and Supporting Material for EC Meeting Agenda Items Friday, March 13, 2015 Estrel.
Submission doc.: IEEE IEEE q - Conditional Approval to Start Sponsor Ballot Slide 1Bob Heile, Wi-SUN Alliance June 2015.
802.1 – Activities & status Tony Jeffree, WG Chair 22 March 2008.
802.16m Closing Report January 13, 2011 Taipei, Taiwan Session # IEEE m-10/0040r1.
Title: LE TG Closing Report for Session #64 Document Number: h-09/0029 Date Submitted: Nov. 19, 2009 Source: Chair of LE TG: Mariana GoldhamerVoice:+972.
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
802.16m Closing Report September 16, 2010 St. Petersburg, Russia Session # IEEE m-10/0030r1.
802.1 – Activities & status Tony Jeffree, WG Chair 16 July 2007.
Session # Maintenance Task Group Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE maint-08/025.
Doc.: IEEE /0023r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the July EC Closing Meeting IEEE P Wireless RANs.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
Month Year IEEE Motions in July, 2017 Plenary
P802.11s report to EC on request for approval to proceed to RevCom
P b Status Sponsor balloting completed:
P802.11w report to EC on request for approval to proceed to RevCom
IEEE P Motions at the July Plenary EC Meeting
doc.: IEEE <doc#>
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
d 100G to Sponsor Ballot (unconditional)
March Supporting Material and Motions for the Closing EC Meeting March 9, 2018 Hyatt Regency O’Hare Bob Heile, Wi-SUN Alliance.
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
Working Group March Plenary EC Closing Motions Package
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3f RevCom request support package.
p Approval to Start Sponsor Ballot
Motions and Supporting Material for EC Meeting Agenda Items
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
Steve Shellhammer Chair
Executive Committee Meeting
IEEE Motions at the November Plenary EC Meeting
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
IEEE Motions in July Plenary DCN:
P802.11w report to EC on request for approval to proceed to RevCom
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
802.16m Opening (Final) Report
P802.11w report to EC on request for approval to proceed to RevCom
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
802.1 consent agenda items for LMSC Closing Plenary
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
802.1 consent agenda items for LMSC Closing Plenary
802.1 consent agenda items for LMSC Closing Plenary
IEEE Motion at the July EC Closing Meeting
IEEE MEDIA INDEPENDENT HANDOVER
802.1 Motions for EC consent agenda, including supporting material
802.1 Motions & supporting material
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
IEEE MEDIA INDEPENDENT HANDOVER
P b to RevCom: Conditional Approval Request
November 11, 2010 Dallas, Tx Session #70
March Supporting Material and Motions for the Closing EC Meeting March 9, 2018 Hyatt Regency O’Hare Bob Heile, Wi-SUN Alliance.
802.1 consent agenda items for LMSC Closing Plenary
802.1 consent agenda items for LMSC Closing Plenary
802.1 consent agenda items for LMSC Closing Plenary
July 15, 2010 San Diego, USA Session #68
802.1 consent agenda items for LMSC Closing Plenary
802.1 Motions for EC consent agenda, including supporting material
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
July 15, 2010 San Diego, USA Session #68
802.1 Motions for EC consent agenda, including supporting material
802.1 Motions for EC consent agenda, including supporting material
802.1 consent agenda items for LMSC Closing Plenary
Presentation transcript:

802.1 Motions for EC - 03/2009

Motion n Forward draft PAR for 802.3bd Amendment: MAC Control Frame for Priority-based Flow Control to the EC for approval to forward to NesCom. n Proposed: Thaler Second:DeSanti n For: 32 Against: 1 Abstain:9 n EC: Proposed: Jeffree Second: Thaler n PAR: thaler-pfc-frame-par-0309.pdfhttp://ieee802.org/1/files/public/docs2009/bb- thaler-pfc-frame-par-0309.pdf n 5C: 03/new-dcb-thaler-draft-pfc-5c-0208-v3.pdfhttp://grouper.ieee.org/groups/802/PARs/ /new-dcb-thaler-draft-pfc-5c-0208-v3.pdf

MOTION n requests conditional approval of the EC, as per current P&P, to forward P802.1Qay to RevCom following completion of recirculation balloting. n Proposed: Haddock Second: Saltsidis n For: 39 Against: 0 Abstain: 0 n EC proposed: Jeffree Second: n

Supporting material: P802.1Qay n Sponsor ballot closed 27 th Feb n 59 votes = 86% return rate n 53 Approve = 96% n 2 Disapprove, so recirc will be required n 4 Abstain = 6% n Some editorial & technical edits to make n Comments attached to Disapprove ballots: n 03-ec-meeting/802-1ay-D5-0- ResolvedCommentsAttachedToDisapproveBallots.pdf 03-ec-meeting/802-1ay-D5-0- ResolvedCommentsAttachedToDisapproveBallots.pdf n Ballot resolution at May interim

