WECC PCC Meeting Salt Lake City, UT March 26, 2014.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Operating Reserves --- Again A Discussion Primer
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Public Service Company of New Mexico
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Update on EPA Activities MOPC July 15-16, Current Known Impacts –Retirements –De-ratings –Outage Impact Studies Proposed Clean Power Plan 2 Topics.
Montana Energy Summit Transmission Planning Process April 22, 2008.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
An Overview of Arizona’s Renewable Transmission Planning Process Southwest Renewable Energy Transmission Conference Amanda Ormond – Ormond Group LLC Brian.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Boise, ID June 11, 2014 NTTG Quarter 2 Public Stakeholder Meeting.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Keegan Moyer Manager, Transmission Expansion Planning TEPPC Update July 16, 2014 WECC - Salt Lake City, UT.
Reno, NV June 26,  Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update ◦ SB 123- NVision 3. Generator Interconnection Updates.
WGG Coal Retirement Case Transmission Repurposed for Renewables.
NTTG 0rder 1000 Stakeholder Meeting March 28, 2012 Radisson Hotel Portland, Oregon 1.
CHEAPER AND CLEANER: Using the Clean Air Act to Sharply Reduce Carbon Pollution from Existing Power Plants, Delivering Health, Environmental and Economic.
Common Voice Northwest Energy Task Force Presentation to Port Arthur Rotary Club.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
Montana Ambassadors Helena, Montana February 25, 2011.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Update - RTOs and Capacity January 28, Purpose of Presentation Update the Commission on issues related to – (1) Ameren Missouri – potential Local.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
WECC Response to DOE Funding Opportunity on Regional Planning Northwest Wind Integration Forum Steering Committee January 6, 2010 Tom Schneider Managing.
Transmission Planning at the California ISO September 10, 2015.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
VARIABLE GENERATION OPERATING RESERVE TASK FORCE VARIABLE GENERATION OPERATING RESERVE TASK FORCE Don Badley, Chair VGORTF Report to Operating Committee.
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT Thomas Carr Western Interstate Energy Board State-Provincial Steering Committee Update.
Jan Strack San Diego Gas and Electric TEPPC Overview TEPPC Review Task Force January 11, 2016 Salt Lake City, UT.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Chelsea Loomis, Regional Electric Transmission Planning.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
EIM/EDT Update ColumbiaGrid Planning Meeting June 2, 2011.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Biennial Transmission Plan Studies Update - DRAFT April 6, 2011.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
LNBA Subgroup: Avoided Transmission Value
“Other” Cost Estimates
Reliability Assessment Committee Proposal TSS Meeting
Overview of Northwest Wind Integration Action Plan
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
2017 Midpoint Assessment: Year of Decision October 5, 2017 Local Government Advisory Committee Meeting.
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

WECC PCC Meeting Salt Lake City, UT March 26, 2014

Plan Economic Study Null Case Core Case Scenario Case 2

Economic Study MW requires 500 kV line from Great Falls to Midpoint 1,500 MW requires lines and series capacitor upgrades at Burns, Malin and Midpoint

TEPPC PC1 Projects 4 Five core cases where created to evaluate the CCTA project performance under a variety of NTTG transmission loading conditions The CCTA projects provide adequate transmission for the NTTG 2022 footprint loads and resources modeled

Scenario Case 3,000 MW scenario from Wyoming to Southern Nevada –Requires remedial actions to mitigate violations for DC line bipole outage 2,650 MW scenario – –DC bipole outage produces few violations and FACRI action can result in no violations 5

Q January 2 Regional Transmission Plan (RTP) Data Gathering and Economic Study Request (ESR) Window Opens January 31 1 st Data Submission Deadline (NTTG Footprint requirements) June 11 (Boise, ID) Q2 public meeting to present Draft Biennial Study Plan to stakeholders and discuss updates on FERC Orders January 22 (Portland, OR) Q1 public meeting to discuss NTTG Regional Order 1000 RTP and ESR Process April 15 Deadline to cure Q1 data submission deficiencies June 24 ( SLC, UT) Steering Committee meeting and vote to approve or remand the Draft Biennial Study Plan June 1 Regional Economic Study Plan developed Q Order No Update – Key Milestones and Deliverables May 15 Draft Study Plan, including cost allocation scenarios, February 28 (Folsom, CA) Interregional information exchange Draft Schedule - subject to change March 30 and 31 2 nd Data Submission Deadline (ESR’s and project and cost allocation data) 6

12 September 16 (Location: TBD) Q3 public meeting to discuss development of the RTP, updates on FERC Orders, and Economic Study Results December 2 (SLC, UT ) Q4 public meeting to present status report on development of RTP and receive comments Q5 Planning Committee facilitates stakeholder review and comment on the Draft RTP Plus Q5 ESR deliverables Q7 Draft Final Regional Transmission Plan Review Plus Q6 ESR deliverables September 30 Regional Economic Study Complete; or Sponsor notified with explanation and estimated completion date Q6 Cost Allocation Committee allocates costs of projects selected into the draft RTP. Draft Final Regional Transmission Plan Produced, Plus Q7 ESR Deliverables Q8 Regional Transmission Plan Approval Plus Q8 ESR Deliverables Q3-Q4: 2014 Q5-Q8: 2015 Order No Update – Key Milestones and Deliverables December 31 Planning Committee produces a Draft Regional Transmission Plan, including Economic Study Results Draft Schedule - subject to change 7

Regional Transmission Planning Process Changes Cost Allocation Pre-Qualification Data Gathering Study Plan Analysis Draft Plan 8

Cost Allocation Pre-Qualification Pre-qualification required for project sponsors seeking cost allocation for a project –Technical expertise –Financial expertise –Financing plan –Ability to maintain and operate Great Basin Transmission’s pre-qualification submission was approved 9

Load and Resource Data Submittal Data was received from IPC, PAC, NWE, PGE Comparison of data for Q and Q Yr Load forecast went down by 1099 MW 10 Yr Resource forecast went down by 7573 MW Wind down 5000 MW Coal down 1000 MW Market purchases down 1000 MW Balance of reduction in hydro, bio-mass, geothermal and oil 10

Study Plan Changes Quarter 2 Initial Regional Plan –Prior Regional Transmission Plan projects –Full Funders Local Transmission Plan projects Alternative Projects Public Policy Cost Allocation Scenarios 11

Analysis Changes Quarter 3 and 4 Comparison of Alternative Projects to the Initial Plan –One or more Change Cases –Determine if the Change Case is more efficient or cost effective Analysis Criteria –Capital Related Costs –Energy Losses –Reserves 12

Public Policy Requirements and Considerations Public Policy Requirements are established by local, state, or federal laws or regulations and regulations promulgated by a relevant jurisdiction Public Policy Considerations are not established by local, state, or federal laws or regulations 13

Selection of Public Policy Considerations to Study The Planning Committee will determine the Public Policy Considerations to be included in additional study analysis The additional study analysis results are informational only and may inform the Regional Transmission Plan, but will not result in the inclusion of additional projects in the Regional Transmission Plan 14

Renewable Northwest Project Request Understand the transmission impacts associated with retiring 1) Colstrip units 1&2 and 2) Colstrip units 1, 2, 3, & 4 Replacing the respective amounts of capacity with proportional amounts of wind capacity in Montana 15

Northwest Energy Coalition Request Assess an accelerated phase out of coal plants and enhancement of clean energy resources (energy efficiency, demand response, distributed generation, and utility-scale renewable resources) Assess how to maximize the delivery of renewable energy and minimize new transmission TEPPC PC6 Study Case 16

Questions?