MOTION n requests conditional approval of the EC, as per current P&P, to forward P802.1Qaw to RevCom following completion of recirculation balloting. n Proposed: Haddock Second: Dunbar n For: 35 Against: 0 Abstain: 2 n EC proposed: Jeffree Second: n

Supporting material: P802.1Qaw n Sponsor ballot closed 25 th Feb n 63 votes = 77% return rate n 58 Approve = 100% n 0 Disapprove n 5 Abstain = 7% n Some editorial & technical edits to make, so recirc will be required n Ballot resolution at May interim

MOTION n requests approval of the EC, as per current P&P, to forward P802.1AB- REV to Sponsor Ballot. n Proposed: Haddock Second: Nolish n For: 39 Against: 0 Abstain: 0 n EC proposed: Jeffree Second: n

Supporting material: P802.1AB-REV n Recirculation ballot closed 26 th Feb n Approve: 28 (90%) Disapprove 3 (10%) Abstain: 56 (64%) n 12 comments on latest recirc n “Disapprove” commenters: –David James –Guenter Roeck (voted “No” 2 recircs ago: all his comments were accepted, but he has not responded since, and his address no longer works) –Pat Thaler. Some comments were out of scope; for the others we have suggested that the comments and proposed resolutions be included in the SB cover letter, along with other comments from “Approve” voters n Comments: meeting/comments-802-1AB-REV.pdf

MOTION n requests conditional approval of the EC, as per current P&P, to forward P802.1X-REV to Sponsor ballot following completion of recirculation balloting. n Proposed: Seaman Second:Fuller n For: 33 Against: 0 Abstain: 2 n EC proposed: Jeffree Second:

Supporting material: P802.1X-REV n WG recirc ballot closed 14 th January n Responses: 66 (79%) n Approve: 14 (93%) n Disapprove: 1 (7%), so recirc will be required n Abstain: 51 (77%) n Some editorial & technical edits to make n Comments attached to Disapprove ballots: – ec-meeting/x-rev-d3-8-unresolved- comments.pdfhttp://ieee802.org/1/files/public/Exec_files/files-for ec-meeting/x-rev-d3-8-unresolved- comments.pdf n Ballot resolution at May interim

MOTION n requests conditional approval of the EC, as per current P&P, to forward P802.1Qav to Sponsor ballot following completion of recirculation balloting. n Proposed: Johas Teener Second:Gunther n For: 37 Against: 0 Abstain: 7 n EC proposed: Jeffree Second:

Supporting material: P802.1Qav n WG ballot closed 2 nd March n Responses: 60 (56%) n Approve: 6 (43%) n Disapprove: 8 (57%), so recirc will be required n Abstain: 46 (77%) n Editorial & technical edits to make; anticipating 2 recircs before SB n TR/ER comments and dispositions: – ec-meeting/Comments%20-% Qav.pdfhttp://ieee802.org/1/files/public/Exec_files/files-for ec-meeting/Comments%20-% Qav.pdf n Ballot resolution at May interim

MOTION n requests conditional approval of the EC, as per current P&P, to forward P802.1AR to Sponsor ballot following completion of recirculation balloting. n Proposed: Seaman Second:Salowey n For: 32 Against: 0 Abstain: 3 n EC proposed: Jeffree Second:

Supporting material: P802.1AR n WG recirc ballot closed 10 th March n Responses: 84 (79%) n Approve: 6 (46%) n Disapprove: 7 (54%), so recirc will be required n 66% abstained n Some editorial & technical edits to make n Comments attached to Disapprove ballots: – n Ballot resolution at May interim

Motion n authorizes the Chair to take the necessary steps to initiate generation of an IEEE-SA press release announcing the forwarding of 802.1Qay to RevCom. n Proposed: Young Second:Saltsidis n For: 40 Against: 0 Abstain: 0

EC motion: n EC approves the generation/issue of an IEEE-SA press release for P802.1Qay, based on the draft located here: n es/files-for ec-meeting/p802- 1qay-rlease-draft-1-5.doc es/files-for ec-meeting/p802- 1qay-rlease-draft-1-5.doc n Proposed: Jeffree n Second:

MOTION n approves the liaison letter to the IETF regarding TRILL: n iaison-to-trill-wg-0309.pdf iaison-to-trill-wg-0309.pdf n Proposed: Haddock Second: Fedyk n For: 25 Against: 0 Abstain: 4